Loading...
HomeMy WebLinkAboutA106 - FLOOR FINISH PLANDN UP 1.4 1.41 1 2 2 2.1 2.1 2.5 2.5 3 3 3.5 3.5 3.9 4 4 5 5 5.4 5.4 6 6 4.4 B B C C D D E E F F G G A A Z Y FLORAL PREP 315 F2 FLORAL COOLER 316 F2 PRODUCE COOLER 314 F2 PRODUCE PREP 313 F2 KITCHEN 312 F2 COLD COOKED PREP 311 F2 SCULLERY 309 F2 COLD COOKED COOLER 310 F2 MEAT & SEAFOOD PREP 304 F2 MEAT & SEAFOOD COOLER 303 F2 BAKERY PREP 302 F2 DAIRY COOLER 300 F2 BREAK ROOM 405 F1 WELLNESS ROOM 406 F1 RESTROOM 407 F2 RESTROOM 408 F2 BULK COOLER 305 F2 ICE CREAM FREEZER 306 F6 BAKERY DELI GROCERY FREEZER 307 F6 MEAT & SEAFOOD FREEZER 308 F6 DAIRY SALES 111 F1 GROCERY SALES 109 F1 FROZEN SALES 110 F1 BEER AND WINE SALES 107 F1 BAKERY SERVICE AISLE 112 F1 DELI PREP 202 F2 FRONT END CHECKOUT AREA 101 F1 FLORAL SALES 114 F1 PRODUCE SALES 113 F1 MEAT SERVICE AISLE 203 F2 BULK/COFFEE/CANDY SALES 108 F1 INSTACART 404 F1 MEN'S R.R. 402 F2 WOMEN'S R.R. 401 F2 OFFICE 400 F1 FIRE RISER 503 F5 RECEIVING 502 F5 BOH CORRIDOOR 504 F5 BOH 500 F5 7'-0"41'-0 1/2"22'-7 1/2"ELECTRICAL ROOM 501 ETR BAKERY COOLER 301 F2 CLOSET 403 F1 ENTRY/EXIT VESTIBULE 100 F1 TR8 TR8 TR4 TR3TR3 TR8 TR4 TR7 TR7 TR7 TR7 TR7 TR7TR7TR4 TR4 TR5 TR5 TR5TR2 TR8TR8TR2 TR2 TR2 TR3 15'-0"TR3 RESTROOM COORIDOR 409 F1 4 4 4 4 4 4 4 4 4 4 TR10 6 4 R 4' - 2 1/4"R 3' - 3 1/2"R 3' - 7 1/2"R 3' - 4 1/4" 12'-4 1/2" 9'-2 1/2"13'-0"17'-4"9"4'-4 1/2"26'-2" TR9 MOP SINK 414 F9 3 IT 413 F5 F11 F11 F11 5'-1" 21'-3 1/2" 10'-2 1/2" 3'-2"3'-2"10'-2 1/2"17'-7"3'-2"31'-6"27'-9 1/2"F4 4 4 4 8' - 1" FLOORING TRANSITION TO BE UNDER CASES. TR11 TR11 TR11TR11 TR11 UP SLOPE CONCRETE TR9 LEGEND F1 F2 F3 F4 F5 F6 LUXURY VINYL TILE 121.9 cm x 18.4 cm FORMAT -RUNNING BOND QUARRY TILE WALK-OFF MAT SEALED CONCRETE SEALED CONCRETE (NON -SLIP) F7 NOT USED F8 NOT USED F9 RESINOUS FLOORING F10 NOT USED F11 NOT USED LUXURY VINYL TILE 121.9 cm x 18.4 cm FORMAT - RUNNING BOND F1/F11 BUTT TILE TOGETHER F2 F1/F11 THRESHOLD T2 SET IN FULL BEAD OF CAULK AND SCREWED TO CONCRETE. REFER TO MATERIAL FINISH SCHEDULE ON SHEET A600 FREEZER WALL BEYOND 1/4"X4" SLEEVE ANCHORS.(4) PER OPENING THRESHOLD BY COOLER VENDOR TRANSITION DETAILS TRANSITION DETAILTR-3 TRANSITION DETAILTR-2 NOT USEDTR-1 TRANSITION DETAILTR-5 NOT USEDTR-6 TRANSITION DETAILTR-4 TRENCH DRAIN, REF TO DETAIL 6- P502 FACE OF COOLER BOX F2/F5 PLATE ON TOP OF COOLER PANEL DOOR OPENING. NOTE: SEE PLUMBING DWG'S FOR TRENCH GRATING DEPTH F2 TRANSITION DETAILTR-8 F2 THRESHOLD T1 SET IN FULL BEAD OF CAULK AND SCREWED TO CONCRETE SLAB. REFER TO MATERIAL FINISH SCHEDULE ON SHEET A600 TRANSITION DETAILTR-9 THRESHOLD G.C. REFERENCE DOOR SCEDULE. TRANSITION DETAILTR-10 F5 4" REF PLUMBING FOR TRENCH DRAIN SECTION THRU OUTLET STEP BACK FOOTING AROUND TRENCH DRAIN OUTLET COOLER WALL W1 APPLIED TO COOLER. REFER TO PARTITION DETAILS F2 INSIDE OF COOLER INTEGRAL B2 BASE AS SCHEDULED TRANSITION DETAILTR-11 SLOPE SLAB TO TRENCH CONCRETE SLAB MAX1/2"TRANSITION DETAILTR-7 THRESHOLD T1 SET IN FULL BEAD OF CAULK AND SCREWED TO CONCRETE SLAB. REFER TO MATERIAL FINISH SCHEDULE ON SHEET A600 F1 F2 THRESHOLD T1 SET IN FULL BEAD OF CAULK AND SCREWED TO CONCRETE SLAB. REFER TO MATERIAL FINISH SCHEDULE ON SHEET A600 SHEET NOTES 1. IN CONJUNCTION WITH THEIR TRADE SPECIFIC DRAWINGS, CONTRACTOR IS TO REFER TO RESPONSIBILITY SCHEDULE ON G001 FOR CLARIFICATION OF SCOPE THAT NEEDS TO BE COORDINATED WITH OTHER TRADES. 2. ALL DIMENSIONS ARE TAKEN FROM STUD UNLESS NOTED OTHERWISE. 3. FIELD VERIFY ALL DIMENSIONS. 4. NOT USED. 5. COMPLY WITH ALL MANUFACTURERS' RECOMMENDATIONS FOR SURFACE PREPARATION, MIXING INSTRUCTIONS, APPLICATION TECHNIQUES, ETC. 6. ALL EXPOSED CONCRETE SLAB AREAS TO BE SEALED. REFER TO SPECIFICATIONS. COORDINATE TIMING WITH TFM PM. 7. CONDUIT AND PIPE PENETRATIONS THROUGH FLOOR TILES ARE TO BE NEAT AND TIGHT. 8. EXTERIOR DOORS AND VESTIBULES AND THEIR THRESHOLDS ARE FURNISHED AND INSTALLED BY G.C. INTERIOR THRESHOLD PROVIDED AND INSTALLED BY TFM FLOORING/TILE VENDOR. 9. REFER TO MEP AND STRUCTURAL SLAB PLAN FOR LOCATION OF ALL FLOOR DRAINS, FLOOR SINKS, REFRIGERATION PITS. 10. USE EPOXY BONDING MORTAR AT ALL WALL TILE AND QUARRY TILE BASES AT PREP/COOLER/FREEZER BOXES. 11. NOT USED. 12. MAXIMUM VARIATION IN THE CONCRETE SLAB IS 1/8" IN 10 FEET FROM REQUIRED PLANE, WITH NO MORE THAN 1/16" VARIATION IN 24 INCHES WHEN MEASURED FROM THE HIGH POINTS IN THE SURFACE. 13. PROVIDE INDUSTRY STANDARD MOISTURE TEST ON ANY NEW SLAB-ON-GRADE OR ELEVATED SLABS SEVEN TO TEN DAYS PRIOR TO TFM'S FLOORING FINISHES INSTALLATION. 14. REFERENCE A105 FOR SLOPING FLOORS. KEYED NOTES NOT USED. CONTROL JOINT RESINOUS FLOORING FINISH. EXTEND RESINOUS FINISH 6" VERTICALLY AT EACH WALL. ALL WALL TILE AND QUARRY TILE BASE AT PREP/COOLER/FREEZER BOXES TO USE EPOXY BONDING MORTAR. FLOOR DRAIN; REFER TO PLUMBING DRAWINGS FOR SPECIFICATION AND LOCATION. PROVIDE GROUT LINE AT TRANSITIONS UNDER EQUIPMENT, TYP. FLOOR SINK; REFER TO PLUMBING DRAWINGS FOR SPECIFICATION AND LOCATION. 1 2 3 4 5 6 7 PROJECT NORTH SHEET NO. This drawing was prepared for use on a specific site contemporaneously with its issue date and it is not suitable for use on a different project site or at a later time. Use of this drawing for reference or example on another project requires the services of properly licensed architects and engineers. Reproduction of this drawing for reuse on another project is not authorized and may be contrary to the law. BRR Original printed on recycled paper COPYRIGHT NOTICE CONSULTANT PROJECT NO. SHEET TITLE ISSUES & REVISIONS CONSULTANT LOGO DRAWN BY: REBECCA BEASLEY PROFESSIONAL SEAL PROJECT MANAGER: DAN VON SEGGERN DOCUMENT DATE: CHECKED BY: JOHN SCHWEIGER PROJECT NAME PROJECT ADDRESS TREVOR TYSON HOLCOMB ARCHITECT AR11800234 ARCHITECT OF RECORD: TREVOR TYSON HOLCOMB 8131 METCALF AVENUE SUITE 300 OVERLAND PARK, KS 66204 www.brrarch.com TEL: 913-262-9095 FAX: 913-262-9044 12/7/2021 12:17:48 PMFLOOR FINISH PLAN A106 62930563 12/07/21 THE FRESH MARKET 1392 S. RANGELINE ROAD CARMEL, IN 46032 1/8" = 1'-0"1 FINISH FLOOR PLAN NO. DATE DESCRIPTION 02/07/22