City of Carmel Project 16-SW-85
Westfield Boulevard over Carmel Creek
Bridge Replacement
CHANGE ORDER#1
Change order to adjust substantial and final completion dates due to adjacent project delay and utility
delay.
Contract Price prior to this Change Order $1,020,000,00
Contract Price will not be changed by this Change Order $0.00
New Contract Price including this Change Order $1,020,000.00
Amount Adjusted Contract Cumulative%Change
Price from Original Contract
Original Contract $1,020,000,00 N/A N/A
Cal $0,00 $0.00 0.0%
DocuSign Envelope ID:AC19022C-A771-43C1-A176-659B1BBA1584
CITY OF CARMEL
TO: Jeremy Kashman CONTRACT CHANGE ORDER NO,: 1
City Engineer DATE: December 7,2021
City of Carmel Indiana PROJECT NAME: Westfield Blvd over Carmel Creek
One Civic Square CITY REQ.NO.:
Carmel,IN 46032 CITY PO NO.: 16-SW-85
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
Substantial and Final Completion Dates for contract.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (4-)OR -)DAYS
IL The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order:R.F.P.: N/A W.D.C.NO.: N/A
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order 1,020,000.00
Contract Price will not be changed by this Change Order
New Contract Price including this Change Order 1,020,000.00
Contract Time prior to this Change Order Days 8/6/2021 Substantial Completion Date
Contract Time prior to this Change Order 8/27/2021 Final Completion Date
Net increased/decreased resulting from this Change Order 15 Days
Current Contract Time including this Change Order Days 8/21/2021 Substantial Completion Date
Current Contract Time including this Change Order 9/11/2021 Final Completion Date
This Change Order is for full and final settlement of all direct, indirect,impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Accepted Approved
Recommended
American Structurermint,Inc. White Construction,LW briautri,
ENGINEER CONTRACTOR Mayor
9025 River Road,Suite 200 3900 Bust White Ave. iitAk. tuidd,
Address Address ;:infBurke,Member
Indianapolis,IN 46240 Clinton,IN,47842 (5/Ar1142110iii-viiA
CilyiSinteaip City/SimeiZip n,Member
Jerei4 Kas man,PE,City Engineer
By: Pav-edial€2. By:
A_ELESI;
Phone: 317-281-9663 P 11 0 nOrt—) 2,1 it.-1 5110
‘&10AttilittIng,Clerk
Date: 12-07-2O21 Date: 11/14/7-41-A Date: 2/2/2022
DocuSign Envelope ID:AC19022C-A771-43C1-A176-659B1BBA1584
1 ‘Ri c:' ..;
'"
I 1.---
0
0) 0)
OI)
A ..8
0
_
.s4 .0
,,
u
8
›,
cd
0
u -0
o
-0
2
›.
✓ 0
--6'
-0
0
m g
-0 0
0 ,.
'11 4 0..
a)
d) ra •V
_ o
6' cdo (1--,
a.) —, 4,11
LL9' 0
v
O +..
0
4 t 0
0 7:4
4)
..zi z
u u La.
_,0 0
'' 0
.H .+_, u
C) -c-d
G Ti
0• ••-•
•0 .5 V
cu
= r,
R ..,
I 0
cNI
LI
... 1,-.
• o ,s 0
C.) bo
.5 cri I 174
4.J
4 ..._
V, -6.'
•,- 0
0-, E o
4.)
0 •...,
a
43 g, cs " ,..,,
,.., .s —
.-. ,
4—)...., (...) 0 0 0 0 b.
;-..1 _
(1.) la' ti •c>
:)
.4 -t
Q
8
0 '0 -c, 1) • °DP". c;
ci o '-' ".cl (") 6 6 ' 8 go c, 0
.g a)
o c4 .2
8 u 2
v ,,-.
w, ai
-0
• -0 ,•-.▪ a; :_, U
--- a-, — U U C.> •-c) V) V) V) v) 733
XI i
..p 0 '71 0
CI •W
It
0 .4 0
LO 'Fn..
t 0 0 0
PI '1',Z9 6 0 E '14 0 0
O t
a4., 5 -,1
v .--, I.
4 .22 .0
4.—,
Cri 1.4
C.?
to 0 'g C)
0, (..) 0 0 0•C .0 0-1) 0 U 5 g •ci, ' '18. 0 u,
4 i Q
6 .0 CI p el, u
•cl a c'd 0 = ol
, e m
,r)
U r-4 A 6
•a
1 0 ,
DocuSign Envelope ID:AC19022C-A771-43C1-A176-659B1BBA1584
c' 0 N
bl
q
c. N
• (1.)
t(,(43 c9)
' II
N IN
' (x>
C, /
U
o
•
•
c
"Tg
A .
t.
••.ci ttt E I
F"4 g 5 a 44)
ty,
, 0 0
c-) U t•-,4
0