Loading...
HomeMy WebLinkAboutP602_Plumbing Schedules - Sheet 2SHEET NO. This drawing was prepared for use on a specific site contemporaneously with its issue date and it is not suitable for use on a different project site or at a later time. Use of this drawing for reference or example on another project requires the services of properly licensed architects and engineers. Reproduction of this drawing for reuse on another project is not authorized and may be contrary to the law. BRR Original printed on recycled paper COPYRIGHT NOTICE PROJECT NO. SHEET TITLE ISSUES & REVISIONS DRAWN BY: PROFESSIONAL SEAL PROJECT MANAGER: DOCUMENT DATE: CHECKED BY: PROJECT NAME PROJECT ADDRESS 1 2 3 4 5 ABCDEABCDE12 3 4 5 8131 METCALF AVENUE SUITE 300 OVERLAND PARK, KS 66204 www.brrarch.com TEL: 913-262-9095 FAX: 913-262-9044 ARCHITECT OF RECORD: 62930563 12/07/2021 THE FRESH MARKET The Centre Retail Center NO. DATE DESCRIPTION An Erdman Anthony Company 552 Fort Evans RD STE 200 Leesburg, VA 20176 703.777.5988 Leesburg@erdmananthony.com 116th St. and Rangeline Rd. Carmel, Indiana PLUMBING SCHEDULES SHEET 2 P602 MEA JTL Item: RIC TFM TFM/ REM TFM/ RCM LL GC MC EC PC Comments New medium temperature remote header installed in Motor Room. EPR valves factory installed at the header New Mechanical Rooftop Units F I P 4 New Manufactured Walk-in Coolers and Enclosed Refrigeration Prep Rooms F/I 5 New Walk-in cooler and Refrigerated Prep Room Evaporators I/P F 1,3 New Refrigerated Cases I/P F 1,3 Condensate waste piping for the following to hub drains installed by the PC: Walk-in Cooler and Refrigerated Prep Room evaporators F/I/P 3,6 Refrigerated Cases F/I/P 3,7 Power Wiring for: Rooftop units F/I/TL Walk-in Coolers and Refrigerated Prep Room evaporators F/I/TL Refrigerated Cases, Door Strobes, Leake Strobes, and LLSVs TL F/I Underground Refrigeration Trenching, Pull Boxes, and Riser Pits F/I F/I 9 Drywall/Plywood Wall Pipe Chases and Enclosures for Refrigerated Piping F/I 8 Piping sleeves in walls for Refrigeration Piping F I 2 Cold Prep Equipment F/I 5 Power for Cold Prep Equipment F/I/TL Water, Gas, Drains for Cold Prep Equipment F/I/P Cold Prep 2 Equipment F/I 5 Power for Cold Prep Equipment F/I/TL Water, Gas, Drains for Cold Prep Equipment F/I/P COMMENTS: LEGEND 1. Direct Expansion Refrigeration Piping TFM The Fresh Market, Inc. 2. RIC to provide sheet metalsleeves for all load bearing wall penetrations.RIC Refrigeration Installation Contractor 3. Refrigeration Piping - RIC; Water Piping - PC REM Refrigeration Equipment Manufacturer 4. RTUs provided and installed in this rennovation do not have heat reclaim coils.RCM Refrigeration Case Manufacturer 5. TFM shall have separate installation contractor from RIC for equipment installation.GC General Contractor 6. All piping to be copper and insulated as specified.MC Mechanical Contractor 7. All piping to be PVC Schedule 40.EC Electrical Contractor 8. Provide 2x2 access hatch to all chases without specified access.PC Plumbing Contractor 9. GC to F/I pull boxes and riser pits, PC to F/I PVC trench pipes.LL Landlord F Furnish I Install P Piping Installation and Connections TL Termination of Line Conductors 12/08/2021 Digitally signed by Justin Litz 02/07/22