Loading...
HomeMy WebLinkAboutE112_Electrical SchedulesHILL PHOENIX TO DETERMINE NUMBER OF LIGHTING CONTACTORS REQUIRED BASE ON PANELBOARD SCHEDULES. 1. 20A, 4-POLE, NORMALLY CLOSED, ELECTRICALLY HELD LIGHTING CONTACTOR WITH 120V COIL AND 600V LINE CONTACTS MOUNTED IN POWERPLUS UNIT. QUANTITY OF CONTACTORS REQUIRED FOR EACH ZONE SHALL BE DETERMINED BASED ON THE PANELBOARD SCHEDULES RATHER THAN FROM THIS DIAGRAM. 2. RELAY CONTACTS ON CPC CONTROL BOARD INSIDE POWERPLUS UNIT. 3. ALL WIRING SHALL COMPLY WITH THE 2011 NEC. 4. ALL PRE-WIRED EQUIPMENT MUST BE LISTED AND LABELED PER NEC 110.3 (A AND B). 5. FLASH PROTECTION WARNING LABELS ON SWITCHBOARDS AND PANELBOARDS SHALL BE INSTALLED PER NEC 110.16. 6. SPACES ABOUT ELEC EQUIPMENT SHALL MEET NEC 110.26 (A-F). 7. CONDUCTORS INSTALLED IN UNDERGROUND RACEWAYS MUST BE RATED FOR WET LOCATIONS. 8. ALL CABLE OR RACEWAY WIRING INSTALLED IN EXPOSED OR CONCEALED LOCATIONS UNDER METAL CORRUGATED SHEET ROOF DECKING SHALL BE INSTALLED AND SUPPORTED PER NEC 300.4. 9. CONTACTOR TO BE SHIPPED LOOSE ALONG WITH AN ENCLOSURE. SEE DETAIL 5, NOTE 1 ON SHEET E113 FOR MORE INFORMATION. RUN #10 GROUND FROM "INV" TO CONTACTOR ENCLOSURE. NOTES - 1/E112 SHEET NO. This drawing was prepared for use on a specific site contemporaneously with its issue date and it is not suitable for use on a different project site or at a later time. Use of this drawing for reference or example on another project requires the services of properly licensed architects and engineers. Reproduction of this drawing for reuse on another project is not authorized and may be contrary to the law. BRR Original printed on recycled paper COPYRIGHT NOTICE PROJECT NO. SHEET TITLE ISSUES & REVISIONS DRAWN BY: PROFESSIONAL SEAL PROJECT MANAGER: DOCUMENT DATE: CHECKED BY: PROJECT NAME PROJECT ADDRESS 1 2 3 4 5 ABCDEABCDE12 3 4 5 8131 METCALF AVENUE SUITE 300 OVERLAND PARK, KS 66204 www.brrarch.com TEL: 913-262-9095 FAX: 913-262-9044 ARCHITECT OF RECORD: 62930563 12/07/2021 THE FRESH MARKET The Centre Retail Center NO. DATE DESCRIPTION An Erdman Anthony Company 552 Fort Evans RD STE 200 Leesburg, VA 20176 703.777.5988 Leesburg@erdmananthony.com 116th St. and Rangeline Rd. Carmel, Indiana ELECTRICAL SCHEDULES E-112 BSD DSP PANEL SCHEDULE PF 208 Volt, 3 Phase, 4 Wire, 72 Pole, 225 Amp, Flush Mount, MLO Panel, Rated at 10,000 AIC. #Description P A W Cond FLA Watts KwA KwB KwC #Description P A W Cond FLA Watts KwA KwB KwC 1 (1,2) Men's Hand Dryer 1 20 #12 3/4" 13 1500 1.5 2 Recept - F.E Office 1 20 3 360 0.4 3 (1,2) Women's Hand Dryer 1 20 #12 3/4" 13 1500 1.5 4 Recept - F.E Office 1 20 3 360 0.4 5 (1) Electric Water Cooler 1 20 #12 3/4" 6 700 0.7 6 Recept - F.E Office 1 20 3 360 0.4 7 Coffee Grinder 1 15 #10 1" 9 1100 1.1 8 Recept - F.E Office 1 20 3 360 0.4 9 Coffee Grinder 1 15 #10 1" 9 1100 1.1 10 Recept - F.E Office Comp. Cart 1 20 3 360 0.4 11 (2) Floral Sink Instahot 2 30 #10 1" 22 4576 2.3 12 Floor Rec. - Utility Table 1 20 5 540 0.5 #10 22 2.3 14 Recept Bagged Ice Freezer 1 20 #12 3/4" 10 1200 1.2 15 Recepts- Floral 1 20 #12 1" 3 360 0.4 16 Auto Door Operator 1 20 #12 3/4" 7 800 0.8 17 Recepts- Floral 1 20 #12 1" 3 360 0.4 18 Auto Door Operator 1 20 #12 3/4" 7 800 0.8 19 Instacart Heat & Hold 1 20 #12 1" 16 1920 1.9 20 Auto Door Operator 1 20 #12 3/4" 7 800 0.8 21 Instacart True T49 Refrigerator 1 20 #12 1" 10 1200 1.2 22 Registers 1 and 2 Belts 1 20 #12 1" 3 400 0.4 23 Instacart True T23 Freezer 1 20 #12 1" 10 1200 1.2 24 Registers 3 and 4 Belts 1 20 #12 1" 3 400 0.4 25 Nut Grinder 2 15 #10 1" 10 2080 1.0 26 Registers 5 and 6 Belts 1 20 #12 1" 3 400 0.4 #10 10 1.0 28 Recept- Powered Wheel Chair 1 20 #12 3/4" 2 180 0.2 29 Nut Grinder 2 15 #10 1" 10 2080 1.0 30 Recept - Outdoor/Vest Bug Lt 1 20 #12 3/4" 2 276 0.3 #10 10 1.0 32 Recept - Outdoor/Window Disp 1 20 6 720 0.7 33 Nut Grinder 2 15 #10 1" 10 2080 1.0 34 (2) Men's Sink Instahot 2 20 #10 3/4" 22 4576 2.3 #10 10 1.0 #10 22 2.3 37 Nut Grinder 2 15 #10 1" 10 2080 1.0 38 (2) Women's Sink Instahot 2 30 #10 3/4" 22 4576 2.3 #10 10 1.0 #10 22 2.3 41 Coffee Brewer 2 20 #10 1" 14 2900 1.5 42 Front End Microwave 1 20 #12 1" 10 1200 1.2 #10 14 1.5 44 Floor Recept - Checkout 1 20 #10 1" 2 180 0.2 45 Coffee Brewer 2 20 #10 1" 14 2900 1.5 46 Floor Recept - Checkout 1 20 #10 1" 2 180 0.2 #10 14 1.5 48 Floor Recept - Checkout 1 20 #10 1" 2 180 0.2 49 6' Berry Produce Case 2 20 #10 1" 15 3180 1.6 50 Floor Recept - Seasonal Wine 1 20 #10 1" 2 180 0.2 #10 15 1.6 52 Floor Recept - Seasonal Bulk 1 20 #10 1" 2 180 0.2 53 6' Berry Produce Case 2 20 #10 1" 15 3180 1.6 54 Floor Recept - Seasonal Beer 1 20 #10 1" 2 180 0.2 #10 15 1.6 56 Column Recepts - Produce 1 20 #12 1" 2 180 0.2 57 SPARE 1 20 0 0.0 58 Column Recepts - Gondolas 1 20 #12 1" 2 180 0.2 59 SPARE 1 20 0 0.0 60 Recept - Refrig WIFI 1 20 #12 3/4" 1 100 0.1 61 SPARE 1 20 0 0.0 62 SPARE 1 20 0 0.0 63 SPARE 1 20 0 0.0 64 SPARE 1 20 0 0.0 65 SPARE 1 20 0 0.0 66 Recept- Coffee Conv 1 20 #12 1" 2 180 0.2 67 SPARE 1 20 0 0.0 68 Roof Recepts 1 20 #12 ` 3 360 0.4 69 SPARE 1 20 0 0.0 70 DS-1/FC-1 2 15 #12 3/4" 5 1000 0.5 71 Drink Case Condensate Pan 1 15 13 1500 1.5 #12 5 0.5 14.6 10.3 12.6 7.0 7.7 7.0 Total KW Phase A.........................................................21.6 Total Connected kW.......................................... 59 Total KW Phase B.........................................................18.0 Total Connected Amps..................................... 165 Total KW Phase C.........................................................19.6 Minimum Service Size....................................... 206 AMPS NOTES: (1) Breaker shall be GFCI for personel protection. (2) Handle Pad Lock device to lock breaker in Off position for servicing. PANEL SCHEDULE CR 208 Volt, 3 Phase, 4 Wire, 30 Pole, 125 Amp, Flush Mount MLO Panel with Additional Isolated Ground Bar and with Integral TVSS. Rated at 10,000 AIC #Description P A W Cond FLA Watts KwA KwB KwC #Description P A W Cond FLA Watts KwA KwB KwC 1 IG Recept - Cashier 1 20 #12 1" 3 400 0.4 2 Space 1 0 0.0 3 IG Recept - Cashier 1 20 #12 1" 3 400 0.4 4 Space 1 0 0.0 5 IG Recept - Cashier 1 20 #12 1" 3 400 0.4 6 Space 1 0 0.0 7 IG Recept - Cashier 1 20 #12 1" 3 400 0.4 8 Space 1 0 0.0 9 IG Recept - Cashier 1 20 #12 1" 3 400 0.4 10 Space 1 0 0.0 11 IG Recept - Cashier 1 20 #12 1" 3 400 0.4 12 Space 1 0 0.0 13 SPARE 1 20 0 0.0 14 Space 1 0 0.0 15 IG Recept - F.E Office Comp Crt 1 20 #12 3/4" 3 400 0.4 16 Space 1 0 0.0 17 IG Recept - FE Office I.E.I Panel 1 20 #12 3/4" 3 400 0.4 18 Space 1 0 0.0 19 IG Recept - Order Kiosk 1 20 #12 1" 3 400 0.4 20 Space 1 0 0.0 21 IG Recept - Instacart Cashier 1 20 #12 3/4" 3 400 0.4 22 Space 1 0 0.0 23 GF-IG Recept Coffee Scale 1 20 2 180 0.2 24 Space 1 0 0.0 25 Space 1 20 0 0.0 26 TVSS 3 15 0 0.0 27 Space 1 20 0 0.0 0 0.0 29 Space 1 20 0 0.0 0 0.0 1.2 1.6 1.4 0.0 0.0 0.0 Total KW Phase A.........................................................1.2 Total Connected kW.......................................... 4 Total KW Phase B.........................................................1.6 Total Connected Amps..................................... 12 Total KW Phase C.........................................................1.4 Minimum Service Size....................................... 15 AMPS NOTES: Provide Isolated Ground Conductor for All Branch Circuits. Shared Neutral Conductors shall not be Permitted. (1) Provide new breaker compatible with existing panel and matching the existing AIC rating. PANEL SCHEDULE PB 208 Volt, 3 Phase, 4 Wire, 42 Pole, 100 Amp MLO Panel. #Description P A W Cond FLA Watts KwA KwB KwC #Description P A W Cond FLA Watts KwA KwB KwC 1 (2) Double Wide Proof Box 3 20 #12 3/4" 4 1584 0.5 2 Recept. - Bread Slicer 1 20 #12 3/4" 6 760 0.8 #12 4 0.5 4 Recept. - Bakery Microwave 1 20 #12 3/4" 13 1500 1.5 #12 4 0.5 6 Recept. - 20 QT Mixer 1 20 #12 3/4" 12 1400 1.4 7 (2) Double Rack Oven Blower 3 20 #12 3/4" 4 1500 0.5 8 Recepts - Bakery Prep 1 20 #12 3/4" 5 540 0.5 #12 4 0.5 10 Recept - Food Processor 1 20 #12 3/4" 7 840 0.8 #12 4 0.5 12 1 20 0 0.0 13 Rack Oven Controls 1 20 #12 3/4" 8 1000 1.0 14 1 20 0 0.0 15 1 0 0.0 16 1 20 0 0.0 17 1 0 0.0 18 1 20 0 0.0 19 Space 1 0 0.0 20 1 0 0.0 21 Space 1 0 0.0 22 1 20 0 0.0 23 1 0 0.0 24 1 20 0 0.0 25 Space 1 0 0.0 26 1 20 0 0.0 27 Space 1 0 0.0 28 1 20 0 0.0 29 Space 1 0 0.0 30 1 20 0 0.0 31 Space 1 0 0.0 32 Space 1 0 0.0 33 0 0.0 34 Space 1 0 0.0 35 0 0.0 36 Space 1 0 0.0 37 Space 1 0 0.0 38 Space 1 0 0.0 39 Space 1 0 0.0 40 Space 1 0 0.0 41 Space 1 0 0.0 42 Space 1 0 0.0 2.0 1.0 1.0 1.3 2.3 1.4 Total KW Phase A.........................................................3.3 Total Connected kW.......................................... 9 Total KW Phase B.........................................................3.4 Total Connected Amps..................................... 25 Total KW Phase C.........................................................2.4 Minimum Service Size....................................... 32 AMPS NOTES: (1) Breaker shall be GFCI for personel protection. (2) Provide a Handle Pad Lock device to lock breaker in Off position for servicing. (3) Provide a Handle Blocking Device to Prevent Inadvertant Shutoff. PANEL SCHEDULE PD 208 Volt, 3 Phase, 4 Wire, 42 Pole, 225 Amp, Flush Mount, MLO Panel. #Description P A W Cond FLA Watts KwA KwB KwC #Description P A W Cond FLA Watts KwA KwB KwC 1 (1) Pizza Prep Table - Kitchen 1 20 #12 3/4" 5 560 0.6 2 Deli Hood Ltg 1 20 #10 3/4" 8 1000 1.0 3 Recepts - Kitchen Conv. 1 20 #12 3/4" 5 540 0.5 4 Deli Hood Controls 1 20 #12 3/4" 3 400 0.4 5 Recept - CCP Prep Slicer 1 20 #12 3/4" 4 420 0.4 6 Shunt Trip Power 1 20 #12 3/4" 4 500 0.5 7 Recep. - CCP Pizza Wrap 1 20 #10 3/4" 10 1150 1.2 8 (2) Blast Chiller 3 30 #10 3/4" 19 6700 2.2 9 (1) UC Refrig. CCP Prep (T48) 1 20 #12 3/4" 3 360 0.4 #10 19 2.2 11 Food Processor - CCP Cheese 1 20 #12 3/4" 4 420 0.4 #10 19 2.2 13 Food Processor - CCP 1 20 #12 3/4" 7 840 0.8 14 Hood CPC Board Power 1 20 #12 3/4" 1 100 0.1 15 Food Processor - CCP Dicer 1 20 #12 3/4" 7 840 0.8 16 SPARE 1 20 0 0.0 17 (1) UC Refrig CCP Prep (T48) 1 20 #12 3/4" 3 360 0.4 18 SPARE 1 20 0 0.0 19 (1) Pizza Prep Table - CCP 1 20 #12 3/4" 5 560 0.6 20 SPARE 1 20 0 0.0 21 Recept - CCP Conv. 1 20 #12 3/4" 2 180 0.2 22 SPARE 1 20 0 0.0 23 Recept - Veggie Noodler PP 1 20 #12 3/4" 4 500 0.5 24 SPARE 1 20 0 0.0 25 Recept - Produce Prep 1 20 #12 3/4" 3 360 0.4 26 SPARE 1 20 0 0.0 27 Recept - Overwrap Machine PP 1 20 #12 3/4" 7 780 0.8 28 SPARE 1 20 0 0.0 29 Rec - Dept Mgr's Desk/Bug Lt 1 20 0 0.0 30 Space 1 0 0.0 31 SPARE 1 20 0 0.0 32 Space 1 0 0.0 33 SPARE 1 20 0 0.0 34 Space 1 0 0.0 35 Space 1 0 0.0 36 Space 1 0 0.0 37 SF Steamer 3 50 #6 1" 33 12000 4.0 38 Space 1 0 0.0 #6 33 4.0 40 Roof Recepts 1 20 0 0.0 #6 33 4.0 42 Roof Recepts 1 20 #12 3/4" 5 540 0.5 7.5 6.7 5.7 3.3 2.6 3.3 Total KW Phase A.........................................................10.8 Total Connected kW.......................................... 29 Total KW Phase B.........................................................9.3 Total Connected Amps..................................... 81 Total KW Phase C.........................................................9.0 Minimum Service Size....................................... 101 AMPS NOTES: (1) Provide a GFCI Breaker. (2) Provide a Handle Pad Lock device to lock breaker in Off position for servicing. (3) Provide a Handle Blocking Device to hold breaker in On position. Ltg Control Zones LIGHTING INVERTER INV Ltg Control Zones120/208 Volt, 1 Phase, 3 Wire, 2.7 KVA Lighting Inverter with 4 output breakers #Description P A W Cond FLA Watts KwB KwC # Description P A W Cond FLA Watts KwB KwC EMR 1 (1) SPARE 1 20 #12 3/4" 0 0.0 2 (1) Stocking Emergency Lts 1 20 #12 3/4" 5 582 0.6 C2 EMR 3 (1) Grocery Emergency Lts 1 20 #12 3/4" 2 255 0.3 4 (1) Produce Emergency Lts 1 20 #12 3/4" 4 485 0.5 C2 0.0 0.3 0.6 0.5 Total KW Phase B.........................................................0.6 Total Connected Kw.......................................... 1.3 Total KW Phase C.........................................................0.7 Total Connected Amps..................................... 4 Minimum Service Size....................................... 5 AMPS NOTES: (1) See Detail 10/E113 All circuits fed from the lighting inverter shall be field wired through a normally closed lighting contactor mounted above the lighting inverter. See detail 5/E13. Contractor shall ensure that load is balanced on the two phases of the inverter as much as possible. Maximum amperage per phase shall be 11.2 amps. PANEL SCHEDULE PDS 208 Volt, 3 Phase, 4 Wire, 42 Pole, 225 Amp, Flush Mount, MLO Panel. #Description P A W Cond FLA Watts KwA KwB KwC #Description P A W Cond FLA Watts KwA KwB KwC 1 (Combi Shunt Trip Space) 1 0 0.0 2 (1,3)10 Pan Combi (C4T10) 3 60 #6 1-1/4" 50 18000 6.0 3 (1,3)10 Pan Combi (C4T10) 3 60 #6 1-1/4" 50 18000 6.0 #6 50 6.0 #6 50 6.0 #6 50 6.0 #6 50 6.0 8 (Combi Shunt Trip Space) 1 0 0.0 9 (Combi Shunt Trip Space) 1 20 #12 3/4" 0 0.0 10 (1) Electric Kettle 3 40 #8 3/4" 27 9800 3.3 11 (1,3) 6 Pan Combi (C4T6) 3 30 #8 3/4" 25 9000 3.0 #8 27 3.3 #8 25 3.0 #8 27 3.3 #8 25 3.0 16 (Kettle Shunt Trip Space) 1 20 #12 3/4" 0 0.0 17 (Fryer Shunt Trip Space) 1 20 0 0.0 18 (1) Rice Cooker 2 20 #10 3/4" 7 1456 0.7 19 (1) Pressure Fryer 3 50 #8 3/4" 38 13680 4.6 #10 7 0.7 #8 38 4.6 22 (Rice Cooker Shunt Trip Space) 1 0 0.0 #8 38 4.6 24 (1) Rice Cooker 2 20 #10 3/4" 7 1456 0.7 25 (Alto Sham Shunt Trip Space) 1 0 0.0 #10 7 0.7 27 (1) Alto Sham Oven 3 40 #8 3/4" 29 10600 3.5 28 (Rice Cooker Shunt Trip Space) 1 0 0.0 #8 29 3.5 30 Space 1 0 0.0 #8 29 3.5 32 Space 1 0 0.0 33 Blast Chiller 3 30 #10 3/4" 19 6700 2.2 34 Space 1 0 0.0 #10 19 2.2 36 Space 1 0 0.0 #10 19 2.2 38 Space 1 0 0.0 39 Space 1 0 0.0 40 Space 1 0 0.0 41 Space 1 0 0.0 42 Space 1 0 0.0 19.3 19.3 19.3 10.7 9.3 10.7 Total KW Phase A.........................................................30.0 Total Connected kW.......................................... 89 Total KW Phase B.........................................................28.6 Panel Derated per NEC 220 Total KW Phase C.........................................................30.0 Minimum Service Size....................................... 160 AMPS NOTES: (1) Breaker shall be shunt trip and be connected to the existing hood control panel so it trips upon activation of the fire suppression system. (2) Provide a GFCI Breaker. (3) Provide a Handle Pad Lock device to lock breaker in Off position for servicing. 12/08/2021 02/07/22