HomeMy WebLinkAboutA001.0 - ARCHITECTURAL SITE PLANMONON TRAILVETERANS WAYMONON GREEN BLVD.SOUTH RANGELINE RD.BUILDING OUTLINE
SURROUNDING BUILDINGS -TYP.
MELANGE
FLAT BUILDING
DATE
155 EAST MARKET STREETSECOND FLOOR, SUITE 200
INDIANAPOLIS, INDIANA 46204
T 317.721.2724
ROTTMANNCOLLIER.COM
SCOPE DOCUMENT
THESE DOCUMENTS INDICATE THE GENERAL
SCOPE OF THE PROJECT IN TERMS OFARCHITECTURAL DESIGN CONCEPT, DIMENSIONS
OF THE BUILDING, MAJOR ARCHITECTURALELEMENTS AND TYPE OF STRUCTURAL,
MECHANICAL AND ELECTRICAL SYSTEMS. THE
DRAWINGS DO NOT CECESSARILY INDICATE OR
DESCRIBE ALL WORK REQUIRED FOR FULLPERFORMANCE AND COMPLETION OF THE
REQUIREMENTS OF THE CONTRACT. ON THE
BASIS OF THE GENERAL SCOPE INDIACATED OR
DESCRIBED, TRADE CONTRACTOR SHALL
FURNISH ALL ITEMS REQUIRED FOR PROPER
EXECUTION AND COMPLETION OF THE WORK
SHEET
PROJECT NO.
REVISIONSMÉLANGE FLATSA NEW MULTIFAMILY RESIDENTIALBLOCK DEVELOPMENTFIREHOUSE DEVELOPMENTCARMEL, INDIANA 4603203-05-2021 OWNER REVIEW SET
08-16-2021 CONSTRUCTION SET
11-01-2021 ADDENDUM 1
AS-1
ARCHITECTURAL SITE
PLAN
03-05-2021
19112
1/32" = 1'-0"1 ARCHITECTURAL SITE PLAN
NOTE: SEE CIVIL ENGINEERING AND LANDSCAPE DRAWINGS INCLUDED
UNDER SEPARATE COVER SHEET FOR ALL SITE DIMENSIONS AND
DETAILS
1ST LOBBY/EGRESS/ AUX. - 2350S.F.
1ST FLOOR GARAGES - 5663 S.F.
1ST FLOOR TOTAL - 8013 S.F.
2ND FLOOR UNIT 1 - 1542 S.F.
2ND FLOOR UNIT 2 - 1512 S.F.
2ND FLOOR UNIT 7 - 1622 S.F.
2ND FLOOR UNIT 8 - 1628 S.F.
2ND FLOOR COMMON SPACE - 1442 S.F.
2ND FLOOR TOTAL - 7746 S.F
3RD FLOOR UNIT 3 - 1821 S.F.
3RD FLOOR UNIT 4 - 1518 S.F.
3RD FLOOR UNIT 9 - 1899 S.F.
3RD FLOOR UNIT 10 - 1632 S.F.
3RD COMMON SPACE - 1423 S.F.
3RD FLOOR TOTAL - 8293 S.F.
4TH FLOOR UNIT 5 - 1821 S.F.
4TH FLOOR UNIT 6 - 1518 S.F.
4TH FLOOR UNIT 11 - 1899 S.F.
4TH FLOOR UNIT 12 - 1632 S.F.
4TH COMMON SPACE - 1423 S.F.
4TH FLOOR TOTAL - 8293 S.F.
TOTAL BUILDING - 32,345 S.F.
SQUARE FOOTAGE CALCULATIONS
N
01/31/22