Loading...
HomeMy WebLinkAboutS420 - ROOF FRAMING DETAILS5/8" ROOF SHEATHING, REFER TO DIAPHRAGM SCHEDULE FOR NAILING PATTERN SIMPSON LSTA24 STRAP TIE AT EACH 2x4 METAL PARAPET CAP, SEE ARCH. PRE-FABRICATED WOOD ROOF TRUSS, SEE PLAN 2x WOOD STUD WALL BEARING WALL, SEE SCHEDULE EXTERIOR WALL SHEATHING, REFER TO SHEAR WALL SCHEDULE FOR NAILING PATTERN ROOFING AND INSULATION, SEE ARCH. CONT. (2) -2x WOOD TOP PLATE (SIZE TO MATCH STUD WALL THICKNESS) (2) -2x4 WOOD BLOCKING BETWEEN EACH TRUSS (FASTEN TRUSS TOP CHORD TO BLOCKING WITH (4) -10d NAILS REFER TO DIAPHRAGM SCHEDULE FOR NAILING PATTERN 2x4 LAID FLAT AT 48" O.C. (FASTEN TO TRUSS CHORD WITH (3) -10d NAILS), EXTEND OVER FIRST THREE TRUSSES CONT. 2x4 BLOCKING T.O. PARAPET SEE ARCH ROOF TRUSS BEARING SEE ARCH CEILING, SEE ARCH. 5/8" ROOF SHEATHING, REFER TO DIAPHRAGM SCHEDULE FOR NAILING PATTERN METAL PARAPET CAP, SEE ARCH. PRE-FABRICATED WOOD ROOF TRUSS, SEE PLAN 2x WOOD STUD WALL BEARING WALL, SEE SCHEDULE EXTERIOR WALL SHEATHING, REFER TO SHEAR WALL SCHEDULE FOR NAILING PATTERN ROOFING AND INSULATION, SEE ARCH. CONT. (2) -2x WOOD TOP PLATE (SIZE TO MATCH STUD WALL THICKNESS) 2x6 WOOD BLOCKING BETWEEN EACH TRUSS (FASTEN TRUSS TOP CHORD TO BLOCKING WITH (4) - 10d NAILS DOUBLE 2x6 BLOCKING BETWEEN EACH TRUSS (FASTEN TO ROOF SHEATHING WITH (4) -10d NAILS) T.O. PARAPET SEE ARCH ROOF TRUSS BEARING SEE ARCH CEILING, SEE ARCH. SIMPSON H8 CLIP EACH END, EACH TRUSS PARAPET INTEGRAL WITH TRUSS 5/8" ROOF SHEATHING, REFER TO DIAPHRAGM SCHEDULE FOR NAILING PATTERN TOP CHORD BEARING PRE- FABRICATED WOOD ROOF TRUSS, SEE PLAN ROOFING AND INSULATION, SEE ARCH. PROVIDE (3) COURSE MASONRY BOND BEAM AT TRUSS ATTACHMENT ELEVATION AND GROUT ALL CELLS ABOVE BOND BEAM SOLID UPPER ROOF SEE ARCH SIMPSON H8 CLIP EACH END, EACH TRUSS 2x WOOD STUD BEARING WALL, SEE SCHEDULE MASONRY ELEVATOR SHAFT WALL, SEE S500 FOR DETAILS UPPER ROOF FRAMING, SEE PLAN 5/8" ROOF SHEATHING, REFER TO DIAPHRAGM SCHEDULE FOR NAILING PATTERN TOP CHORD BEARING PRE- FABRICATED WOOD ROOF TRUSS, SEE PLAN ROOFING AND INSULATION, SEE ARCH. SIMPSON H8 CLIP EACH END, EACH TRUSS NON-BEARING FURRING WALLS, SEE ARCH. 2x8 ELEVATOR SHAFT LID FRAMING, ATTACH WITH SIMPSON LUS28 FACE MOUNT MASONRY HANGERS 3/4" PLYWOOD SHEATHING (2) 2x12 LEDGER FOR TRUSS BEARING, ATTACH TO BOND BEAM WITH (2) SIMPSON TITEN HD 50800 MASONRY SCREWS STAGGERED AT 8" O.C. (3) 2x10 BLOCKING BETWEEN ROOF TRUSSES FOR STUD WALL SUPPORT NON-BEARING EXTERIOR STUD WALL, SEE ARCH. 2x FASCIA BOARD, SEE ARCH. 3/4" PLYWOOD ROOF SHEATHING AND ROOFING, SEE ARCH. WOOD 2x SILL PLATE, ATTACH TO TOP OF MASONRY WITH SIMPSON TITEN HD 50400 SCREWS AT 8" O.C. SIMPSON H2.5A CLIP EACH JOIST 5/8" ROOF SHEATHING, REFER TO DIAPHRAGM SCHEDULE FOR NAILING PATTERN TOP CHORD BEARING PRE- FABRICATED WOOD ROOF TRUSS, SEE PLAN ROOFING AND INSULATION, SEE ARCH. PROVIDE 3-PLY x 18" LVL BLOCKING FOR LEDGER ATTACHMENT UPPER ROOF SEE ARCH SIMPSON H2.5A CLIP EACH END, EACH TRUSS UPPER ROOF FRAMING, SEE PLAN 5/8" ROOF SHEATHING, REFER TO DIAPHRAGM SCHEDULE FOR NAILING PATTERN TOP CHORD BEARING PRE- FABRICATED WOOD ROOF TRUSS, SEE PLAN ROOFING AND INSULATION, SEE ARCH. SIMPSON H2.5A CLIP EACH END, EACH TRUSS (2) 2x12 LEDGER FOR TRUSS BEARING, ATTACH TO LVL BLOCKING WITH (3) SIMPSON SDWS 22800DB TIMBER SCREWS STAGGERED AT 8" O.C. 2x WOOD STUD SHAFT WALL, SEE SCHEDULE 2x FASCIA BOARD, SEE ARCH. 3/4" PLYWOOD ROOF SHEATHING AND ROOFING, SEE ARCH. WOOD 2x SILL PLATE, ATTACH TO DOUBLE TOP PLATE WITH (2) 16d NAILS AT 16" O.C. SIMPSON H2.5A CLIP EACH JOIST INEGSS LOINA E NPROF REEN o. GRE S DRETEI STATE OF NA ADNII 11100391 NNAMFFOHHPESOJ SHEET NUMBER: PROJECT NUMBER: DRAWN BY:PROJECT TITLE:This is an original design, created by KJG Architecture, Inc. The concepts, ideas, plans and details are the sole property of KJG Architecture, Inc. None of the aforementioned shall be used by or disclosed to any person, firm or organization for any purpose without the prior written permission of KJG Architecture, Inc. NO. DESCRIPTION:DATE ISSUED: DRAWING TITLE: PROFESSIONAL SEAL: PROJECT DATE: DISCLAIMER: KJG ENGINEERING 527 Sagamore Pkwy W., Suite 101 West Lafayette, Indiana 47906 Ph: 765.497.4598 Fx: 765.497.4599 www.kjgengineering.com 08/16/2021MÉLANGE FLATSBUILDING 12VETERANS WAY & MONON GREEN BOULEVARDCARMEL, INDIANA 4603208/16/2021 S420 ROOF FRAMING DETAILS E2020.174 KBM 1" = 1'-0"S420 2 ROOF TRUSS BEARING DETAIL 1" = 1'-0"S420 1 ROOF TRUSS BEARING DETAIL 3/4" = 1'-0"S420 3 ROOF TRUSS BEARING DETAIL 3/4" = 1'-0" S420 4 ROOF TRUSS BEARING DETAIL 1 CONSTRUCTION SET 08/16/21 2 ADDENDUM 1 11/01/21 01/31/22