Loading...
HomeMy WebLinkAboutChange_Order_1;_White_Construction,_LLC;_($0);_16-SW-85_Westfield_Boulevard_Over_Carmel_Creek_Brid DocuSign Envelope ID:AC19022C-A771-43C1-A176-659B1BBA1584 APPROt111), , City of Carmel Project 16-SW-85 Westfield Boulevard over Carmel Creek Bridge Replacement CHANGE ORDER#1 Change order to adjust substantial and final completion dates due to adjacent project delay and utility delay. Contract Price prior to this Change Order $1,020,000,00 Contract Price will not be changed by this Change Order $0.00 New Contract Price including this Change Order $1,020,000.00 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $1,020,000,00 N/A N/A Cal $0,00 $0.00 0.0% DocuSign Envelope ID:AC19022C-A771-43C1-A176-659B1BBA1584 CITY OF CARMEL TO: Jeremy Kashman CONTRACT CHANGE ORDER NO,: 1 City Engineer DATE: December 7,2021 City of Carmel Indiana PROJECT NAME: Westfield Blvd over Carmel Creek One Civic Square CITY REQ.NO.: Carmel,IN 46032 CITY PO NO.: 16-SW-85 CITY PO DATE: I. You are directed to make the following changes in this Contract: Substantial and Final Completion Dates for contract. SCHEDULED ADJUSTMENT ITEM AMOUNT (4-)OR -)DAYS IL The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order:R.F.P.: N/A W.D.C.NO.: N/A The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order 1,020,000.00 Contract Price will not be changed by this Change Order New Contract Price including this Change Order 1,020,000.00 Contract Time prior to this Change Order Days 8/6/2021 Substantial Completion Date Contract Time prior to this Change Order 8/27/2021 Final Completion Date Net increased/decreased resulting from this Change Order 15 Days Current Contract Time including this Change Order Days 8/21/2021 Substantial Completion Date Current Contract Time including this Change Order 9/11/2021 Final Completion Date This Change Order is for full and final settlement of all direct, indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Accepted Approved Recommended American Structurermint,Inc. White Construction,LW briautri, ENGINEER CONTRACTOR Mayor 9025 River Road,Suite 200 3900 Bust White Ave. iitAk. tuidd, Address Address ;:infBurke,Member Indianapolis,IN 46240 Clinton,IN,47842 (5/Ar1142110iii-viiA CilyiSinteaip City/SimeiZip n,Member Jerei4 Kas man,PE,City Engineer By: Pav-edial€2. By: A_ELESI; Phone: 317-281-9663 P 11 0 nOrt—) 2,1 it.-1 5110 ‘&10AttilittIng,Clerk Date: 12-07-2O21 Date: 11/14/7-41-A Date: 2/2/2022 DocuSign Envelope ID:AC19022C-A771-43C1-A176-659B1BBA1584 1 ‘Ri c:' ..; '" I 1.--- 0 0) 0) OI) A ..8 0 _ .s4 .0 ,, u 8 ›, cd 0 u -0 o -0 2 ›. ✓ 0 --6' -0 0 m g -0 0 0 ,. '11 4 0.. a) d) ra •V _ o 6' cdo (1--, a.) —, 4,11 LL9' 0 v O +.. 0 4 t 0 0 7:4 4) ..zi z u u La. _,0 0 '' 0 .H .+_, u C) -c-d G Ti 0• ••-• •0 .5 V cu = r, R .., I 0 cNI LI ... 1,-. • o ,s 0 C.) bo .5 cri I 174 4.J 4 ..._ V, -6.' •,- 0 0-, E o 4.) 0 •..., a 43 g, cs " ,..,, ,.., .s — .-. , 4—)...., (...) 0 0 0 0 b. ;-..1 _ (1.) la' ti •c> :) .4 -t Q 8 0 '0 -c, 1) • °DP". c; ci o '-' ".cl (") 6 6 ' 8 go c, 0 .g a) o c4 .2 8 u 2 v ,,-. w, ai -0 • -0 ,•-.▪ a; :_, U --- a-, — U U C.> •-c) V) V) V) v) 733 XI i ..p 0 '71 0 CI •W It 0 .4 0 LO 'Fn.. t 0 0 0 PI '1',Z9 6 0 E '14 0 0 O t a4., 5 -,1 v .--, I. 4 .22 .0 4.—, Cri 1.4 C.? to 0 'g C) 0, (..) 0 0 0•C .0 0-1) 0 U 5 g •ci, ' '18. 0 u, 4 i Q 6 .0 CI p el, u •cl a c'd 0 = ol , e m ,r) U r-4 A 6 •a 1 0 , DocuSign Envelope ID:AC19022C-A771-43C1-A176-659B1BBA1584 c' 0 N bl q c. N • (1.) t(,(43 c9) ' II N IN ' (x> C, / U o • • c "Tg A . t. ••.ci ttt E I F"4 g 5 a 44) ty, , 0 0 c-) U t•-,4 0