Loading...
HomeMy WebLinkAboutMélange Flats Elevator #2 aka Southwest SubmittalELEVATOR SUBMITTAL PACKAGE Date Submitted: DECEMBER 10, 2021 For Project: MELANGE FLATS TK Elevator Job Number: 140-1739-02A Elevator(s): 2 (SIMPLEX) Located At: 920 VETERANS WAY CARMEL, IN 46032 Company (Mail To): ONYX AND EAST 1828 N. CENTRAL AVE., STE. 100 INDIANAPOLIS, IN 46202 GC Phone: Attention: DAVID BENNETT PRELIMINARY DRAWINGS FOR APPROVAL 01/31/22 INSTRUCTIONS Failure to complete the Contractor Verification Sheet and Approve drawings WILL result in delay of fabrication and shipping of equipment. Q Check ALL hoistway dimensions, elevator travel (floor to floor heights), pit depth, clear over-head, machine room dimensions and entrance wall thickness. Mark-up drawings accordingly, and remit with necessary approval (i.e: approved or approved as noted) to the Local TK Elevator Office. Q Complete all information on the Contractor Verification Sheet. Q Provide a firm on-site date to the Local TK Elevator Representative. Any previously quoted manufacturing lead-times for material delivery, shall begin the date of receipt by TK Elevator of ALL approvals, confirmations, and a fully executed subcontract agreement. The installation start date cannot be any earlier than the delivery of the material to the site and the completion of all items shown on the Pre-Installation Checklist sent to you in this submittal package. INFORMATION "ALL DEPICTIONS, DIMENSIONS, MEASUREMENTS AND ALL OTHER INFORMATION CONTAINED IN THESE DRAWINGS ARE FOR ILLUSTRATION PURPOSES ONLY. THE CONSTRUCTION MANAGER AND/OR GENERAL CONTRACTOR BEARS FULL RESPONSIBILITY TO PROPERLY BUILD THE NECESSARY HOISTWAYS, CONTROL-ROOMS, AND/OR MACHINE-ROOMS TO ACCOMMODATE THE ELEVATOR EQUIPMENT PURCHASED." IN NO EVENT WILL TK ELEVATOR CORPORATION BE LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL, OR INDIRECT DAMAGES (INCLUDING BUT NOT LIMITED TO, DAMAGES FOR LOSS OF PROFITS, DELAY, BUSINESS INTERRUPTION,) ARISING OUT OF THE USE OF THESE DRAWINGS, THE INABILITY TO USE THESE DRAWINGS (INCLUDING ANY INFORMATION CONTAINED THEREIN), OR ANY TRANSACTIONS RELATED TO THE USE OF THESE DRAWINGS. BECAUSE SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES, THE ABOVE LIMITATION MAY NOT APPLY TO YOU. IN SUCH STATES, TK ELEVATOR CORPORATION'S LIABILITY IS LIMITED TO THE GREATEST EXTENT PERMITTED BY LAW. REMITTANCE INFORMATION: PLEASE REMIT ELECTRONIC COPY OF ALL CONFIRMATIONS AND APPROVALS TO: TO: RICK WILHITE EMAIL: PHONE: 317-595-1125 PACKAGE CONTENT: Contractor Verification Sheet Instruction and Information Sheet Approval/Approved Sheet Layout Sheet Entrance Sheet(s) - The enclosed submittals are in compliance with conditions of TK Elevator's subcontract or supplying and installing materials and or systems for the project referenced above. - Enclosed drawings are for approval purposes only and not to be used for construction. CONTACT INFORMATION: Sales Representative: RICK WILHITE Construction Superintendent: BRAD BOLTON Project Manager: 317-595-1125 317-595-1125 317-595-1125 General Contractor Owner Job-Site Pre-Installation Checklist (See G.C. Site Binder) TKE-Instruction-Information / [Border] TKE-Instruction-Information 01/31/22 Architect/GC Verification Form ELEVATOR DESIGNATION FACTORY JOB NUMBER:REQUIRED POWER CONFIRMATIONREQUIRED ENTRANCE INFORMATION APPROVED BY:____________________________________________________________ DATE: _______________ FAILURE TO FULLY COMPLETE THIS SHEET MAY RESULT IN DELAY OF SCHEDULE PLEASE CONFIRM THE FOLLOWING INFORMATION BUILDING POWER: _________________________________ Q CONFIRMED STARTING TYPE: _________________________ Q CORRECTED: VOLTS: _______ PHASE: _______ CYCLES: _______ MAIN EGRESS FLOOR (Fire Service): DESCRIPTION OF SELECTED CAB FEATURES <VLT> <PH> <CYC> <MAINEGRESS> FEATURES FOR YOUR FIXTURES OILVerificationSheet <APPROVALSHEETSIGNATURE><APPROVALSHEETDATE> Requested Elevator Material Delivery/Start Date: ____ / ____ / _____ (Delivery of all remaining material, less any early shipment) EMERGENCY POWER VERIFICATION MATERIAL RELEASE FORM <MNT><DAY><YR> CUSTOMER APPROVAL BOX CONFIRMED CORRECTED REQUIRED CLEAR OVERHEAD: HOISTWAY SIZE: HAND OF DOOR: PIT DEPTH: MACHINE ROOM WIDTH: NET TRAVEL: Q REQUIRED CAB INFORMATION Q MACHINE ROOM LENGTH: ***NOTE*** IF CORRECTIONS ARE REQUIRED PLEASE NOTE ON CORRESPONDING SUBMITTAL DRAWINGS BELOW ***NOTE*** (GC to provide frame size. Please reference the (x) dimension noted below for wall size) ***NOTE*** Jamb Mounted Controllers Require a Minimum wall thickness of 8 1/2" at the controller landing (Top Floor) ***NOTE*** (Elevator platform will be designed to accomodate 3/8" flooring) ***NOTE*** (Elevator flooring is by others. Not included in material order) <ALTEGRESS>ALTERNATE FLOOR (Fire Service): QQ CONFIRMED CORRECTED REQUIRED QQ CONFIRMED CORRECTED REQUIRED QQ CONFIRMED CORRECTED REQUIRED QQ CONFIRMED CORRECTED REQUIRED QQ CONFIRMED CORRECTED REQUIRED QQ CONFIRMED CORRECTED REQUIRED DEC 10 2021 8:22 AM 2 208 VOLTS A.C., 3 PHASE, 60 CYCLES SOLID STATE STARTING ENTRANCE WALL DETAIL MASONRY WALL TYPE FRAME DRYWALL TYPE FRAME Elevator Entrance Frame Elevator Entrance Frame Elevator Entrance Frame"X""X""X" * X = Wall thickness COMBO DRYWALL & MASONRY MASONRY TYPE FRAMEŹŹ ŹŹŹŹŹŹŹCAB TYPE: APPLIED PANEL REVEALS: F-112 BLACK CAB CEILING: 6-9 LED FIXTURES IN METAL PAN CEILING CEILING FINISH: #4 STAINLESS STEEL CAB DOOR: #4 STAINLESS STEEL CAR SILLS: ALUMINUM CAB HANDRAIL(S): (3) 1 1/2" CYLINDRICAL HANDRAIL(S) FINISH: #4 STAINLESS STEEL CAB PROTECTION: PAD BUTTONS PROVIDED. (1) PADS CAB FLOORING:FINISH FLOOR WEIGHT (3/8" MAX. THICKNESS) = 111 LBS. BY OTHERS CAB PANEL COLOR: <PLASTICLAMINATED> THIS ELEVATOR HAS BEEN PROVIDED WITH THE FOLLOWING BACK UP POWER PROVISIONS:__________________ CONFIRMED Q CORRECTED: ___________ Line 1: ***Note*** Jamb Mounted controllers have AUX contacts provided by TK Elevator. For Machine Room applications AUX contacts are to be provided by others. Q <QTYELEV> FLOOR MARKING: WALL TYPE: WALL THICKNESS (X): ENTRANCE DOOR FINISH: ENTRANCE FRAME FINISH: 4 <WALLTYPE><WALLTHK><POWDERCOAT><POWDERCOAT> 3 <WALLTYPE><WALLTHK><POWDERCOAT><POWDERCOAT> 2 <WALLTYPE><WALLTHK><POWDERCOAT><POWDERCOAT> 1 <WALLTYPE><WALLTHK><POWDERCOAT><POWDERCOAT> 10_D_O_C POSITION INDICATOR ILLUM: BLUE PUSH BUTTON ILLUMINATION: BLUE 01/31/22 ELEVATION VIEW THIS DRAWING AND ALL INFORMATION THEREON IS THE PROPRIETARY PROPERTY OF TK ELEVATOR AND MUST NOT BE MADE PUBLIC OR COPIED. THIS DRAWING IS LOANED SUBJECT TO RETURN ON DEMAND AND IS NOT TO BE USED DIRECTLY OR INDIRECTLY, IN ANY MANNER DETRIMENTAL TO THE INTEREST OF TK ELEVATOR. FOR: MELANGE FLATS ADDRESS: 920 VETERANS WAY CITY: CARMEL, IN 46032 4 OF 7 DATE A SHEETJOB NUMBER 12/10/2021 REVDRAWN RW 140-1739-02ATK Elevator FRONT PIT PLAN POSITION OF SUMP PIT OR DRAIN CANNOT BE RELOCATED FRONT HOISTWAY PLAN SECTION[LH] 7'-10" BETWEEN CENTERLINE OF JACKS 7'-3" DISTANCE BETWEEN RAILS 7'-10 7/16" BACK TO BACK RAILS 4'-4"4'-4" 8'-8" HOISTWAY WIDTH 4 3/4" 4 3/4"6'-11"HOISTWAY DEPTH3'-7 3/4"1'-0"7 9/16"SJACKSSRAILS120 HYDRAULIC FLUID REQUIRED IN SYSTEM = GALLONS HEAT PRODUCED BY ELEVATOR EQUIPMENT IN HOISTWAY = BTU/HR19737 SUMP PIT SIZE TO BE DETERMINED BY GENERAL CONTRACTOR 5" PIT LADDER ŹŹ ŹOF TARGET HOLES = TARGET HOLE GUIDE RAILSTO OF TARGET EDGE OF PLATFORM FACE OF RAIL 1 1/2" 1 13/16" S S SS 7'-6 5/8"SŹ ŹŹŹ ŹADA PHONE PROVIDED POWER UNIT INFORMATION WIDTH DEPTH HEIGHT WEIGHT W/OIL (LBS) 6'-0 1/2" 1'-10 15/16" 3'-9" 2,710 Ɣ A PLUMB HOISTWAY BUILT ACCORDING TO CODE AND SIZES SHOWN. Ɣ ADEQUATE SUPPORT FOR JACK, GUIDE RAIL BRACKETS, AND BUFFERS (FOR REACTIONS SHOWN) Ɣ HOISTWAY BARRICADES AND ALL CUTTING AND PATCHING TO INSTALL HOISTWAY ENTRANCES, SILLS, HALL FIXTURES, OIL, AND ELECTRIC LINES. Ɣ PIT LADDER PER CAR (ACCORDING TO CODE) NOTE: MUST BE CLEAR OF ALL ELEVATOR EQUIPMENT. Ɣ LEAVE OFF WALL PER ROUGH OPENING DIMENSIONS WHERE ENTRANCE IS INCLUDED. SEE INSTALLATION PROCEDURES FOR FRAME-TO-WALL INTERFACE DETAILS TO ENSURE CONFORMANCE WITH LABELED ENTRANCE INTERFACE CONSTRUCTION. AT CONTROLLER FLOOR, LEAVE OUT ENTIRE WALL. SEE ENTRANCE DRAWING FOR DETAILS. CONTROLLER @ FLOOR: Ɣ POCKETS IN CORRIDOR WALL FOR HALL FIXTURES. NOTE: MUST BE LOCATED AS DIRECTED BY ELEVATOR CONTRACTOR Ɣ SMOKE SENSORS (AS REQUIRED) Ɣ ELEVATOR MEETS ASME A17.1 2016 CODE. Ɣ A PROPERLY VENTED HOISTWAY AND MAINTAINED BETWEEN 32ƒF (0ƒC) AND 104ƒF (40ƒC) WITH NON-CONDENSING HUMIDITY OF 10-95% PER LOCAL BUILDING CODE. Ɣ SUMP PIT OR DRAIN AS REQUIRED BY LOCAL CODE BY GENERAL CONTRACTOR. GENERAL DATA 2 F2 F1 OMEGA RAIL Ź ŹŹƔ GENERAL CONTRACTOR MUST FORWARD POWER REQUIREMENTS TO THE ELECTRICAL CONTRACTOR. NOTE: A FOURTH WIRE OF SAME SIZE AS THREE PHASE WIRES IS REQUIRED FOR GROUNDING PURPOSES TO MINIMIZE ELECTRICAL NOISE INTERFERENCE. THE GROUNDING WIRE MUST BE CONNECTED TO THE BUILDING ELECTRICAL SYSTEM GROUND. Ɣ A MEANS TO AUTOMATICALLY DISCONNECT THE MAIN LINE PER POWER SUPPLY TO THE ELEVATOR PRIOR TO THE APPLICATION OF WATER IN THE ELEVATOR HOISTWAY WILL BE FURNISHED BY THE ELECTRICAL CONTRACTOR THIS MEANS SHALL NOT BE SELF RESETTING. Ɣ DEDICATED 120 VOLT, 15 AMP SERVICE, ALONG WITH TELEPHONE CIRCUIT WHEN REQUIRED TO TERMINALS OF EACH REQUIRED CONTROLLER (AS LOCATED ON ENTRANCE PAGE) FOR THE FOLLOWING: - CAR LIGHT AND ALARM CIRCUIT WITH GFCI PROTECTION PER NEC/CEC. - GROUP CONTROL WHEN REQUIRED. ACCESS TO THESE COMPONENTS WILL BE FROM INSIDE THE HOISTWAY. THIS WILL REQUIRE TK ELEVATOR TO BE ON SITE. NOTE: IF STANDBY POWER IS SUPPLIED TO ELEVATOR, CAR LIGHT AND ALARM CIRCUIT AND GROUP CONTROL SERVICE MUST BE STANDBY POWER BACKED. Ɣ LIGHTING (MINIMUM 200LUX/19FT. CANDLES) AND SWITCH, CONVENIENCE OUTLETS WITH GFCI PROTECTION PER NEC/CEC. LIGHTING IS REQUIRED AT THE PIT LEVEL AND THE CONTROLLER LANDING. Ɣ A LIGHT SWITCH LOCATED 4'-0" ABOVE BOTTOM LANDING NEXT TO THE TOP RUNG OF THE LADDER. Ɣ A LIGHT SWITCH LOCATED 4'-0" ABOVE THE CONTROLLER LANDING FLOOR. Ɣ CONDUIT AND WIRING FROM HOISTWAY TO ELEVATOR MONITORING PANELS BY OTHERS. Ɣ PROVIDE A POWER TRANSFER WARNING CONTACT THAT CLOSES 20 SECONDS PRIOR TO TRANSFER IN EITHER DIRECTION AND IT OPENS WHEN TRANSFER IS COMPLETE. Ɣ TOTAL FULL LOAD UP SPEED AMPS IS BASED ON 100% OF ELEVATOR CAPACITY, THE VALUE NEEDED FOR EMERGENCY POWER SIZING. Ɣ THE HYDRAULIC MOTORS ARE RATED FOR INTERMITTENT DUTY (SEC. 620-13 AND 430-33). BRANCH CIRCUIT CONDUCTORS CAN BE SIZED FOR AN AMPACITY 90% OF THE MOTORS NAMEPLATE RATING AS DETERMINED BY (SEC. 430-22 [E]) BY OTHERS ELEVATOR DESIGNATOR POWER SUPPLY HORSE POWER STARTING A.C. AMPS TOTAL FULL LOAD UP SPEED MOTOR A.C. AMPS RATED A.C. AMPS SHORT CIRCUITCURRENT RATINGS (AT 600V OR LESS) THE FOLLOWING CONDITIONS MUST BE MET BEFORE INSTALLATION IS COMPLETED AND ARE NOT INCLUDED IN THE ELEVATOR CONTRACT ELECTRICAL DATA 2 208 40 368 176 122.5 10,000 AMPS S CAR 6'-8" MIN. CLEAR INSIDE 7'-0" PLATFORM WIDTH2"2" 10"10"5'-5"MIN. CLEAR INSIDE6'-3"PLATFORM DEPTH1 3/4"6 1/4"6'-0" ROUGH OPENING @ TYP. FLR. 2'-8" 1'-1" 3'-6" CLR. OPENING 4'-1" 5 7/8" (TYP)8 1/4" SJACK GUIDEƔ BREAKERS AND DISCONNECT PROVIDED BY TK ELEVATOR AMP CIRCUIT BREAKER PROVIDED IN CONTROLLER BY TK ELEVATOR. HYDRAULIC ELEVATOR CONTRACT DATA TYPE: ELEVATOR DESIGNATION: NOTE A: OIL PIPE LINES AND FITTINGS SHALL BE PROPERLY SUPPORTED TO RELIEVE STRAIN. NOTE B: ALL REACTIONS INCLUDE ALLOWANCE FOR IMPACT. NOTE C: TK ELEVATOR TO BE NOTIFIED OF ANY CHANGE TO ELEVATOR HOISTWAY OR MACHINE ROOM DESIGN. NOTE D: ELEVATOR DESIGN & FABRICATION BASED ON ESTIMATED CAB WEIGHT SHOWN. LAYOUT APPROVAL WILL BE CONSTRUED AS FINAL CAR WEIGHT, UNLESS OTHERWISE NOTIFIED. SPEED: CAPACITY: CAR ENCLOSURE: DOOR HAND: PLATFORM THICKNESS: FINISHED FLOOR: CAR WEIGHT: TELEPHONE:PIT LADDER: POWER UNIT:POWER SUPPLY: STARTING:OPERATION: GLOJ:GLOPU: OVER TRAVEL: BOTTOM: TOP: JACK MODEL: PLUNGER WEIGHT: PLUNGER WALL THK: BETWEEN PIT FLOOR & CAR BOLSTER ON COMPRESSED BUFFER: PLUNGER O.D: NET AREA: BOTTOM CAR RUNBY: CAR BUFFER STROKE: EST. WORKING PRESS: (QTY) SPRING(S) #: TOTAL SPRING(S) CAPACITY: CAR FRAME S = I = A =A = I = S =S = I = R = RAIL FORCES F1 F2 SEISMIC RAIL FORCES ZONE: CAR STATION FEATURES: CAR RIDING LANTERN: PUSH BUTTON MARKINGS: F1 = F2 = FORMED CROSSHEAD FORMED BOLSTER FORMED STILE UPPER: LOWER: UPPER: LOWER: MDL: MDL: JACK REACTION (EA.):CAR BUFFER REACTION: PLUNGER LENGTH: UPPER: MDL: LOWER: CYLINDER LENGTH: CYLINDER O.D: WALL THK: endura 35 A 2 150 FPM UP / 150 FPM DOWN 3,500 LBS TKAP LEFT FRONT 3 3/8" BY OTHERS 2,701.00 LBS BY ELEVATOR COMPANY BY ELEVATOR COMPANY EM-190, 40 HP 208 V 3 Phase 60 Cycles SOLID STATE STARTING TAC32 6,201 LBS 7,131 LBS 1'-0"8 1/2" 2.5T III TWIN/TELE 930.00 LBS 15'-8"13'-11 9/16" 13'-9 9/16" 0.375"0.25"0.25" 2.5"3.75"5.0" 13'-9 1/16" 7 1/4"1/4" 23.693 SQ.IN. 6" 2 1/2"331 PSI (2) 75902 20,446 LBS 3.27 9.82 1.85 7GA x 6" x 2 1/2" 5.67 23.39 2.40 7GA x 8 1/4" x 2 3/4" 1.38 2.17 1.01 10GA 567 LBS 397 LBS N/A N/A Traditional Fixtures, T2 Buttons, Alarm Button, Telephone, Position Indicator 1, 2, 3, 4 Strike 3'-3 7/8" 7,797.00 LBS 18,180.00 LBS Ɣ PRIMARY FIRE SERVICE LOCATED AT FLOOR: Ɣ ALTERNATE FIRE SERVICE LOCATION AT FLOOR: 1 @ FLOORS 1,2,3,4 5'-0"PIT DEPTH2 1/2"OIL LINE7'-4"CEILING HEIGHT7'-11"OVERALL CAB HEIGHT34'-11"NET TRAVEL9'-5"UNDER CROSSHEAD7'-0" CLEAR OPENING HEIGHT8'-11" TOP OF O.A. CABIN FULL TOP OVER TRAVEL4'-0"REFUGE SPACE12'-11"CLEAR OVERHEAD2"4'-7 3/4" SAFETY BEAM 8'-3" ROUGH OPENING HEIGHT4'-0" MIN.PIT LADDER8'-8" ROUGH OPENING FOR CONTROLLER ENTRANCE @ FLOOR 2FRONT OF HOISTWAYREAR OF HOISTWAY300 N 5" S JACK (TYP.)SELECTORƔ SAFETY BEAM REQUIRED PER OSHA 1926 502 PROVIDED AND INSTALLED BY OTHERS, AS DIRECTED BY TK ELEVATOR FIELD OFFICE DESIGN LOAD = (STATIC, NOT IMPACT)5,000 LBS Ɣ HEAT SENSOR REQUIRED AT CONTROLLER FLOOR TO ACTIVATE SHUNT. HEAT SENSOR IS TO BE LOCATED WITHIN 2'-0" OF THE SPRINKLER HEAD. 3" LEAVE A ROUGH OPENING FROM SIDE WALL TO SIDE WALL WITH A HEADER SUPPORT (TO WITHSTAND 500 LBS.) AT A MINIMUM OF 1'-3" & MAXIMUM OF 2'-0" ABOVE THE CLEAR OPENING HEIGHT AT THE TOP & BOTTOM / MAIN LANDINGS. 01/31/22 "PLEASE REFERENCE ASME A17.1 (2.2.2) FOR SUMP PIT REQUIREMENTS" REFER TO SECTION SHEET FOR CONTROLLER ENTRANCE ROUGH OPENING WIDTH 5 OF 7140-1739-02A 12/10/2021 RW A DATE JOB NUMBER SHEETDRAWN REV THIS DRAWING AND ALL INFORMATION THEREON IS THE PROPRIETARY PROPERTY OF TK ELEVATOR AND MUST NOT BE MADE PUBLIC OR COPIED. THIS DRAWING IS LOANED SUBJECT TO RETURN ON DEMAND AND IS NOT TO BE USED DIRECTLY OR INDIRECTLY, IN ANY MANNER DETRIMENTAL TO THE INTEREST OF TK ELEVATOR. FOR: MELANGE FLATS ADDRESS: 920 VETERANS WAY CITY: CARMEL, IN 46032 TK Elevator ³WHERE DISTANCE BETWEEN FLOORS EXCEEDS THE MAXIMUM BRACKET SPAN, BRACKET SUPPORT MUST BE PROVIDED MIDWAY. BRACKET SUPPORT WILL NEED TO BE SUPPLIED BY OTHERS TO ALLOW FOR RAIL ATTACHMENT. INSIDE SUPPORT SHALL NOT BE RECESSED BEHIND WALL SYSTEM AND SHALL NOT BE PROUD BY MORE THAN 1/4´ AT ANY POINT. COORDINATE WITH TK ELEVATOR SUPPORT/OPERATIONS MANAGER´ FOR ELEVATOR: 2 IF A CUT STARTER RAIL IS CALLED FOR IN THE STACK, CONFIRM THE NUMBER OF SPLICES PRIOR TO CUTTING 8'-8" HOISTWAY WIDTH 6'-11"HOISTWAY DEPTH4'-7 3/4"SRAILS6'-0" ROUGH OPENING WIDTH @ TYP. FLR. BRACKET LOCATION DIMENSIONS RAIL SECTION DIMENSIONS 8'-3" ROUGH OPENING HEIGHT2"4'-7 3/4"SAFETY BEAM5'-0" PIT DEPTH 12'-11" CLEAR OVERHEAD FRONT OF HOISTWAY REAR OF HOISTWAY 34'-11" NET TRAVEL RAIL STACK SECTION VIEW RAILS AND BRACKETS - TOTAL QUANTITY RAILS BRACKETS QTY: RAIL TO WALL: (7) 16 FT SPLICES:6 LEFT HAND RIGHT HAND 5 5 4 3/4"4 3/4"4'-0"INSERT1'-6"2'-6"2'-1 3/4"12'-7 1/2" RAIL 16'-0" RAIL 16'-0" RAIL 8'-0" RAIL 11'-6" 1'-3" 10'-6" 1'-3" 10'-7" 1'-3"10'-1" 1'-3" 3'-9" 12 3 4 CAR RAIL LINE LENGTH QUANTITY (8) - PER CAR LENGTH QUANTITY 8'-0"2 16'-0"4 12'-7 1/2"2 FLOOR TO FLOOR TRAVEL FLOOR TO FLOOR TRAVEL 3-4 11'-9" 2-3 11'-10" 1-2 11'-4" NET TRAVEL 34'-11" CAR RAIL LINE BRACKETS AND INSERT LOCATIONS - PER CAR LOCATION DESCRIPTION 15'-9"MAX. UNSUPPORTED RAIL BRACKET SPACING 11'-6"ABOVE TOP FLOOR 1'-3"BELOW 1-4 TYPICAL SURFACE MOUNTING DETAILS TYP 48" X 6" STEEL PLATE WELDED TO TUBESTEEL PROVIDED AND INSTALLEDBY G.C. MOUNT FLUSH WITH WALL. 48" X 6" STEEL PLATE WELDED TOSTEEL PROVIDED AND INSTALLED BY G.C. MOUNT FLUSH WITH WALL. AT ALL FLOOR LOCATIONS 16" BRACKET O.A.16" BRACKET O.A. 13 1/2" TYP 48" X 6" INSERT INSTALLED BY G.C. MOUNT FLUSH WITH WALL &GROUT SOLID ALL AROUND. 16" BRACKET O.A. 01/31/22 ENTRANCE LEFT SIDE VIEWLOBBY SIDEENTRANCE ELEVATION VIEW AT TYPICAL FLOOR Î ENTRANCE PLAN VIEW LOBBY SIDE A DD R1 R2ƔƔ THIS DRAWING AND ALL INFORMATION THEREON IS THE PROPRIETARY PROPERTY OF TK ELEVATOR AND MUST NOT BE MADE PUBLIC OR COPIED. THIS DRAWING IS LOANED SUBJECT TO RETURN ON DEMAND AND IS NOT TO BE USED DIRECTLY OR INDIRECTLY, IN ANY MANNER DETRIMENTAL TO THE INTEREST OF TK ELEVATOR. FOR: MELANGE FLATS ADDRESS: 920 VETERANS WAY CITY: CARMEL, IN 46032 6 OF 7 DATE A SHEETJOB NUMBER 12/10/2021 REVDRAWN RW 140-1739-02ATK Elevator FEATURES OF ENTRANCES DATA SILL MAXIMUM WHEEL LOADS 625 LBS KEYHOLES TO BE INCLUDED THIS FRAME HAS A WARNOCK HERSEY LABEL OF 2 HOURS DUST COVERS NOT INCLUDED FEATURES OF YOUR ENTRANCES FEATURES FINISH LOCATION DOOR OPEN STRUT BUMPERS:PROVIDED @1,2,3,4 KICKPLATES:__________@1,2,3,4 BINDERS:__________@1,2,3,4 SILL FINISH:ALUMINUM @1,2,3,4 TOTAL WEIGHT ELEVATOR 2 ELEVATOR CAB AND HALL DOORS 342 LBS NOTE "A": 8" MINIMUM STRUCTURAL SUPPORT FOR SILL INSTALLATION ENTRANCE CHART M721 ENTRANCE: CENTER OPENING AND 1 SPEED = FRAME OPENING + 1'-3" 2 SPEED = FRAME OPENING + 1'-5" ENTRANCE TYPE : M721 FOR ELEVATOR 2 1 SPEED LEFT HAND FRONT ENTRANCE FOR ELEVATOR 2 FOR ELEVATOR: 2 R2 228 R1 564 DOOR REACTION CASE 1 SEE NOTE "A"5'-0"C/L 4.10.5 28 CFR PART 36CLEAR OPENING HEIGHT (REFER TO DOOR SCHEDULE)CLEAR OPENING HEIGHT + 2" = OVERALL FRAME HEIGHT2"0 1/8"MINIMUM FLOOR TO FLOOR HEIGHT = "SEE ENTRANCE CHART"CLEAR OPENING WIDTH REFER TO DOOR SCHEDULE 2" FRAME 2" FRAME ACTUAL WALL SIZE 0 3/4" ELEVATOR: 2 FRONT ENTRANCE SCHEDULE FLOOR WALL TYPE WALL SIZE ACTUAL OA. FRAME "B" DIM. PLEASE REFERENCE THE RAIL STACK SHEET OF THIS PACKAGE FOR BUILDING LANDING MATRIX ENTRANCE DIMS. DIM "B" 4 7'-0" H X 3'-6" W TBD TBD TBD 3 7'-0" H X 3'-6" W TBD TBD TBD 2 7'-0" H X 3'-6" W TBD TBD TBD 1 7'-0" H X 3'-6" W TBD TBD TBD FRONT ENTRANCE HALL FIXTURES ITEM DESCRIPTION FLOOR A HALL STATION TYPICAL D HALL POSITION INDICATOR @1 HALL FIXTURES ARE FOR REPRESENTATION ONLY. FOR ACTUAL LOCATION OF POCKETS FOR HALL FIXTURES, CONTACT ELEVATOR CONTRACTOR. 6'-0" ROUGH OPENING WIDTH 8'-3"ROUGH OPENING HEIGHT NOTES: GENERAL CONTRACTOR RESPONSIBLE FOR HOISTWAY REINFORCING AT FLOOR SLAB BEFORE INSTALLATION OF ENTRANCE FRAMES. MINIMUM OF 4" HIGH X 8" WIDE REINFORCED CONCRETE, REINFORCED OF OPENING REQUIRED FOR ANCHORING SILL SUPPORT ASSEMBLY, REINFORCING TO BE LOCATED WITH RESPECT TO REACTION POINTS, REFERENCE INSTALLATION DRAWINGS ARE AVAILABLE UPON REQUEST. REACTIONS (LBS.) DUE TO LOADS ON DOOR PANELS, APPROX. HORIZONTAL LOADS AND LOCATION TO BUILDINGS SHOWN PER ASME A17.1 PART II, THE SPECIFIED LOADS ARE CONSIDERED IMPACTED.2" BELOWEACH FLOOR2'-1 1/2" 5'-3" 01/31/22 ENTRANCE SIDE VIEWLOBBY SIDEENTRANCE ELEVATION VIEW Î LOBBY SIDE ENTRANCE PLAN VIEW BUILDING POWER (SEE CONTROLLER KNOCK OUT DETAIL) FIRE ALARM PHONEŹŹŹ WALL FINISHŹDIM "C" DIM "D"Ź120V DEDICATED CAB LIGHT CIRCUIT (DIM "E") SHAFT LINER FILLER BY G.C.ƔA R1 R2ƔƔ THIS DRAWING AND ALL INFORMATION THEREON IS THE PROPRIETARY PROPERTY OF TK ELEVATOR AND MUST NOT BE MADE PUBLIC OR COPIED. THIS DRAWING IS LOANED SUBJECT TO RETURN ON DEMAND AND IS NOT TO BE USED DIRECTLY OR INDIRECTLY, IN ANY MANNER DETRIMENTAL TO THE INTEREST OF TK ELEVATOR. FOR: MELANGE FLATS ADDRESS: 920 VETERANS WAY CITY: CARMEL, IN 46032 7 OF 7 DATE A SHEETJOB NUMBER 12/10/2021 REVDRAWN RW 140-1739-02ATK Elevator FEATURES OF ENTRANCES DATA SILL MAXIMUM WHEEL LOADS 625 LBS KEYHOLES TO BE INCLUDED THIS FRAME HAS A WARNOCK HERSEY LABEL OF 2 HOURS DUST COVERS NOT INCLUDED FEATURES OF YOUR ENTRANCES FEATURES FINISH LOCATION DOOR OPEN STRUT BUMPERS:PROVIDED @1,2,3,4 KICKPLATES:__________@1,2,3,4 BINDERS:__________@1,2,3,4 SILL FINISH:ALUMINUM @1,2,3,4 TOTAL WEIGHT ELEVATOR 2 ELEVATOR CAB AND HALL DOORS 342 LBS NOTE "A": 8" MINIMUM STRUCTURAL SUPPORT FOR SILL INSTALLATION ENTRANCE CHART M721 ENTRANCE: CENTER OPENING AND 1 SPEED = FRAME OPENING + 1'-3" 2 SPEED = FRAME OPENING + 1'-5" ENTRANCE TYPE : M721 FOR ELEVATOR 2 1 SPEED LEFT HAND FRONT ENTRANCE FOR ELEVATOR 2 FOR ELEVATOR: 2 R2 228 R1 564 DOOR REACTION CASE 1 SEE NOTE "A"5'-0"C/L 4.10.5 28 CFR PART 36CLEAR OPENING HEIGHT (REFER TO DOOR SCHEDULE) CLEAR OPENING HEIGHT + 2" = OVERALL FRAME HEIGHT2"0 1/8"MINIMUM FLOOR TO FLOOR HEIGHT = "SEE ENTRANCE CHART"CLEAR OPENING WIDTH REFER TO DOOR SCHEDULE 2" FRAME 2" FRAME ELECTRICAL CONTRACTOR NOTE: 3 PHASE POWER, 120V 15 AMP CIRCUIT, FIRE ALARM AND PHONE TO BE ROUTED TO THE TOP OF THE CONTROLLER AT THE CONTROLLER LANDING LEVEL. LEAVE OFF ENTIRE WALL AT FLOOR FOR FRAME AND CONTROLLER INSTALLATION 2Ż5" 8 3/4" 9 3/4" 11 3/4"3"4 3/4"1'- 11"7 5/8"SILL 2" 1" LOBBY SIDE CONTROLLER KNOCKOUT DETAIL EXPOSED CMU 7 5/8"HOISTWAY CMU COLUMN WIDTH(WALL SIZE + 2.25")WALL SIZESILL ŻŻŻFRONT WALL CONDITION FOR EXPOSED MASONRY LOBBY SIDE CONSTRUCTION DETAIL VIEW FOR REPRESENTATION ONLY DIM "B" SEE ENTRANCE SCHEDULE 4 7'-0" H X 3'-6" W TBD TBD TBD 3 7'-0" H X 3'-6" W TBD TBD TBD 2 7'-0" H X 3'-6" W TBD TBD TBD 1 7'-0" H X 3'-6" W TBD TBD TBD ELEVATOR: 2 FRONT ENTRANCE SCHEDULE FLOOR WALL TYPE WALL SIZE ACTUAL OA. FRAME "B" DIM. PLEASE REFERENCE THE RAIL STACK SHEET OF THIS PACKAGE FOR BUILDING LANDING MATRIX ENTRANCE DIMS. ENTRANCE WALL DIMENSIONS DIM "C" MIN. WALL THK. REQUIRED DIM "D" WALL FACE TO FRAME FACE DIM "E" SHAFT LINER THICKNESS REFER TO NOTE B3/4" 8 1/2" NOTES: GENERAL CONTRACTOR RESPONSIBLE FOR HOISTWAY REINFORCING AT FLOOR SLAB BEFORE INSTALLATION OF ENTRANCE FRAMES. MINIMUM OF 4" HIGH X 8" WIDE REINFORCED CONCRETE, REINFORCED OF OPENING REQUIRED FOR ANCHORING SILL SUPPORT ASSEMBLY, REINFORCING TO BE LOCATED WITH RESPECT TO REACTION POINTS, REFERENCE INSTALLATION DRAWINGS ARE AVAILABLE UPON REQUEST. REACTIONS (LBS.) DUE TO LOADS ON DOOR PANELS, APPROX. HORIZONTAL LOADS AND LOCATION TO BUILDINGS SHOWN PER ASME A17.1 PART II, THE SPECIFIED LOADS ARE CONSIDERED IMPACTED. 2'-1 1/2" 5'-3"2" BELOWEACH FLOORNOTE B: SHAFT LINER THICKNESS AND TYPE TO BE DETERMINED AND ADVISED BY G.C./ ARCHITECT TO ENSURE LOCAL FIRE RATING IS ACHIEVED. 01/31/22