Loading...
HomeMy WebLinkAboutA001.0 - ARCHITECTURAL SITE PLANMONON TRAILVETERANS WAYMONON GREEN BLVD.SOUTH RANGELINE RD.BUILDING OUTLINE SURROUNDING BUILDINGS -TYP. MELANGE FLAT BUILDING DATE 155 EAST MARKET STREETSECOND FLOOR, SUITE 200 INDIANAPOLIS, INDIANA 46204 T 317.721.2724 ROTTMANNCOLLIER.COM SCOPE DOCUMENT THESE DOCUMENTS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OFARCHITECTURAL DESIGN CONCEPT, DIMENSIONS OF THE BUILDING, MAJOR ARCHITECTURALELEMENTS AND TYPE OF STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS. THE DRAWINGS DO NOT CECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULLPERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDIACATED OR DESCRIBED, TRADE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR PROPER EXECUTION AND COMPLETION OF THE WORK SHEET PROJECT NO. REVISIONSMÉLANGE FLATSA NEW MULTIFAMILY RESIDENTIALBLOCK DEVELOPMENTFIREHOUSE DEVELOPMENTCARMEL, INDIANA 4603203-05-2021 OWNER REVIEW SET 08-16-2021 CONSTRUCTION SET 11-01-2021 ADDENDUM 1 AS-1 ARCHITECTURAL SITE PLAN 03-05-2021 19112 1/32" = 1'-0"1 ARCHITECTURAL SITE PLAN NOTE: SEE CIVIL ENGINEERING AND LANDSCAPE DRAWINGS INCLUDED UNDER SEPARATE COVER SHEET FOR ALL SITE DIMENSIONS AND DETAILS 1ST LOBBY/EGRESS/ AUX. - 2350S.F. 1ST FLOOR GARAGES - 5663 S.F. 1ST FLOOR TOTAL - 8013 S.F. 2ND FLOOR UNIT 1 - 1542 S.F. 2ND FLOOR UNIT 2 - 1512 S.F. 2ND FLOOR UNIT 7 - 1622 S.F. 2ND FLOOR UNIT 8 - 1628 S.F. 2ND FLOOR COMMON SPACE - 1442 S.F. 2ND FLOOR TOTAL - 7746 S.F 3RD FLOOR UNIT 3 - 1821 S.F. 3RD FLOOR UNIT 4 - 1518 S.F. 3RD FLOOR UNIT 9 - 1899 S.F. 3RD FLOOR UNIT 10 - 1632 S.F. 3RD COMMON SPACE - 1423 S.F. 3RD FLOOR TOTAL - 8293 S.F. 4TH FLOOR UNIT 5 - 1821 S.F. 4TH FLOOR UNIT 6 - 1518 S.F. 4TH FLOOR UNIT 11 - 1899 S.F. 4TH FLOOR UNIT 12 - 1632 S.F. 4TH COMMON SPACE - 1423 S.F. 4TH FLOOR TOTAL - 8293 S.F. TOTAL BUILDING - 32,345 S.F. SQUARE FOOTAGE CALCULATIONS N 01/31/22