HomeMy WebLinkAboutC300O H U O H U O H U O H U O H U WWWWWWWWWWW W W W WG G G G G P.L. CONT. TEMPORARY TOPSOIL STOCKPILE CONCRETE WASHOUT AREA CONSTRUCTION ENTRANCE MODIFY EXISTING SIDEWALK AS REQUIRED. REPAIR TO NEW CONDITION UPON PROJECT COMPLETION. CONSTRUCTION STAGING AREA W/TRASH RECEPTACLE, PORT-O-LET. CONTRACTOR TO VERIFY FINAL LOCATION CONSTRUCTION LIMITS SILT FENCE NPDES POSTING BOX INLET PROTECTION SF SF SF SF SF DDDDDDDD D D DSFSFSFSFSFSFDDDDDDDDDDDDDDD SFSFSFSFSFSFSFSFSFSFSFS F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFDDDDDDDDDDDDD D D D D D D D D D D D D D DDD D DDDDDDDDDDDDDDSFSFSFSFSFSFSFSFSFSFSFSF SF SF DDDDDDDDDDDD D D SF SF SF SFSFSFSFSF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SFSFSFD D D DDDDD D DDDDDDDDDDDDDDDDDDDDDDDDDDDDDD D D DDDDDDDDDDDDDDDDSF SF SF SF SFSFSF SFSF SF SFSF SF SF SF SFD D D D D DD DD D DD D D D DINLET PROTECTION 150' CONSTRUCTION ENTRANCE CONSTRUCTION LIMITS SILT FENCE TREE PROTECTION FENCE TREE PROTECTION FENCE TREE PROTECTION FENCE TREE PROTECTION FENCE 10 9abcd 8 7 6efgh109876 REVISIONS AND ISSUES5 4 3 2 1 PREPARED FOR:PROJECT NO. SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1 ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netfhAPPROVAL PENDING NOT FORCONSTRUCTIONKnow what's below. before you dig.Call R gSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW200365CLAY TOWNSHIP/CARMEL-CLAY BOARD OF PARKS AND RECREATIONAQW20036508/31/2020MKMKRIVER HERITAGE PARK PHASE IIMPROVEMENTSREVISIONS PER CITY COMMENTS06/28/20211AQC300PRE-CON SWPPPW S N E D D S XXX SF SF LEGEND STORMWATER POLLUTION PREVENTION GENERAL NOTES: DEVELOPMENT NOTES 1.THE CONTRACTOR, WHETHER OWNING THE PROPERTY OR ACTING AS THE AGENT OF THE PROPERTY OWNER, SHALL BE RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL REQUIREMENTS ASSOCIATED WITH ACTIVITIES ON SITE. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR MINIMIZING SEDIMENT DISCHARGE AND TRACKING FROM THE SITE THROUGHOUT THE LAND DISTURBING ACTIVITIES UNTIL PERMANENT STABILIZATION HAS BEEN ACHIEVED. 3.CONTRACTOR SHALL CLEAN UP SEDIMENT THAT IS EITHER TRACKED OR WASHED ONTO ROADS. BULK CLEARING OF SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED ON IN A MANNER THAT IS IN COMPLIANCE WITH ALL APPLICABLE STATUES AND RULES. 4.ADJACENT PROPERTY DISTURBED BY CONTRACTOR MUST BE REPAIRED AND STABILIZED WITH TEMPORARY OR PERMANENT SURFACE STABILIZATION. GENERAL NOTES 1.SHEET C300-C301 SHALL SERVE AS A GUIDELINE FOR STORM WATER QUALITY. ADDITIONAL REQUIREMENTS MAY BE MADE IN THE FIELD IF PROVISIONS SHOWN PROVE INADEQUATE IN PREVENTING SOIL EROSION AND/OR STORM WATER POLLUTION. 2.SEE EROSION CONTROL SEQUENCE ON SHEET C300-C303 FOR PRE-CONSTRUCTION THROUGH POST-CONSTRUCTION REQUIREMENTS. 3.SPILL PREVENTION AND CLEAN UP MEASURES SHALL BE IMPLEMENTED FOR THE STORAGE AND HANDLING OF MATERIALS, SUCH AS FUELS OR HAZARDOUS WASTES, TO MINIMIZE THE POTENTIAL FOR POLLUTANTS TO CONTAMINATE SURFACE OR GROUND WATER OR DEGRADE SOIL QUALITY. 4.MATERIALS HANDLING AND STORAGE ASSOCIATED WITH CONSTRUCTION ACTIVITY SHALL MEET THE SPILL PREVENTION AND SPILL RESPONSE REQUIREMENTS OF THE STATE OF INDIANA LAWS GOVERNING REPORTING, CONTAINMENT, AND RESPONSE TO SPILLS OF HAZARDOUS AND/OR OBJECTIONABLE MATERIALS. 5.CONTRACTOR SHALL IMPLEMENT MEASURES TO MINIMIZE OR ELIMINATE WASTES OR UNUSED BUILDING MATERIALS, INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, WASTEWATER, CONCRETE TRUCK WASHOUT, AND OTHER SUBSTANCES FROM BEING CARRIED FROM A PROJECT SITE BY RUN-OFF OR WIND. IDENTIFICATION OF AREAS WHERE CONCRETE TRUCK WASHOUT IS PERMISSIBLE MUST BE CLEARLY POSTED AT APPROPRIATE AREAS OF THE SITE. WASTES AND UNUSED BUILDING MATERIALS SHALL BE MANAGED AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE STATUES AND REGULATIONS. 6.AS GRADING IS DONE, AND STORM SEWERS INSTALLED, INLET PROTECTION, SILT TRAPS, SILT FENCES, TEMPORARY DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE. 7.ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER COMPLETION OF GROUND ACTIVITY. 8.THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON THE WEATHER. IF CONSTRUCTION ACTIVITY IS TO CEASE FOR MORE THAN TEN CALENDAR DAYS, THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED OR MULCHED. 9.PERMANENT AND FINAL VEGETATION SHALL BE INSTALLED AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. 10.FINAL STABILIZATION OF A PROJECT SITE IS CONSIDERED ACHIEVED WHEN ALL LAND DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF SEVENTY PERCENT (70%) HAS BEEN ESTABLISHED ON ALL UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES, OR EQUIVALENT PERMANENT STABILIZATION MEASURES HAVE BEEN EMPLOYED. 11.THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR. 12.ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION CONTROL DEVICES. 13.A TRAINED INDIVIDUAL (AS DEMONSTRATED BY CERTIFICATION OR EXPERIENCE) SHALL PERFORM A WRITTEN EVALUATION OF THE PROJECT SITE BY THE END OF THE NEXT BUSINESS DAY FOLLOWING EACH MEASURABLE STORM EVENT, BUT NOT LESS THAN ONCE A WEEK. 14.THE WRITTEN EVALUATION REPORTS MUST ADDRESS MAINTENANCE OF STORM WATER QUALITY MEASURES, PROBLEMS IDENTIFIED AT THE PROJECT SITE AND CORRECTIVE ACTIONS RECOMMENDED AND COMPLETED TO ENSURE COMPLIANCE. EVALUATION REPORTS MUST BE MADE AVAILABLE TO THE INSPECTING AUTHORITY WITHIN 48 HOURS OF A REQUEST. 15.OFF-SITE SOIL DISPOSAL MUST BE A PART OF THE SWPPP. IT IS THE RESPONSIBILITY OF THE PROJECT SIRE OWNER TO ENSURE THAT OFF-SITE SOIL DISPOSAL AREAS ARE EFFECTIVELY TREATED TO MINIMIZE EROSION AND SEDIMENTATION. 16.ANY PART OF THE REVIEWED SWPPP THAT DEALS DIRECTLY WITH EROSION AND SEDIMENT CONTROL SPECIFICATIONS, RECOMMENDATIONS OR REQUIREMENTS NOT FOUND ON THE PLAN DRAWING SET (SUCH AS THE SWPPP NARRATIVE), MUST BE PROVIDED TO THE ON-SITE PERSON RESPONSIBLE FOR SWPPP COMPLIANCE. IN ADDITION ANY EROSION AND SEDIMENT CONTROL INFORMATION NOT PROVIDED TO THE COUNTY AT THE TIME OF THE SWPPP REVIEW (SUCH AS ADDITIONAL SEQUENCING TIMETABLES, SOIL STOCKPILING LOCATIONS/PROTECTION, SOIL DISPOSAL LOCATIONS, STAGING AREA LOCATIONS, ETC.) MUST BE PROVIDED TO THE COUNTY OFFICE PRIOR TO THE LAND DISTURBING ACTIVITY. 17.THE COUNTY MUST BE NOTIFIED WITHIN 48 HOURS OF ACTUAL CONSTRUCTION START UP ACTIVITIES ON THE SITE. A PHONE CALL OR EMAIL IS ALL THAT IS NECESSARY. THE COUNTY WILL BE CONDUCTING PERIODIC ON-SITE SWPPP COMPLIANCE CHECKS ONCE THE PROJECT STARTS. STORMWATER POLLUTION PREVENTION GENERAL NOTES: 1.EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS 2-4 OF "PRECONSTRUCTION ACTIVITIES" ON THIS SHEET HAVE BEEN COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN. 2.RULE 5 REQUIRES ALL DISTURBED AREAS THAT WILL POTENTIALLY BE IDLE FOR 10 DAYS OR MORE TO BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. 3.ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE REQUIRED IN THE FIELD BY HAMILTON COUNTY 4.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN THE STREETS. 5.APPROXIMATE CONSTRUCTION SCHEDULE: START DATE: APRIL 2021 COMPLETION DATE: DECEMBER 2021 6.LATITUDE: 39.96052 LONGITUDE: -86.05986 7.CONTACT PERSON: MICHAEL KLITZING, DIRECTOR CARMEL/CLAY PARKS & RECREATION 1411 EAST 116TH STREET CARMEL, INDIANA 46032 (317)573-4018 9.WARNING: THIS SHEET TO BE USED FOR STORM WATER POLLUTION PREVENTION PURPOSES ONLY. 10.SEE SHEETS C300-C306 FOR ALL STORM WATER POLLUTION PREVENTION PLAN DETAILS & NOTES 11. SILT FENCE SEE SHEET C300-C301 CONSTRUCTION LIMITS EXISTING CONTOUR EXISTING SANITARY SEWER EXISTING STORM SEWER INLET PROTECTION TREE PROTECTION FENCE SEE SHEET C300-C301 TREE MITIGATION PRACTICES: 1.) Contractor is responsible for clearly marking the proposed boardwalk and pathway on site 2.) Owner & Landscape Architect shall do a thorough walk through with the contractor and adjust the pathway accordingly to minimize all tree impacts. 3.) The contractor will be responsible for documenting all tree removal that will include but not limited to: a.) DBH b.) Type/Species c.) Location d.) Photos of Health Status e.) Non-Wetland Forest (at least one acre of disturbance) 2:1 ratio 4.) An area on site will be identified for replacement trees to be located. 5.) Mitigation efforts and location of all replacements shall be thoroughly documented for future Mitigation Performance that will include all Monitor Reporting outlined in the DNR Information Bulletin #17 (Fifth Amendment) Page 9 XI.