HomeMy WebLinkAboutC200THE DEPARTMENT OF PUBLIC UTILITIES FOR
THE CITY OF INDIANAPOLIS (LANDLORD)
PER INSTR. #2011041273 (PARENT PARCEL)
CARMEL-CLAY PARKS & RECREATION BOARD (TENANT)WWWW
WWWWW WWWWWWWWWWWWOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUO
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
OHU
WWWWW WWWW
WWWWWWWWW
W
W
W
W
W WWG
G
G
G
G
G
G
G
G
G
W W W W W W W
N03°17'00"E (R)N86°06'46"W (R)
N83°17'07"W (
R
)
N06°14'00"E (R)N29°14'00"E (R)P.L. CONT.P.L. CONT.WWWWWWWWW DDDDDDDD
D
DDDDD
D
D
D DD
D
D
D
D D
DDDDDD
DDDDDDDDDDD
D
D
D DDDDDDDDDDDDDDDDDDDDDDDDDD
DDDC200LAYOUT PLAN10 9abcd 8 7 6efgh109876 REVISIONS AND ISSUES5 4 3 2 1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netfhAPPROVAL PENDING NOT FORCONSTRUCTIONKnow what's below.
before you dig.Call
R gSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW200365CLAY TOWNSHIP/CARMEL-CLAY BOARD OF PARKS AND RECREATIONAQW20036508/31/2020MKMKRIVER HERITAGE PARK PHASE IIMPROVEMENTSREVISIONS PER CITY COMMENTS06/28/20211AQW
S
N
E
THE HORIZONTAL AND VERTICAL LOCATION DATA
SHOWN ON THIS SURVEY ARE BASED UPON
POSITIONAL SOLUTIONS DERIVED FROM REAL-TIME
KINEMATIC (RTK) GLOBAL POSITIONING SYSTEM
(GPS) OBSERVATIONS PROCESSED BY THE INDIANA
DEPARTMENT OF TRANSPORTATION (INDOT)
CONTINUOUSLY OPERATING REFERENCE STATIONS
(CORS) (HTTP://INCORS.IN.GOV). THE BEARINGS
SHOWN ARE DERIVED FROM COORDINATES BASED
ON THE INDIANA STATE PLANE COORDINATE
SYSTEM (EAST ZONE) NAD 83 (2011) EPOCH 2010.0).
THE VERTICAL DATUM IS BASED UPON NAVD 88.
SITE PLAN:
1.THE CONTRACTOR(S) SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ELEVATIONS AND DIMENSIONS THROUGHOUT THE CONSTRUCTION SCHEDULE. IF ANY
DISCREPANCIES ARE FOUND TO EXIST BETWEEN THE CONSTRUCTION DOCUMENTS AND ACTUAL FIELD CONDITIONS, THE
CONTRACTOR(S) MUST CONTACT THE PROJECT MANAGER IMMEDIATELY FOR INSTRUCTION BEFORE PROCEEDING.
2.ALL RADII INDICATED SHALL BE FORMED AS CIRCULAR ARCS. SITE CONTRACTOR(S) SHALL MATCH EXISTING GRADE AND ALIGNMENT OF
CURBS WHERE NEW CONSTRUCTION ABUTS EXISTING SITE CONDITIONS.
3.SITE CONTRACTOR(S) MUST PROVIDE AT THE CONTRACTOR'S EXPENSE, ALL NECESSARY VEHICULAR AND PEDESTRIAN CONTROL
DEVICES. TEMPORARY VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL DEVICES AND METHODS USED DURING CONSTRUCTION MUST
CONFORM WITH APPLICABLE FEDERAL, STATE, AND LOCAL STANDARDS. CONTRACTOR(S) MUST MEET MINIMAL REQUIREMENTS FOR
EMERGENCY VEHICLE ACCESS ON SITE DURING CONSTRUCTION AS DETERMINED BY LOCAL AND/OR STATE CODES AND REGULATIONS.
4.ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER
SAFETY.
5.EXPANSION JOINTS SHALL BE REQUIRED AT ALL CONDITIONS WHERE CONCRETE PAVEMENT IS DIRECTLY ADJACENT TO PROPOSED
STRUCTURES.
6.ANY EXISTING VEGETATION ON OR ADJACENT TO THE PROJECT SITE THAT ARE DESIGNATED TO REMAIN SHALL BE PROTECTED FROM
ANY AND ALL INJURY RESULTING FROM CONSTRUCTION TECHNIQUES AND/OR VEHICLES ON SITE. CONTRACTOR(S) MUST ESTABLISH A
SUITABLE PERIMETER AROUND EACH SPECIMEN TO ENSURE THAT A PROPER ROOT ZONE IS MAINTAINED. FENCING MATERIAL USED TO
DESIGNATE PLANT PROTECTION AREAS MUST BE CONSPICUOUS AND CLEARLY VISIBLE THROUGHOUT THE CONSTRUCTION SCHEDULE.
EACH PROTECTION AREA SHALL CONTAIN PROPER SIGNAGE NOTIFYING WORKERS OF THE IMPORTANCE OF PREVENTING VEHICULAR
TRAFFIC FROM ENTERING THE PROTECTED ROOT ZONE(S).
7.REMOVE ALL EXISTING TRASH, DEBRIS AND RUBBLE THROUGHOUT THE SITE BEFORE THE COMPLETION OF THE CONSTRUCTION
SEQUENCE. DISPOSAL OF SUCH MATERIAL MUST BE DONE IN ACCORDANCE WITH FEDERAL, STATE, COUNTY AND LOCAL LAWS AND
REGULATIONS. THE CONTRACTOR(S) SHALL BE RESPONSIBLE FOR DAILY INSPECTIONS OF THE PROJECT SITE AND ADJACENT
PROPERTY(S) TO DETECT AND REMOVE ANY MUD, GRAVEL, OR DEBRIS THAT HAVE BEEN TRACKED, DUMPED, SPILLED OR WIND-BLOWN
ONTO AREAS ADJACENT TO PROJECT INCLUDING, BUT NOT LIMITED TO: RIGHTS-OF-WAY, PUBLIC OR PRIVATE STREETS, AND ROADS,
DRIVEWAYS, YARDS AND/OR SIDEWALKS.
8.IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO THE
PHASE OF WORK. IT SHALL ALSO BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES FOR
PROPER STAKE LOCATION FOR EACH UTILITY BEFORE WORK IS STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNER OR
THE ENGINEER OF ANY CHANGES, OMISSIONS, OR ERRORS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR
RESUMED.
9.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL FILL AREAS SHALL BE COMPACTED TO AT LEAST 95
PERCENT OF THE MAXIMUM DRY DENSITY MODIFIED (ASTM D-1557)
10.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ADJUST ALL UTILITY COVERS, LIDS, AND ACCESS PANELS IN SUCH A MANNER
AS TO BE FLUSH WITH THE WALKS AND CARE SHOULD BE TAKEN NOT TO DAMAGE THE UTILITY COVERS, LIDS AND ACCESS PANELS
DURING CONSTRUCTION.
4" CONCRETE PAVING
LEGEND
A
A
B
CB
F
D
E
G
H
H
I
J
L M
A
A
P
B
I
I
G
N
O
R
Q
RAISE EXISTING GRAVEL TRAIL
TO MEET NEW WALK. REMOVE
ALL PERPENDICULAR WOOD TIES
ACROSS EXISTING WALK.
RESTORE PARKING LOT. TOP
DRESS W/ BROWN FILL STONE
(SEE 10/C800)
TREE MITIGATION PRACTICES:
1.) Contractor is responsible for clearly marking the proposed boardwalk and pathway on site
2.) Owner & Landscape Architect shall do a thorough walk through with the contractor and
adjust the pathway accordingly to minimize all tree impacts.
3.) The contractor will be responsible for documenting all tree removal that will include but
not limited to:
a.) DBH
b.) Type/Species
c.) Location
d.) Photos of Health Status
e.) Non-Wetland Forest (at least one acre of disturbance) 2:1 ratio
4.) An area on site will be identified for replacement trees to be located.
5.) Mitigation efforts and location of all replacements shall be thoroughly documented for
future Mitigation Performance that will include all Monitor Reporting outlined in the DNR
Information Bulletin #17 (Fifth Amendment) Page 9 XI.
A
B
C
D
E
F
G
I
J
L
M
K
6" Wide Concrete Flush Curb
No Fault Poured in Place TPV Rubber Safety Surface, Pro-Techs Surfacing, or
approved equal.
Surface to be installed per manufacturer's specifications.
No Fault contact: PlayPros, Shawn Bolinger, (615) 210-4132 shawn@playpros.com
Pro-Techs contact: Midstates Recreation, Amber Berninger,
(317) 796-8210 amberb@midstatesrecreation.com
Concrete Pavement
Park Entry Sign
Contractor to replace shelter with new metal roof. owner provided; Contractor shall
install and coordinate with owner.
Shelter to be Cleaned and Painted
Contractor to match existing color with Benjamin Moore exterior paint.
Rubberway Trail Surfacing
Contact: Karoleen Alexander, Sustainable Surfacing, (877) 288-0045x207,
karoleen@sustainablesurfacing.com
NOTE: All Soil Spoils from 4" subgrade excavation are to be removed from site.
Anova Allure Bench
Owner Provided; Contractor shall install and coordinate with owner
For Alternate #01 pricing contact: PlayPros, Shawn Bolinger,
(615)210-4132 shawn@playpros.com
Pre-Fabricated Boardwalk Sections
Manufacurer by Wickcraft or approved equal.
Owner Provided; Contractor shall install and coordinate with owner
For Alternate #01 pricing contact: Wickcraft, Naomi Bloomer, (608) 496-1082
naomi@wickcraft.com
Playground Equipment
Owner Provided; Contractor shall install and coordinate with owner
For Alternate #01 pricing contact: Midstates Recreation, Amber Berninger,
(317) 796-8210 amberb@midstatesrecreation.com and PlayPros, Shawn Bolinger,
(615) 210-4132 shawn@playpros.com
Not Used
Masonry Columns for Existing Shelter
N
O
P
Bike Racks - Owner Provided; Contractor shall
install and coordinate with owner.
Install owner provided tables (5.) Anova Beacon Hill Tables with
Recycled Plastic slats. Three with four seats, Two with three
seats.
For Alternate #01 pricing contact: PlayPros, Shawn Bolinger,
(615) 210-4132 shawn@playpros.com
Skyways Sail Shade Structure (Center Post)
12' by 16' Owner Provided; Contractor shall install and coordinate with owner
For Alternate #01 pricing contact: PlayPros, Shawn Bolinger, (615) 210-4132
shawn@playpros.com
Concrete End Bent for Boardwalk
1
C800
5
C801
3
C801
4
C801
5
C800
4
C800
H
Skyways Sail Shade Structure (Cantilever Post)
12' by 16' Owner Provided; Contractor shall install and coordinate with owner
For Alternate #01 pricing contact: PlayPros, Shawn Bolinger, (615) 210-4132
shawn@playpros.com
3
C800
2
C800
8
C800
-
C802
-
C803
-
C803
2
C801
1
C801
Q Parking Lot Concrete, ADA ramp, and ADA striping
R ADA signage
13
C800
6
C803
4
C803
5
C803
2
C803
3
C803