Loading...
HomeMy WebLinkAboutP301.1 - NORTH 1ST LEVEL GARAGES WATER GASGAS METER BANK FOR LOW PRESSURE SYSTEM REGULATORS AT THIS LOCATION HB-1 HB-1 HB-1 EWH-2 1/2"ø HW 1/2"ø CW3/4"ø CW 3/4"ø CW3/4"ø CW1"ø CW1/2"ø CW1/2"ø CW 1/2"ø CW3/4"ø CW1"ø G1"ø G1"ø G1/2"ø G1"ø G 3/4"ø G 1"ø G1 1/4"ø G1"ø G1 1/4"ø G1 1/4"ø G(8) 1 1/4" Gas lines (1) 3/4" Gas line UP 1/2"ø HW3/4"ø HW 1"ø GAS UP 1 1/2"ø CW 1"ø GAS UP SHUT OFF FOR HOSE BIBS / ACCESS PANEL IN CEILING REQUIRED SHUT OFF FOR HOSE BIBS / ACCESS PANEL IN CEILING REQUIRED MOORE ENGINEERING SERVICES, INC. 6340 LaPas Trail Indianapolis, IN 46268 Phone (317) 291-1052 FAX (317) 298-2729R I G EEIS PE60860351 No.REENIGNELANOISSEFORPDOUGLAS.R MOO RET R NNDIA A STATE OF DEDATE SCOPE DOCUMENT THESE DOCUMENTS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT, DIMENSIONS OF THE BUILDING, MAJOR ARCHITECTURAL ELEMENTS AND TYPE OF STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS. THE DRAWINGS DO NOT CECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULLPERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THEBASIS OF THE GENERAL SCOPE INDIACATED OR DESCRIBED, TRADE CONTRACTOR SHALLFURNISH ALL ITEMS REQUIRED FOR PROPER EXECUTION AND COMPLETION OF THE WORK SHEET ADDENDUM 1 REVISIONSMÉLANGE FLATSA NEW MULTIFAMILY RESIDENTIALBLOCK DEVELOPMENTFIREHOUSE DEVELOPMENTCARMEL, INDIANA 4603211-01-2021 P301-1 NORTH -1ST LEVEL GARAGES -WATER & GAS 1/4" = 1'-0" 1 Level 01 - Water & Gas - North 01/31/22