Loading...
HomeMy WebLinkAboutF101_Fire Protection Plan and Notes1.4 1 2 2.1 2.5 3 3.5 3.9 4 5 5.4 6 B C D E F G A Z Y BAGGED ICE CHESTDELLFRIOEFE-5052HOBART OV500G2-EE HOBARTPW2E-41 TRUET-49-HCTRUET-23F-HCINTERMETROC535-HFC-U-GYBACE, LLCV63-HDLP HONHC1872HONHC1872HONHC1872HONHC1872 ATLANTIC FOOD BARSHHDD5136-TFMHONHC1872 HONHC1872 UP UP MEAT & SEAFOOD COOLER MEAT & SEAFOOD PREP OFFICE WOMEN'S R.R. MEN'S R.R. INSTACART ENTRY/EXIT VESTIBULE FRONT END CHECKOUT AREA FLORAL SALES PRODUCE SALES MEAT SERVICE AISLE BAKERY SERVICE AISLE DAIRY SALES FROZEN SALES GROCERY SALES BEER AND WINE SALES BULK/COFFEE/CANDY SALES DELI PREP RECEIVING BOH CORRIDOOR FLORAL COOLER FLORAL PREP PRODUCE COOLER PRODUCE PREP KITCHEN COLD COOKED PREP COLD COOKED COOLER SCULLERY FIRE RISER BAKERY PREP BAKERY COOLER DAIRY COOLER BREAK ROOM RESTROOM RESTROOM WELLNESS ROOM BULK COOLER ICE CREAM FREEZER BAKERY DELI GROCERY FREEZER MEAT & SEAFOOD FREEZER ELECTRICAL ROOM RESTROOM COORIDOR CASE 30" MAX SPRINKLER COVERAGE VALANCE WALL TO DECK ABOVE CANOPY, PRE-FINISHED BY TFM VENDOR DO NOT INSTALL SPRINKLER HEADS WITH-IN CANOPY SYSTEM SPRINKLER HEAD MOUNTED FOR APPROPRIATE COVERAGE OF SERVICE AISLE FLOOR CASE 30" MAX SPRINKLER COVERAGE LOW PROFILE VALANCE WALL HUNG FROM STRUCTURE CANOPY, PRE-FINISHED BY TFM VENDOR DO NOT INSTALL SPRINKLER HEADS WITH-IN CANOPY SYSTEM SPRINKLER HEAD MOUNTED FOR APPROPRIATE COVERAGE OF SERVICE AISLE FLOOR DELI CEILING COORDINATE SPRINKLER MAIN WITH LOW PROFILE VALANCE WALL AND FEEDS TO BE HIDDEN BEHIND VALANCE WALL - COORDINATE PIPE LOCATIONS WITH ALL TRADES TIE-RODS TO DECK ABOVE PROVIDE SINGLE VERTICAL DROP DOWN TO DELI, ABOVE FINISHED CEILING. ROUTE ALL DISTRIBUTION PIPING LOW AND TIGHT TO DELI CEILING, TYPICAL. ALTERNATE ROUTING FOR MEZZ. COVERAGE FROM SALES FLOOR. HORIZONTAL FIRE SPRINKLER LINES TO BE HELD TIGHT TO UNDERSIDE OF STRUCTURE. VERTICAL ROUTING TO BE CONCEALED. DEMISING WALL OPEN SALES FLOOR BACKROOM STORAGE TOP TYP. COOLER/FREEZERMEZZ. FINISH FLOOR FIN. FLOOR SPRINKLER COVERAGE TO INCLUDE AND BE ROUTED IN A MANNER THAT PROVIDES SERVICE TO COOLERS AND FREEZER BOX ROOMS (BY TFM) NOTE: SPRINKLER SHALL COORDINATE AND DESIGN SPRINKLER SYSTEM SO AS TO ALLOW FOR LOW TEMPERATURE ROOMS AND ASSOCIATED REQUIREMENTS. TYP. REFRIGERATED ROOM IS 45 DEGREES. TYP. FREEZER ROOM IS BELOW 32 DEGREES. SHEET NO. This drawing was prepared for use on a specific site contemporaneously with its issue date and it is not suitable for use on a different project site or at a later time. Use of this drawing for reference or example on another project requires the services of properly licensed architects and engineers. Reproduction of this drawing for reuse on another project is not authorized and may be contrary to the law. BRR Original printed on recycled paper COPYRIGHT NOTICE PROJECT NO. SHEET TITLE ISSUES & REVISIONS DRAWN BY: PROFESSIONAL SEAL PROJECT MANAGER: DOCUMENT DATE: CHECKED BY: PROJECT NAME PROJECT ADDRESS 1 2 3 4 5 ABCDEABCDE12 3 4 5 8131 METCALF AVENUE SUITE 300 OVERLAND PARK, KS 66204 www.brrarch.com TEL: 913-262-9095 FAX: 913-262-9044 ARCHITECT OF RECORD: 62930563 12/07/2021 THE FRESH MARKET The Centre Retail Center NO. DATE DESCRIPTION An Erdman Anthony Company 552 Fort Evans RD STE 200 Leesburg, VA 20176 703.777.5988 Leesburg@erdmananthony.com 116th St. and Rangeline Rd. Carmel, Indiana FIRE PROTECTION PLAN & NOTES F101 MEA JTL LEGEND --- PRE-MANUFACTURED PREP/COOLER BOX CEILING. --- CEILING --- TYPE 1 HOOD WITH ANSUL SYSTEM --- PRE-MANUFACTURED FREEZER BOX CEILING. SPRINKLER GENERAL NOTES A. SCOPE 1. NOT APPLICABLE 2. THE ENTIRE BUILDING SHALL BE FULLY SPRINKLED IN ACCORDANCE WITH NFPA 13 AND NFPA 231. THE ENTIRE FIRE PROTECTION SYSTEM SHALL MEET, AS A MINIMUM, ALL FEDERAL, STATE, AND LOCAL CODES AND ORDINANCES, AND MUST BE APPROVED BY THE ENGINEER, FIRE MARSHALL, AND OTHER AUTHORITIES HAVING JURISDICTION. DESIGN CRITERIA LISTED ON THIS SHEET IS THE MINIMUM CRITERIA ACCEPTABLE. 3. REFER TO THE FIRE PROTECTION SPECIFICATIONS FOR ADDITIONAL INFORMATION REGARDING THE FIRE PROTECTION SYSTEM. DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY; WORK CALLED FOR IN EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE TREATED AS IF CALLED FOR BY BOTH. WORK SPECIFIED IN THESE DRAWINGS AND THE SPECIFICATIONS MAY EXCEED THE MINIMUM REQUIREMENTS OF LISTED CODES AND STANDARDS. 4. IT IS THE RESPONSIBILITY OF THE FIRE SPRINKLER CONTRACTOR TO INSTALL ALL ABOVEGROUND PIPING AND EQUIPMENT AS REQUIRED AND UNDERGROUND PIPING BETWEEN 5'-0" FROM THE BUILDING AND THE BUILDING LEAD-IN. 5. SIZING AND LOCATION OF ALL PIPES AND ALL SPRINKLER ACCESSORIES SHALL BE THE RESPONSIBILITY OF THE SPRINKLER CONTRACTOR. PIPING AND SPRINKLER HEADS SHOWN ON THE SPRINKLER DRAWINGS ARE CONCEPTUAL IN NATURE AND SHOULD NOT BE USED TO DETERMINE CUT LENGTHS OR FINAL LOCATIONS. SPRINKLER DRAWINGS MAY NOT SHOW PIPE ROUTING OFFSETS, RISERS, OR DROPS NECESSARY TO AVOID OBSTRUCTIONS. 6. THE FIRE SPRINKLER CONTRACTOR MUST SUBMIT SHOP DRAWINGS AND HYDRAULIC CALCULATIONS FOR LOCAL A.H.J. REVIEW. IF REQUIRED BY THE A.H.J., CONTRACTOR MAY BE REQUIRED TO SUBMIT SHOP DRAWINGS TO THE FIRE PROTECTION ENGINEER. BASIS FOR CALCULATION SHALL BE FLOW TEST DATA FROM NEARBY HYDRANT. TEST SHALL HAVE BEEN CONDUCTED WITHIN PAST 12 MONTHS. 7. THE SPRINKLER SYSTEM WITHIN THE BUILDING MUST BE MONITORED BY THE FIRE ALARM PANEL. ALL TAMPER SWITCHES, WATERFLOW INDICATORS, AND OUTSIDE ALARM BELL SHALL BE INSTALLED BY THE SPRINKLER CONTRACTOR. WIRING TO THE ALARM SYSTEM SHALL BE BY THE FIRE ALARMS SYSTEMS CONTRACTOR. 8. INSTALL SEISMIC BRACING COMPONENTS WHERE REQUIRED BY THE BUILDING CODE, BUILDING OFFICIAL, OR OTHER AUTHORITIES HAVING JURISDICTION. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLING ALL NECESSARY BRACING MEMBERS, TRAPEZE MEMBERS, AND REINFORCEMENT MEMBERS. ONLY RIGID BRACING IS ALLOWED, CABLE BRACING IS NOT PERMITTED. 9. SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE LOCATION OF SPRINKLER PIPING WITH ALL EQUIPMENT, APPLIANCES, DEVICES, AND STRUCTURES. CONTRACTOR IS RESPONSIBLE FOR BEING AWARE OF THE LOCATION OF HVAC DUCTS, DIFFUSERS, ELECTRICAL LIGHTING, PANELS, AND CEILING HEIGHTS. PENETRATION OR CUTTING OF STRUCTURAL MATERIALS IS NOT ALLOWED. ROUTING OF SPRINKLER MAINS OR BRANCH LINES UNDERNEATH ROOFTOP UNITS IS PROHIBITED. 10. CONTRACTOR SHALL IMMEDIATELY CONTACT THE ENGINEER IF DISCREPANCIES ARE FOUND IN THE FS DRAWINGS OR SPECIFICATIONS. CONTRACTOR SHALL CONTACT THE FIRE PROTECTION ENGINEER IMMEDIATELY IF DISCREPANCIES ARE FOUND BETWEEN THE CONTRACT DOCUMENTS ANDREQUIREMENTS OF SPECIFIED CODES OR AUTHORITIES HAVING JURISDICTION. WHERE CONFLICTS OCCUR BETWEEN THE DRAWINGS, SPECIFICATIONS, OR CODES, THE CONTRACTOR SHALL BY DEFAULT FOLLOW THE MOST RESTRICTIVE REQUIREMENT. 11. IT IS NOT THE INTENT OF THESE PLANS AND SPECIFICATIONS TO PROVIDE A COMPLETE DETAILED DESCRIPTION OF THE APPARATUS, MATERIALS, EQUIPMENT, ETC. WHICH IS REQUIRED TO MAKE A COMPLETE AND FUNCTIONAL INSTALLATION OF THIS SPECIFIC FIRE PROTECTION SYSTEM. IT SHALL BE THE RESPONSIBILITY OF THE SPRINKLER CONTRACTOR TO PROVIDE ALL REQUIRED MATERIAL AND EQUIPMENT AND PERFORM ALL WORK REQUIRED TO INSTALL A COMPLETE AND APPROVED INSTALLATION. 12. SEE PROJECT SPECIFICATIONS 13910 AND 13925 FOR MORE INFORMATION REGARDING SCOPE, MATERIALS, INSTALLATION, HANGERS AND BRACING, ACCEPTANCE TESTING, AND SPECIAL INSTRUCTIONS. 13. DO NOT PLACE SPRINKLER HEADS WITHIN TFM PROVIDED AWINGS. COORDINATE AND REQUEST ANY FLAME SPEAD INFORMATION FROM TFM REPRESENTATIVE PRIOR TO FINAL INSPECTIONS. B. MATERIALS 1. ALL SPRINKLER PIPING LESS THAN 2 DIAMETER SHALL BE MINIMUM SCHEDULE 40 BLACK STEEL WITH THREADED FITTINGS. ALL SPRINKLER PIPING GREATER THAN 2 DIAMETER SHALL BE MINIMUM SCHEDULE 10 BLACK STEEL. ALL THREADED PIPE MUST BE MINIMUM SCHEDULE 40 BLACK STEEL. 2. ALL DRAIN LINE PIPING SHALL BE GALVANIZED STEEL. 3. SPRINKLER HEADS SHALL BE QUICK RESPONSE; CONCEALED PENDANT OR UPRIGHT; AND OF A COLOR AND FINISH SUITABLE TO THE FRESH MARKET. CONCEALED PENDANTS MUST BE THE 'FLAT-PLATE' TYPE; 'DOMED' COVERS WILL NOT BE ACCEPTED. 4. ALL SPRINKLER PIPING NOT LOCATED IN CONDITIONED SPACE SHALL BE CORROSION PROTECTED. 5. UNDERGROUND PIPING SHALL BE DUCTILE IRON. C. INSTALLATION 1. ALL PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE STOPPED WITH AN APPROVED ASSEMBLY AS PRESCRIBED IN THE INTERNATIONAL BUILDING CODE. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIRE-RATED ASSEMBLIES. 2. ALL INSPECTOR'S TEST CONNECTIONS AND LOW POINT DRAINS SHALL BE PER NFPA 13 (UNLESS OTHERWISE NOTED) AND SHALL BE DISPLAYED ON THE SHOP DRAWINGS. MAIN DRAIN AND TEST PIPING SHALL BE ROUTED TO THE EXTERIOR OF THE BUILDING. PROVIDE CONCRETE SPLASH BLOCKS FOR ALL DRAINS AND TEST CONNECTIONS. 3. AUXILIARY DRAINS AND INSPECTOR'S TEST CONNECTIONS SHALL BE LOCATED TIGHT AGAINST THE PERIMETER WALLS (REFER TO TEST CONNECTION DETAIL ). 4. SPRINKLER PROTECTION MUST BE PROVIDED IN THE MOTOR ROOM AND ELEVATOR EQUIPMENT ROOM. THE BRANCH LINE SUPPLYING THE SPRINKLERS IN THESE ROOMS IS THE ONLY SPRINKLER PIPING PERMITTED TO ENTER THESE SPACES FROM FINISHED FLOOR TO THE ROOF DECK. SPRINKLER MAINS, CROSS MAINS, BRANCH LINES SERVING OTHER ROOMS, AUXILIARY DRAINS, AND INSPECTOR'S TEST CONNECTIONS SHALL BE ROUTED AROUND THESE LOCATIONS. 5. PIPING SHALL BE RUN CONCEALED IN ALL FINISHED CEILING AREAS, UNLESS OTHERWISE NOTED ON THESE DRAWINGS. SPRINKLER SUBCONTRACTOR IS RESPONSIBLE FOR PAINTING OF EXPOSED PIPING IN ALL AREAS WITHOUT FINISHED CEILINGS EXCEPT SALES FLOORS, INCLUDING MECHANICAL ROOMS AND STORAGE ROOM AREAS. PIPING MUST BE PREPARED, PRIMED, AND PAINTED A COLOR ACCEPTABLE TO THE ARCHITECT, IN ACCORDANCE WITH THE PAINT MANUFACTURER'S RECOMMENDATIONS. IN AREAS WHERE THE EXPOSED STRUCTURE IS PAINTED, THE SPRINKLER PIPING SHALL BE PAINTED TO MATCH TO STRUCTURE. 6. FOR AREAS WITH LAY-IN CEILING TILES, ALL HEADS SHALL BE PLACED IN THE CENTER OF THE TILE. IF REQUIRED BY THE A.H.J., PROTECT CEILING MEMBRANE WITH TRIM RING, OR FLEX CONNECTIONS, AS PER SEISMIC REQUIREMENTS. 7. PROVIDE FREEZE-PROTECTION FOR WET PIPING IN ALL AREAS SUBJECT TO TEMPERATURE LESS THAN 40° F. a. PROTECT FREEZERS, COOLERS, AND PREP AREAS WITH LISTED DRY PENDANT 8. ALL FREEZERS AND COOLER BOXES ARE PRE-MANUFACTURED ROOMS WITH INSULATED ROOF PANELS. COORDINATE SPRINKLER INSTALLTION WITH PANEL CONFIGURATION AS WELL AS WITH ADDITIONAL TRADESMEN (RC, PC, AND EC). 9. THE SPRINKLER CONTRACTOR SHALL ALLOW FOR ALL VERTICAL PIPING TO BE INSTALLED IN A CONCEALED MANNER, COORDINATED WITH TENANT/TFM FIXTURES & DECOR. 10. IN CASES WHERE RISER/STANDPIPE PROVIDES SPRINKLER PROTECTION FOR ADDITIONAL AREAS, SYSTEM TO ALLOW FOR ISOLATED FLOW ALARMS, TAMPER VALVES, ETC. 11. COORDINATE FIRE SPRINKLER MAIN TRUNK PIPING WITHIN MOTOR ROOM. HOLD ALL PIPING TIGHT TO UNDERSIDE OF DECKING. FIELD REVIEW WITH REFRIGERATION CONTRACTOR PRIOR TO PERMANENT PIPING INSTALLATION. D. HANGERS AND BRACING 1. WHERE REQUIRED BY THE BUILDING CODE, BUILDING OFFICIAL, OR OTHER AUTHORITIES HAVING JURISDICTION, PROVIDE RIGID SEISMIC BRACING IN CONFORMANCE WITH NFPA 13 (2002 WITH TIA'S), PROJECT SPECIFICATIONS, AND THE DETAILS ON THESE SPRINKLER SHEETS. 2. FIRE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLING ALL NECESSARY BRACING MEMBERS, TRAPEZE MEMBERS, AND REINFORCEMENT MEMBERS. ONLY RIGID BRACING IS ALLOWED, CABLE BRACING IS NOT PERMITTED. 3. IF REQUIRED, THE SPRINKLER CONTRACTOR SHALL SHOW ALL BRACING LOCATIONS AND DETAILS ON THE SHOP DRAWINGS. INCLUDE CALCULATIONS TO VERIFY SIZING OF SWAY BRACING PROVIDED. ALLOWABLE BRACE LOADS SHALL BE BASED ON A 30-44 DEG ANGLE RANGE. E. TESTING AND VERIFICATION 1. AT THE SPRINKLER SYSTEM BUILDING STUB-UP, BEFORE CONNECTING ABOVEGROUND PIPING TO THE UNDERGROUND LEAD-IN: a. CONTRACTOR SHALL OBTAIN THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR THE UNDERGROUND PIPING FROM THE UNDERGROUND PIPING INSTALLER. A COPY SHALL BE FORWARDED TO THE FP ENGINEER WITHIN TWO (2) BUSINESS DAYS. b. THE SPRINKLER CONTRACTOR SHALL FLUSH THE NEW UNDERGROUND FIRE SPRINKLER SUPPLY PIPING AT NOT LESS THAN 880 GPM FOR 6" PIPE. IN LIEU OF MEASURING THE DISCHARGE FLOW RATE, THE CONTRACTOR MAY ROUTE THE FLUSHING WATER FROM THE BUILDING STUB-UP TO THE BUILDING EXTERIOR THROUGH TEMPORARY PIPING OF DIAMETER NOT LESS THAN THE STUB-UP DIAMETER. PROVIDE PHOTOGRAPHS OF UG PIPING FLUSHING FLOWS TO THE ARCHITECT. 2. AT THE COMPLETION OF SYSTEMS TESTING, THE SPRINKLER CONTRACTOR SHALL COMPLETE AND PROVIDE TO THE ARCHITECT AND THE FRESH MARKET A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE PER NFPA 13 FOR ABOVEGROUND SPRINKLER PIPING SYSTEMS. 3. THE COMPLETELY ASSEMBLED ABOVEGROUND FIRE SPRINKLER SYSTEM SHALL BE TESTED FOR 2 HOURS AT 200 PSI, AND THERE SHALL BE NO LOSS OF PRESSURE OR VISIBLE LEAKAGE FOR THE DURATION OF THE TEST. F. SPECIAL INSTRUCTIONS 1. IN GYPSUM BOARD CEILINGS, SPRINKLERS SHALL BE LOCATED TO AVOID SURFACE MOUNTED LIGHTS AND OTHER OBSTRUCTIONS. TWO-PIECE EXTENDED ESCUTCHEONS ARE NOT ACCEPTABLE. 2. AREA OF CLOSETS AND OTHER SMALL ROOMS SHALL BE INCLUDED IN DESIGN CALCULATIONS IF A DESIGN AREA LESS THAN 1500 SF IS UTILIZED FOR WET SYSTEMS. ALL BATHROOMS AND CLOSETS SHALL BE PROTECTED BY SPRINKLERS. 3. PROTECT ALL COMBUSTIBLE CONCEALED SPACES AS REQUIRED BY NFPA 13 WHICH MAY NOT BE SHOWN ON THESE DRAWINGS, SUCH AS ACCESSIBLE AREAS IN FRONT TOWER, CANOPY, MANSARD AND ABOVE LOAD DOCK. 4. SCOPE OF FP ENGINEER'S DESIGN BEGINS AT 5'-0 FROM THE FACE OF BUILDING. DESIGN FOR UNDERGROUND PIPING, FIRE HYDRANT(S), BACKFLOW PREVENTERS, FIRE DEPT. CONNECTION, AND POST INDICATOR VALVE BY OTHERS. CONTRACTOR SHALL OBTAIN UNDERGROUND PIPING DESIGN INFO FROM THE UNDERGROUND PIPING DESIGNER. 5. THE ENTIRE BUILDING SPRINKLER SYSTEM SHALL BE DESIGNED TO DELIVER, AT MINIMUM, A DENSITY OF 0.20 gpm/s.f. OVER A MINIMUM REMOTE AREA OF 1950 s.f. 6. SEE SHEET E116 AND FIRE ALARM SPECIFICATIONS, DIVISION 28, FOR ADDITIONAL REQUIREMENTS. 12/08/2021 Digitally signed by Justin Litz 02/07/22