Loading...
HomeMy WebLinkAboutM201_Mechanical Plan1.41 2 2.5 3 3.5 4 5 5.4 64.4 B C D E F G A Z Y B/CDOUBLECOMBI12GC/OSUSHI 12' CMS SALADS H H H H DELI CHEESEDISPLAY TC TC R CARVING HOT PICKUP 34"AFF SOUP MTO SALADS PREPARED SPECIALTY SALADSORDER F R R H R N H H H H R H 20'CHEESE DISPLAY GREENSDISPLAY 38x26x42UTILITY CART RR RR BAGGED ICE CHESTDELLFRIOEFE-5052HOBART OV500G2-EE HOBARTPW2E-41 TRUET-49-HCTRUET-23F-HCINTERMETROC535-HFC-U-GYBACE, LLCV63-HDLP HONHC1872HONHC1872HONHC1872HONHC1872 ATLANTIC FOOD BARSHHDD5136-TFM HONHC1872 HONHC1872 WRAPPING BOARD WRAPPING BOARDWRAPPING BOARD 48x18x60 L48x18x60 L48x18x60 L24x18x60 L WRAPPING BOARD UP UP MEAT & SEAFOOD COOLER MEAT & SEAFOOD PREP OFFICE WOMEN'S R.R. MEN'S R.R. ENTRY/EXIT VESTIBULE FRONT END CHECKOUT AREA FLORAL SALES PRODUCE SALES MEAT SERVICE AISLE BAKERY SERVICE AISLE DAIRY SALES FROZEN SALES GROCERY SALES BEER AND WINE SALES BULK/COFFEE/CANDY SALES DELI PREP RECEIVING BOH CORRIDOOR FLORAL COOLER FLORAL PREP PRODUCE COOLER PRODUCE PREP KITCHEN COLD COOKED PREP COLD COOKED COOLER SCULLERY FIRE RISER BAKERY PREP BAKERY COOLER DAIRY COOLER BREAK ROOM RESTROOM RESTROOM WELLNESS ROOM BULK COOLER ICE CREAM FREEZER BAKERY DELI GROCERY FREEZER MEAT & SEAFOOD FREEZER ELECTRICAL ROOM RESTROOM COORIDOR ETR RTU-2 ETR RTU-1 ETR RTU-3SS H S S S S SS ETR DF-1 ETR DF-1 ETR DF-1 ETR DF-1 ETR DF-1 ETR DF-1 ETR DF-1 ETR DF-1 ETR DF-1 H S 4 54.4 Z Y ETR EF-9 ETR EF-8 ETR LOUVER B B/CDOUBLECOMBI12GC/OPRODUCE PREP KITCHEN COLD COOKED PREP H S 5.4 6 SHEET NO. This drawing was prepared for use on a specific site contemporaneously with its issue date and it is not suitable for use on a different project site or at a later time. Use of this drawing for reference or example on another project requires the services of properly licensed architects and engineers. Reproduction of this drawing for reuse on another project is not authorized and may be contrary to the law. BRR Original printed on recycled paper COPYRIGHT NOTICE PROJECT NO. SHEET TITLE ISSUES & REVISIONS DRAWN BY: PROFESSIONAL SEAL PROJECT MANAGER: DOCUMENT DATE: CHECKED BY: PROJECT NAME PROJECT ADDRESS 1 2 3 4 5 ABCDEABCDE12 3 4 5 8131 METCALF AVENUE SUITE 300 OVERLAND PARK, KS 66204 www.brrarch.com TEL: 913-262-9095 FAX: 913-262-9044 ARCHITECT OF RECORD: 62930563 12/07/2021 THE FRESH MARKET The Centre Retail Center NO. DATE DESCRIPTION An Erdman Anthony Company 552 Fort Evans RD STE 200 Leesburg, VA 20176 703.777.5988 Leesburg@erdmananthony.com 116th St. and Rangeline Rd. Carmel, Indiana MECHANICAL PLAN M201 1 Coordinate sales area ductwork with lights, verify in field. Duct mounting heights noted on plan, where necessary adjust to miss storm piping. Ductwork shall be exposed. Ductwork shall be provided with a paint grip finish and shall be painted in field by GC, coordinate with architect. All factory taps and branches shall be factory continuously welded, see specifications. 2 Duct smoke detector in supply and return duct to shut down the unit in the event of fire. Smoke detectors and remote indicating/test/reset stations provided by fire alarm contractor. Smoke detectors installed in duct by MC. 3 Connect MetalFab PIC (1" air insulated) 10" duct to collar at bakery oven hood, transition to 12" after connection at oven collar, run 12"Ø up to exhaust fan on roof. Maintain 6" clearance from duct to combustibles. All work related to the bakery oven shall be performed under the direct supervision of the oven manufacturer. See Kitchen Exhaust System Notes on sheet M-101 and details on sheet M-401 for additional information. 4 Terminate duct open with hardware screen. 5 High wall ductless split system. Coordinate exact location and mounting height with architect prior to installation. See plumbing drawings for condensate information. 6 PVC flue and combustion air pipes serving sealed combustion gas water heater. Follow manufacturer's requirements for pipe sizing after exact lengths and quantity of elbows are determined in field. Slope horizontal offsets to drain back to water heater. Terminate at mfr's concentric vent kit 7 Coordinate air door installation with overhead door. Verify prior to ordering equipment and report problems to engineer. 8 See M-500 sheets for additional hood and exhaust duct sizes and details. 9 Coordinate with refrigeration contractor prior to installation to confirm location and height of ducts in relation to refrigerant piping. 10 Do not run ducts or pipes or flues over electric panels or roof hatch. 11 Zone sensor wired back to building EMS system, see sheet RC-101 for additional information. Coordinate exact location and mounting height with architect prior to installation. 12 Kitchen exhaust fan, installed level on roof curb. Fan termination shall be minimum 42" above roof. Outdoor air intakes shall be 10'-0" away horizontal or 3'-0" below exhaust terminations. 13 Employee restroom exhaust fan, installed level on curb. termination shall be min. 10'-0" from all OA intakes, see sheet M-301 for additional information. 14 Customer restroom ceiling exhaust fan, hung from structure above with isolation hangers. Route exhaust ducts to existing relief cap on roof, see sheet M-301 for additional information. 15 Existing motor room fans on roof. Verify exact location, operation, and condition in the field and report problems to engineer. 16 Existing motor room intake louver. Verify exact location and size in field and report problems to engineer. 17 Door shall be undercut for return air. 18 Existing gas infrared heater with flues to the roof. Verify condition and operation in the field and report problems to engineer. 19 Existing destratification fan to remain. Verify exact locations, operation, and condition in the field and report problems to engineer. 20 Existing destratification fan to be removed. 21 ETR electric heater for freeze protection. Verify condition and operation in the field and report problems to engineer. 22 Dishwasher duct shall be stainless steel, sealed water tight, and sloped back to the hood collars at a minimum slope of an 18" per foot. 23 See "Kitchen Exhaust Notes" on Sheet M101 for grease duct specifications. 12/08/2021 Digitally signed by Justin Litz 02/07/22