Loading...
HomeMy WebLinkAboutC902 STORMWATER POLLUTION & PREVENTION DETAILS8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 10-25-2021 ISSUE FOR PERMIT DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:314-920 DEC. 08, 2021 DRAFT21 FA WILHELM CITY OF CARMEL CIVIC SQUARE PUBLIC PARKING GARAGE 50 RED TRUCK ROAD CARMEL, INDIANA 46032 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com STORMWATER POLLUTION & PREVENTION DETAILSC902 BEB ACH1" = 20'21DETAIL 902 - TEMPORARY CONSTRUCTION ENTRANCEDETAIL 907 - SILT FENCEINSTALLATION DETAILDETAIL 904 - EROSION CONTROL INLET PROTECTIONFOR CURB INLET AND CATCH BASINSDETAIL 901 - NON-PAVED AREA CATCHBASIN INLET PROTECTION DETAILPLANSECTION B-BNOT TO SCALEDETAIL 906 - CONCRETE WASHOUT BMPDETAIL 905 - BELOW GRATE INLET PROTECTIONDETAIL 903 - FILTER SOCKPERMANENT SEEDING DATESLAWNS AND HIGH MAINTENANCE AREASSTEEP BANKS AND CUTSLEVEL AND SLOPING, OPEN AREASTEMPORARY SEEDINGPERMANENT SEEDINGTEMPORARY SEEDING DATES12/08/2021