HomeMy WebLinkAboutA010.0 - EXTERIOR ELEVATION1ST LEVEL
+99' -5"
2ND LEVEL FLATS
+110' -9 3/8"
4TH LEVEL FLATS
+134' -4 1/8"
3RD LEVEL FLATS
+122' -6 3/4"
T.O. PARAPET
+150' -0"
ROOF BEARING
+157' -0"
TRUSS BEARING
+144' -5 1/4"
1ST LEVEL BEARING
+109' -1 1/8"
T.O. SLAB AT GARAGE DOOR
+99' -2"
4TH LEVEL BEARING
+132' -7 7/8"
3RD LEVEL BEARING
+120' -10 1/2"
T.O. WINDOW -4TH
+142' -10 1/8"
T.O. WINDOW -3RD
+131' -0 3/4"
T.O. WINDOW -2ND
+119' -3 3/8"
T.O. WINDOW -1ST
+107' -7"
T.O. BREEZEWAY PARAPET
+153' -4"
T.0. TPO
+158' -2"
TRUSS BASE HEIGHT
+147' -5 1/4"
TRUSS PEAK HEIGHT
+148' -8"
1 TYP 4 TYP
2 TYP 2 TYP
3 3
4 TYP
5 TYP5TYP
6
11 TYP11 TYP
1 | A 1 | B 1 | A 1 | B 1 | J 1 | B 1 | A 1 | B 1 | A
2323
6 13 TYP15
24
7 7
19
TYP
16 TYP 14 TYP
36 36
27 27
28
29
10' - 4" TYP.30 TYP 30 TYP
31 31 31 31 31 31 31 31
32 TYP 32 TYP
31
25
25
152"*
*
*
*
*
*
24
4
TYP
25
TYP
37
TYP
33
15
3325
37
TYP
1 TYP
33
TYP 5 | C5 | C5
TYP
38 4 TYP
1ST LEVEL
+99' -5"
2ND LEVEL FLATS
+110' -9 3/8"
4TH LEVEL FLATS
+134' -4 1/8"
3RD LEVEL FLATS
+122' -6 3/4"
T.O. PARAPET
+150' -0"
ROOF BEARING
+157' -0"
TRUSS BEARING
+144' -5 1/4"
1ST LEVEL BEARING
+109' -1 1/8"
T.O. SLAB AT GARAGE DOOR
+99' -2"
4TH LEVEL BEARING
+132' -7 7/8"
3RD LEVEL BEARING
+120' -10 1/2"
T.O. WINDOW -4TH
+142' -10 1/8"
T.O. WINDOW -3RD
+131' -0 3/4"
T.O. WINDOW -2ND
+119' -3 3/8"
T.O. WINDOW -1ST
+107' -7"
T.O. BREEZEWAY PARAPET
+153' -4"
T.0. TPO
+158' -2"
TRUSS BASE HEIGHT
+147' -5 1/4"
TRUSS PEAK HEIGHT
+148' -8"
1 TYP 4 TYP
5 TYP
6
24
2 11 TYP7 36
30
TYP
31 31
32 TYP
1 | B 1 | A 1 | B
4 TYP 5 | C23
37
25
33
15 25 14
11
13 4TYP
10 TYP
2 TYP
22 TYP
23
21
9 TYP
12
8
ELEVATION GEN. NOTES
1. DO NOT SCALE DRAWINGS
2. REFER TO FLOOR PLANS FOR ALL WALL ASSEMBLY DESIGNATIONS AND
LOCATIONS OF TYPICAL WALL SECTIONS
3. MEP PENETRATIONS ARE NOT SHOWN. SEE MEP DRAWINGS FOR ACTUAL
LOCATIONS AND TYPES
4. ALL MASONRY COURSING SHALL BE RUNNING BONC UNLESS NOTED OTHERWISE
5. SEE KEYNOTES FOR MASONRY TYPES
6. ALL COLORS TO BE SELECTED AND APPROVED BY ARCHITECT FROM
MANUFACTURER'S STANDARDS
7. ALL SIDING AND TRIM SHALL BE SMOOTH, NO TEXTURED SIDING OR TRIM ALLOWED.
8. ALL NON-PREFINISHED EXTERIOR ITEMS SHALL BE PAINTED WITH ONE COAT OF
TINTED PRIMER AND ONE COAT OF FINISH PAINT.
9. INSTALL PREFINISHED METAL DRIP EDGE ABOVE ALL HORIZONTAL TRIM BOARDS,
INCLUDING AT HEADS OF DOORS AND WINDOWS. DO NOT CAULK ABOVE.
10. COORDINATE DOWNSPOUT LOCATIONS WITH ROOF PLAN LOCATIONS, BRICK
TRANSITIONS, AND LIGHTING LOCATIONS.
11. CAULK ALL JOINTS AND FINISH TO MATCH ADJACENT MATERIALS.
INDICATES SAFETY GLAZING*
MATERIAL & COLOR
LEGEND
A MODULAR BRICK -MERIDIAN BRICK "MEADOWBROOK"
B MODULAR BRICK -MERIDIAN BRICK "DOMINO"
C UTILITY BRICK -SOUIX CITY "SLATE VELOUR"
D PAINT -MATCH LIMESTONE / CAST STONE
E PAINT -MATCH BENJAMIN MOORE PAINT HC-166 "KENDALL CHARCOAL"
F CAST STONE "LIMESTONE" COLOR
G ALUMINUM STOREFRONT SYSTEM = "BLACK" COLOR
H VINYL WINDOWS -MATCH JELDWEN "BLACK"
J MODULAR BRICK -SOUIX CITY "SLATE VELOUR"
CAST-STONE PROFILES
M-2
BNDCL-85
SILLCH-4S
M-1
1ST LEVEL
+99' -5"
2ND LEVEL FLATS
+110' -9 3/8"
1ST LEVEL BEARING
+109' -1 1/8"
3RD LEVEL BEARING
+120' -10 1/2"
T.O. WINDOW -2ND
+119' -3 3/8"
T.O. WINDOW -1ST
+107' -7"
DATE
155 EAST MARKET STREETSECOND FLOOR, SUITE 200
INDIANAPOLIS, INDIANA 46204
T 317.721.2724
ROTTMANNCOLLIER.COM
SCOPE DOCUMENT
THESE DOCUMENTS INDICATE THE GENERAL
SCOPE OF THE PROJECT IN TERMS OFARCHITECTURAL DESIGN CONCEPT, DIMENSIONS
OF THE BUILDING, MAJOR ARCHITECTURALELEMENTS AND TYPE OF STRUCTURAL,
MECHANICAL AND ELECTRICAL SYSTEMS. THE
DRAWINGS DO NOT CECESSARILY INDICATE OR
DESCRIBE ALL WORK REQUIRED FOR FULLPERFORMANCE AND COMPLETION OF THE
REQUIREMENTS OF THE CONTRACT. ON THE
BASIS OF THE GENERAL SCOPE INDIACATED OR
DESCRIBED, TRADE CONTRACTOR SHALL
FURNISH ALL ITEMS REQUIRED FOR PROPER
EXECUTION AND COMPLETION OF THE WORK
SHEET
PROJECT NO.
REVISIONSMÉLANGE FLATSA NEW MULTIFAMILY RESIDENTIALBLOCK DEVELOPMENTFIREHOUSE DEVELOPMENTCARMEL, INDIANA 4603203-05-2021 OWNER REVIEW SET
08-16-2021 CONSTRUCTION SET
11-01-2021 ADDENDUM 1
A3-1
EXTERIOR ELEVATIONS
03-05-2021
19112
1/8" = 1'-0"1 WEST ELEVATION
1/8" = 1'-0"2 SOUTH BUILDING -SOUTH ELEVATION
ELEVATION KEYNOTES
1 MODULAR SIZE BRICK. RUNNING BOND.
2 6.25" FIBER CEMENT COMPOSITE LAP SIDING, SMOOTH FINISH, COLOR "E"
3 CONC. PAD AT EXTERIOR DOORS - MAXIMUM SLOPE 1:50 PER ACCESSIBLITY CODE
REQUIREMENTS
4 BRICK SOLDIER COURSE BAND, HEAD, OR SILL
5 UTILITY BRICK VENEER, COLOR "C"
6 HARDIETRIM CORNICE, SMOOTH TEXTURE, COLOR "E" - SEE SECTION DETAILS ON A4-4
AND A4-5
7 9.25" X 4/4 FIBER CEMENT TRIM, SMOOTH TEXTURE, COLOR "E"
8 7.25" X 4/4 FIBER CEMENT TRIM, SMOOTH TEXTURE, COLOR "E", AT BASE OF BAY
9 5.5" X 4/4 FIBER CEMENT TRIM, SMOOTH TEXTURE, COLOR "E", AT CORNERS
10 3.5" X 4/4 FIBER CEMENT TRIM, SMOOTH TEXTURE, COLOR "E", AROUND WINDOWS
11 3.5" X 4/4 FIBER CEMENT TRIM, SMOOTH TEXTURE, COLOR "E", AND AT ALL CORNERS /
EDGES
12 HARDIEPANEL, SMOOTH TEXTURE, COLOR "E"
13 HARDIEPANEL, SMOOTH TEXTURE, COLOR "D"
14 HARDIEBATTEN TRIM ACCENT, SMOOTH TEXTURE, COLOR "D"
15 HARDIETRIM CORNICE, SMOOTH TEXTURE, COLOR "D" - SEE SECTION DETAILS ON A4-4
AND A4-5
16 9.25" X 4/4 FIBER CEMENT TRIM, SMOOTH TEXTURE, COLOR "D"
17 7.25" X 4/4 FIBER CEMENT TRIM, SMOOTH TEXTURE, COLOR "D"
18 5.5" X 4/4 HARDIE TRIM, SMOOTH TEXTURE, COLOR "D"
19 3.5" X 4/4 HARDIE TRIM, SMOOTH TEXTURE, COLOR "D"
20 CAST STONE ENTRYWAY
21 PREFINISHED METAL FLASHING OVER 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM
22 HARDIE BOARD TRIM BAND ASSEMBLY, SEE SECTION DETAILS, COLOR "E'"
23 CAST STONE BAND M-2, COLOR "F"
24 CAST STONE BAND M-1, COLOR "F"
25 PREFINISHED METAL COPING - MATCH ADJACENT TRIM COLOR
26 STOREFRONT ENTRY SYSTEM, COLOR "G"
27 EGRESS DOOR - SEE DOOR SCHEDULES FOR DETAILS
28 HANGING LANTERN LIGHT WITH SWAY CHAINS - SEE ELECTRICAL PLANS FOR LOCATIONS
29 COACH LIGHT TO MATCH HANGING LANTERN LIGHTS
30 DEVELOPMENT STANDARD COACH LIGHTS
31 OVERHEAD DOOR. SEE DOOR SCHEDULE. PAINT COLOR "E"
32 BRICK ROWLOCK SILL
33 TPO ROOF - SEE SECTION DETAIL
34 ROOF ACCESS DOOR - SEE DOOR SCHEDULE. PAINT COLOR "E"
35 CAST STONE BRICK IN UTILITY BRICK SIZR, COLOR "F"
36 PREFINISHED METAL FLASHING WITH DRIP EDGE.
37 PREFINSHED ALUMINUM SCUPPER AND DOWNSPOUT, SEE ROOF PLAN FOR MORE
INFORMATION
38 THREE (3) SOLDIER COURSES, EACH OUTSET 3/4".
39 CUT CAST STONE BAND TO ANGLE OF BAY WALL.
40 36" TALL PREFINISHED METAL GUARDRAIL AS SELECTED BY OWNER.
1/8" = 1'-0" 3 SOUTH BUILDING -NORTH ELEVATION
Please make this chandelier more grand. This should look like the chandelier's submitted and approved in
ADLS and CRC Architectural Review. All chandeliers in the breezeway should match. Thank you.
Please make this chandelier more grand. This should look
like the chandelier's submitted and approved in ADLS and
CRC Architectural Review. All chandeliers in the
breezeway should match. Thank you.
Please make this
chandelier more grand.
This should look like the
chandeliers submitted and
approved in ADLS and
CRC Architectural Review.
All chandeliers in the
breezeway should match.
Thank you.
01/31/22