HomeMy WebLinkAboutP602_Plumbing Schedules - Sheet 2SHEET NO.
This drawing was prepared for use on a
specific site contemporaneously with its issue
date and it is not suitable for use on a
different project site or at a later time. Use of
this drawing for reference or example on
another project requires the services of
properly licensed architects and engineers.
Reproduction of this drawing for reuse on
another project is not authorized and may be
contrary to the law.
BRR Original printed on recycled paper
COPYRIGHT NOTICE
PROJECT NO.
SHEET TITLE
ISSUES & REVISIONS
DRAWN BY:
PROFESSIONAL SEAL
PROJECT MANAGER:
DOCUMENT DATE:
CHECKED BY:
PROJECT NAME
PROJECT ADDRESS
1 2 3 4 5 ABCDEABCDE12 3 4 5
8131 METCALF AVENUE
SUITE 300
OVERLAND PARK, KS 66204
www.brrarch.com
TEL: 913-262-9095
FAX: 913-262-9044
ARCHITECT OF RECORD:
62930563
12/07/2021
THE FRESH
MARKET
The Centre Retail Center
NO. DATE DESCRIPTION
An Erdman Anthony Company
552 Fort Evans RD STE 200
Leesburg, VA 20176
703.777.5988
Leesburg@erdmananthony.com
116th St. and Rangeline Rd.
Carmel, Indiana
PLUMBING
SCHEDULES
SHEET 2
P602
MEA
JTL
Item: RIC TFM TFM/
REM
TFM/
RCM LL GC MC EC PC Comments
New medium temperature remote header installed in Motor Room. EPR valves factory installed at the header
New Mechanical Rooftop Units F I P 4
New Manufactured Walk-in Coolers and Enclosed Refrigeration Prep Rooms F/I 5
New Walk-in cooler and Refrigerated Prep Room Evaporators I/P F 1,3
New Refrigerated Cases I/P F 1,3
Condensate waste piping for the following to hub drains installed by the PC:
Walk-in Cooler and Refrigerated Prep Room evaporators F/I/P 3,6
Refrigerated Cases F/I/P 3,7
Power Wiring for:
Rooftop units F/I/TL
Walk-in Coolers and Refrigerated Prep Room evaporators F/I/TL
Refrigerated Cases, Door Strobes, Leake Strobes, and LLSVs TL F/I
Underground Refrigeration Trenching, Pull Boxes, and Riser Pits F/I F/I 9
Drywall/Plywood Wall Pipe Chases and Enclosures for Refrigerated Piping F/I 8
Piping sleeves in walls for Refrigeration Piping F I 2
Cold Prep Equipment F/I 5
Power for Cold Prep Equipment F/I/TL
Water, Gas, Drains for Cold Prep Equipment F/I/P
Cold Prep 2 Equipment F/I 5
Power for Cold Prep Equipment F/I/TL
Water, Gas, Drains for Cold Prep Equipment F/I/P
COMMENTS:
LEGEND
1. Direct Expansion Refrigeration Piping TFM The Fresh Market, Inc.
2. RIC to provide sheet metalsleeves for all load bearing wall penetrations.RIC Refrigeration Installation Contractor
3. Refrigeration Piping - RIC; Water Piping - PC REM
Refrigeration Equipment Manufacturer
4. RTUs provided and installed in this rennovation do not have heat reclaim coils.RCM
Refrigeration Case Manufacturer
5. TFM shall have separate installation contractor from RIC for equipment installation.GC General Contractor
6. All piping to be copper and insulated as specified.MC Mechanical Contractor
7. All piping to be PVC Schedule 40.EC Electrical Contractor
8. Provide 2x2 access hatch to all chases without specified access.PC Plumbing Contractor
9. GC to F/I pull boxes and riser pits, PC to F/I PVC trench pipes.LL Landlord
F Furnish
I Install
P Piping Installation and Connections
TL Termination of Line Conductors
12/08/2021