HomeMy WebLinkAboutCOMcheck Signed GREAT GROWINSCOMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area:
Construction Site:
421 S Rangeline Rd
Carmel, IN 46032
Building Area
1-Office : Nonresidential
Envelope Assemblies
Assembly
90.1 (2007) Standard
Great Growin's
Carmel, Indiana
5a
Addition
32%
Owner/Agent:
Stephanie Miller
Great Growin's
421 S. Rangeline Rd
Carmel, IN 46032
317-709-7255
steph@greatgrowins.com
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Office]
Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 1 - Office]
Window 1: Vinyl/Fiberglass Frame, Perf. Specs.: Product ID Pella,
SHGC 0.18, [Bldg. Use 1 - Office] (b)
Door 1: Glass (> 50% glazing): Nonmetal Frame, Entrance Door, Perf
Specs.: Product ID Pella, SHGC 0.20, [Bldg. Use 1 - Office] (b)
Floor 1: Slab -On -Grade: Unheated, Vertical 2 ft., [Bldg. Use 1 -
Office] (c)
Designer/Contractor:
Stuart Sande
SRS Architects, Inc
13245 Allisonville
Fishers, IN 46032
317-218-6307
sshade@mitschdesign.com
Floor Area
279
Gross Area Cavity Cont. Proposed Budget U-
or R-Value R-Value U-Factor Factor(.)
Perimeter
279 30.0
416 19.0
90 -
42 ---
52 ---
0.0
0.0
0.0
0.034 0.027
0.067 0.064
0.290 0.350
0.290 0.350
0.730 0.730
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c) Slab -On -Grade proposed and budget U-factors shown in table are F-factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in Wis dDcument is consistent with the building plans,
specifications, and other calculations submitted with this permit a n he proposed envelope systems have been
designed to meet the 90.1 (2007) Standard requirements in CO r ion 4.1.1.0 and to comply with any applicable
man atory requirements listed in the Inspection Checklist.
LJ't nnigry �� c4 2f
Nam -TitleHZA111_ Signatu Dat
5`, �\STegF
No.
ARQQ034184 1k
'. STATE OF
Project Title: GreateAr"
Data filename: U:\A Arc
Report date: 10/08/21
1\2117 Great Growin's Remodel\State\COMcheck.cck Page 1 of 12
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture ProjectsQ021\2117_Great Growin's Remodel\State\COMcheck.cck Page 2 of 12
n�(
COMcheck Software Version 4.1.1.0
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Construction Site:
421 S Rangeline Rd
Carmel, IN 46032
Allowed Exterior Lighting Power
A
Area/Surface Category
90.1 (2007) Standard
Great Growin's
Addition
Owner/Ayeiii:
Stephanie Miller
Great Growin's
421 S. Rangeline Rd
Carmel, IN 46032
317-709-7255
steph@greatgrowins.com
B
Quantity
Designer/Contractor:
Stuart Sande
SRS Architects, Inc
13245 Allisonville
Fishers, IN 46032
317-218-6307
sshade@mitschdesign.com
C D E
Allowed Tradable Allowed Watts
Watts / Unit Wattage (B X C)
Illuminated area'of wall or surface 2760 ft2 0.2 No 552
Total Tradable Watts (a) = 0
Total Allowed Watts = 552
Total Allowed Supplemental Watts (b) = 28
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 28 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixtures Watt.
Illuminated area of wall 2760 ft2 : Non -tradable Watta le
LED 2: LED PAR 16W:
LED 4: LED A Lamp 12W:
LED 2: LED PAR 16W:
1 10 16
1 2 12
1 2 80
Total Tradable Proposed Watts =
160
24
160
0
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting designkreprpseis document is consistent with the building plans,
specifications, and other calculations submitted with this permproposed exterior lighting systems have been
designed to meet the 90.1 (2007) Standard requirements in C.1.1.0 and to comply with any applicable
man atory requirements listed in the Inspection Checklist.
.
/VA 5 Az
Na e - Title Signature Data(
,`��1tnrrarupri
�p.F.....R:.SHAp''�.
.....
G
No. z
y ; AR00034184
STATE OF i S'
/NDIAIA
Project Title: Great Growin's rrrrriii,��r�ti��Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Remodel\State\COMcheck.cck Page 4 of 12
n�(
COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Construction Site:
421 S Rangeline Rd
Carmel, IN 46032
Allowed Interior Lighting Power
90.1 (2007) Standard
Great Growin's
Addition
Owner/Agent:
Stephanie Miller
Great Growin's
421 S. Rangeline Rd
Carmel, IN 46032
317-709-7255
steph@greatgrowins.com
A
Area Category
1-Common Space Types:Office - Open Plan
Proposed Interior Lighting Power
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
1-Common Space Types:Offi0a - Open Plan
LED 2: LED PAR 16W:
LED 6: LED Linear 33W:
Designer/Contractor:
Stuart Sande
SRS Architects, Inc
13245 Allisonville
Fishers, IN 46032
317-218-6307
sshade@mitschdesign.com
B C D
Floor Area Allowed Allowed Watts
(ft2) Watts / ft2 (B X C)
279 1.10 307
Total Allowed Watts = 307
B C D E
Lamps/ # of Fixture (C X D)
Fixture Fixtures Watt.
12 16 192
8 1 8
Total Proposed Watts = 200
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design re re
d i his document is consistent with the building plans,
specifications, and other calculations submitted with this permi a
atio . The proposed interior lighting systems have been
designed to meet the 90.1 (2007) Standard requirements in C r
ck rsion 4.1.1.0 and to comply with any applicable
mand tory requirements listed in the Inspection Checklist.
Name Title Signature
Date
6,eeeunrrrrpr
ti111%PR.... R:.Sygp''%
CO
r
r+•Q
• AR00034184 i
-� ti STATE OF 4
d
�NDIAJ
qR,
uHr`T►Gs``���
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Rem odel\State\COMcheck. cck Page 3 of 12
COMcheck Software Version 4.1.1.0
Inspection Checklist
Energy Code: 90.1 (2007) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
Ix Reg.lD
4.2.2
[PR1]1
4.2.2
[PR4]1
Plan Review I Complies?
Comments/Assumptions
,Plans and/or specifications provide all
;❑Complies Requirement will be met.
information with which compliance
T]Does Not
can be determined for the building
E❑Not Observable
envelope and document where
exceptions to the standard are
:❑Not Applicable
;claimed.
Plans, specifications, and/or
;❑Complies :Requirement will be met.
:calculations provide all information
:❑Does Not
;with which compliance can be
;❑Not Observable
i determined for the lighting and
electrical systems and equipment and
❑Not Applicable ;
document where exceptions to the
standard are claimed. Information
j provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
8.4.1.1, Plans, specifications, and/or
8.4.1.2 calculations provide all information
[PR6]2 with which compliance can be
determined for the electrical systems
and equipment and document where
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
Additional Comments/Assumptions:
;❑Complies :Requirement will be met.
❑Does Not
'[:]Not Observable
❑Not Applicable
1
1 1 High Impact (Tier 1) 7 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Remodel\state\COMcheck. cck Page 5 of 12
Footing / Foundation
& Req.ID Inspection
5.5.3.3 Below -grade wall insulation R-
[FO1]1 ;value.
Plans Verified Field Verified Complies? Comments/Assumptions
Value Value
R- R- ElComplies See the Envelope Assemblies
❑Does Not ;table for values.
5.5.3.5 ;Slab edge insulation R-value. R-
[F03]1 ❑ Unheated
❑ Heated
5.8.1.2 ;Slab edge insulation installed per
[F04]1 Imanufacturer's instructions.
5.5.3.5 Slab edge insulation ft
[F05]1 depth/length.
5.8.1.7.3 Insulation in contact with the
[F07]1 ground has <=0.3% water
absorption rate per ASTM C272.
Additional Comments/Assumptions:
R-
❑ Unheate
❑ Heated
ft
❑Not Observable
❑Not Applicable
❑Complies See the Envelope Assemblies
d ❑Does Not ; table for values.
❑Nat Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
t❑Complies ;See the Envelope Assemblies
❑Does Not :table for values.
❑Not Observable
❑Not Applicable
❑Complies I Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
1 High Impact (Tier 1) 2 � Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Remodel\State\COMcheck.cck Page 6 of 12
& Req.ID
5.4.3.2
[FRl]3
Framing i Rough -In Inspection plans Verified Field Verified
Value Value
Comments/Assumptions
Factory -built fenestration and Fenestration_ Fenestration_ °s❑Complies ; Requirement will be met.
doors are labeled as meeting air _ cfm/ftz _ cfm/ftz ❑Does Not
leakage requirements. Doors Doors
cfm/ftz cfm/ftz ![:]Not Observable
'❑Not Applicable
5.5.4.3a ;Vertical fenestration U-Factor. ; U-
[FR8]1 —
5.5.4.3b Skylight fenestration U-Factor. U-_
[FR9]1
;
;
5.5.4.4.1 ;Vertical fenestration SHGC value. SHGC:
[FR10]1
5.5.4.4.2 Skylight SHGC value. SHGC:
[FRll]1
5.8.2.1, Fenestration products rated in
5.8.2.4 accordance with NFRC.
[FR12]z
Fenestration products are
certified as to performance labels
or certificates provided.
U- ;❑Complies ;See the Envelope Assemblies
❑Does Not table for values.
;❑Not Observable
❑Not Applicable
U- ;❑Complies See the Envelope Assemblies
r❑Does Not table for values.
;❑Not Observable
e❑Not Applicable
SHGC: ;❑Complies :See the Envelope Assemblies
°❑Does Not ;table for values.
;
'❑Not Observable '
❑Not Applicable
SHGC: ;❑Complies ;See the Envelope Assemblies
❑Does Not ; table for values.
;❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
[]Not Observable
❑Not Applicable
5.8.2.3, U factor of opaque doors U- U- �;❑Complies ;See the Envelope Assemblies
5.5.3.6 associated with the building ❑ Swinging ❑ Swinging ;❑Does Not table for values.
[FR14]2 thermal envelope meets ❑ Nonswinging ❑ Nonswinging ❑Not Observable
requirements.
❑Not Applicable
Additional Comments/Assumptions:
1 [ High Impact (Tier 1) 2 j Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Remodel\State\COMcheck.cck Page 7 of 12
Section
#
Rough -In Electrical Inspection
Complies? CommentslAssumptions
& Req.ID
9.4.1.1
Automatic controls to shut off all
❑Complies Requirement will be met.
[EL1]2
building lighting installed in buildings
'❑Does Not
>5,000 ft2.
❑Not Observable
❑Not Applicable
9.4,1,2
Independent lighting controls installed
.❑Complies Requirement will be met.
[EL2]2
per approved lighting plans and all
❑Does Not
manual controls readily accessible and
❑Not Observable;
visible to occupants.
❑Not Applicable
9.4.1.3
Automatic lighting controls for exterior ❑Complies Requirement will be met,
[EL3]2
lighting installed.
❑Does Not
❑Not Observable:
❑Not Applicable
9.4.1.4
Separate lighting control devices for
❑Complies lRequirement will be met.
[EL4]1
specific uses installed per approved
=❑Does Not
lighting plans.
I❑Not Observable
❑Not Applicable
9.4.2
Ballasted one and three lamp fixtures
`❑Complies ;Requirement will be met. Y
[EL5]3
with >30 W/lamp have two lamp
'❑Does Not
tandem wired ballasts when >=2
❑Not Observable;
fixtures in same space on same
❑Not Applicable
control.
9.4.3
Exit signs do not exceed 5 watts per
;❑Complies Requirement will be met.
[EL6]1
;face.
❑Does Not
❑Not Observable I
❑Not Applicable
9.4.4
Exterior grounds lighting over 100 W
i❑Complies ;Requirement will be met.
[EL7]1
:provides >60 Im/W unless on motion
j❑Does Not
sensor or fixture is exempt from scope;
of code or from external LPD.
❑Not Observable
❑Not Applicable
9.6.2
Additional interior lighting power
❑Complies ; Requirement will be met.
[EL8]1
allowed for special functions per the
❑Does Not
,approved lighting plans and is
,automatically controlled and
❑Not Observable;
'❑Not Applicable
separated from general lighting.
Additional Comments/Assumptions:
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Rem ode l\State\COM check. cck Page 8 of 12
5.4.3.1
[IN1]1
5.5.3.1
[IN2]1
5.8.1.2,
5.8.1.3
[IN3]1
5.5.3.1.1
[IN5]3
ns
Insulation inspection l Pia Valuefied Field luefied i Complies? Comments/Assumptions
;All sources of air leakage in the
building thermal envelope are
;sealed, caulked, gasketed,
,weather stripped or wrapped with
moisture vapor -permeable
;wrapping material to minimize air
leakage.
Roof R-value. For some ceiling R-
systems, verification may need to: ❑ Above deck
occur during Framing Inspection. ; ❑ Metal
❑ Attic
1 ;
I
I I
1
Roof insulation installed per
manufacturer's instructions.
Blown or poured loose -fill
insulation is installed only where
the ceiling slope is <= 3:12.
High-albedo roofs meet solar SR.
reflectance of 0.70 and thermal SRI:
emittance of 0.75 or SRI of 82.
5.5.3.2 ;Above -grade wall insulation R- R-
[IN6]1
:value.
❑ Mass
❑ Metal
❑ Steel
I ❑ Wood
I
5.8.1.2
;Above -grade wall insulation
[IN7]1
:installed per manufacturer's
instructions.
I
5.5.3.4
Floor insulation R-value.
R-
[IN8]1
❑ Mass
❑ Steel
❑ Wood
5.8.1.1 Building envelope insulation is
[IN10]z labeled with R-value or insulation
certificate providing R-value and
other relevant data.
5.8.1.4 Eaves are baffled to deflect air to E
[IN11]2 above the insulation.
5.8.1.5 Insulation is installed in
[IN12]2 substantial contact with the
inside surface separating
conditioned space from
unconditional space.
5.8.1.6 Recessed equipment installed in
[IN13]2 building envelope assemblies
does not compress the adjacent
insulation.
❑Complies :Requirement will be met.
❑Does Not
❑Not Observable '
❑Not Applicable
R-
;❑Complies ;See the Envelope Assemblies
❑ Above deck
;❑Does Not ;table for values.
1
❑ Metal
;❑Not Observable
❑ Attic
;❑Not Applicable
-
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
5R:
;❑Complies Requirement will be met.
SRI:
'❑Does Not
'❑Not Observable
❑Not Applicable
R-
;❑Complies ;See the Envelope Assemblies
❑ Mass
;❑Does Not ;table for values.
❑ Metal
;❑Not Observable I
❑ Steel
:❑Not Applicable
❑ Wood
❑Complies ;Requirement will be met.
❑Does Not
❑Not Observable ;
❑Not Applicable
R-
;❑Complies ;See the Envelope Assemblies
❑ Mass
'❑Does Not ;table for values.
❑ Steel
;"Not Observable '
❑ Wood
❑Not Applicable
I
I I
I 1
❑Complies ; Requirement will be met.
❑Does Not
❑Not Observable ;
❑Not Applicable
_
❑Complies I Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
^�❑Complies
;Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies :Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
`1 lHigh Impact (Tier 1)2� Medium Impact (Tier 2) _ 3 Low Impact (Tier 3)
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Remodel\State\COMcheck. cck Page 9 of 12
Section
#
Insulation Inspection
& Rec;.ID
_�
5.8.1.7
Exterior insulation is protected
[IN14]2
from damage with a protective
material. Verification for exposed ,
foundation insulation may need
to occur during Foundation
Inspection.
5.8.1.7.1
Attics and mechanical rooms
[IN15]2
have insulation protected where
adjacent to attic or equipment
access.
5.8.1.7.2 Foundation vents do not interfere
[IN16]2 with insulation.
5.8.1.8 Insulation intended to meet the
[IN17]3 roof insulation requirements
cannot be installed on top of a
suspended ceiling. Mark this
requirement compliant if
insulation is installed according
Additional Comments/Assumptions:
Plans Verified Field Verified
Value Value
LComplies? —Comments/Assumptions
❑Complies
Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies
Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
—❑Complies
Requirement will be met
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies _
Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
1 High Impact (Tier 1) L2J Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Remodel\State\COMcheck.cck Page 10 of 12
section
5.4.3.3
[Fill'
8.7.1
[F11613
8.7.2
[F11713
Final Inspection I Complies?
CommentslAss umptions
Meatherseals installed on all loading
;❑Complies ;Requirement will be met.
:dock cargo doors in Climate Zones 4-
'❑Does Not
8•
;❑Not Observable;
❑Not Applicable
Furnished as -built drawings for
;❑Complies Requirement will be met.
,electric power systems within 30 days
:❑Does Not
:of system acceptance.
; ❑Not Observable
❑Not Applicable
Furnished O&M instructions for
;❑Complies Requirement will be met.
,systems and equipment to the
;❑Does Not
building owner or designated
:❑Not Observable
,representative.
;❑Not Applicable
9.2.2.3 ;Interior installed lamp and fixture
;❑Complies ;See the Interior Lighting fixture schedule for values.
[F1181' :lighting power is consistent with what
:❑Does Not
is shown on the approved lighting
Observable
plans, demonstrating proposed watts
are less than or equal to allowed
;❑Not
❑Not Applicable
watts.
9.4.5 ; Exterior lighting power is consistent
;❑Complies ;See the Exterior Lighting fixture schedule for values.
[F1191' with what is shown on the approved
T❑Does Not
lighting plans, demonstrating
;proposed watts are less than or equal
;❑Not Observable::
to allowed watts.
;❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117—Great Growin's Remodel\State\COMcheck.cck Page 11 of 12
Project Title: Great Growin's Report date: 10/08/21
Data filename: U:\A Architecture Projects\2021\2117_Great Growin's Rem odel\State\COMcheck. cck Page 12 of 12