HomeMy WebLinkAboutC303W
W W W W W W W W W W
UPLAND WOODLAND
SEED MIX
UPLAND WOODLAND
SEED MIX
D D D D D D D D
D D D D D
DDDDDDDDDDDDDDDDD
D D D D D D D D
D
D D
D D D
DDDDDDDDDDDDDDDD
DDDDDDDDD10 9abcd 8 7 6efgh109876 REVISIONS AND ISSUES5 4 3 2 1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netfhAPPROVAL PENDING NOT FORCONSTRUCTIONKnow what's below.
before you dig.Call
R gSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW200365CLAY TOWNSHIP/CARMEL-CLAY BOARD OF PARKS AND RECREATIONAQW20036508/31/2020MKMKRIVER HERITAGE PARK PHASE IIMPROVEMENTSREVISIONS PER CITY COMMENTS06/28/20211AQC303POST-CON SWPPPW
S
N
E
NOTE:
NO EARTH MOVING ACTIVITIES MAY
COMMENCE WITHOUT AN APPROVED
STORMWATER MANAGEMENT PERMIT.
LEGEND
EXISTING CONTOUR
EXISTING SANITARY SEWER
EXISTING STORM SEWER
NEW STORM SEWER
NEW CONTOUR
NEW SANITARY SEWER
XXX
TURF RESTORATION
SEE SHEET C302 FOR SEED MIX.
FORESTED WETLAND MIX
SEE SHEET C302 FOR SEED MIX.
STORMWATER POLLUTION
PREVENTION GENERAL NOTES:
1.EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS 2-4 OF
"PRECONSTRUCTION ACTIVITIES" ON THIS SHEET HAVE BEEN
COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN.
2.RULE 5 REQUIRES ALL DISTURBED AREAS THAT WILL
POTENTIALLY BE IDLE FOR 10 DAYS OR MORE TO BE STABILIZED
(SEEDED, MULCHED, ETC.) IMMEDIATELY.
3.ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE
REQUIRED IN THE FIELD BY HAMILTON COUNTY
4.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS
IN THE STREETS.
5.APPROXIMATE CONSTRUCTION SCHEDULE:
START DATE: APRIL 2021
COMPLETION DATE: DECEMBER 2021
6.LATITUDE: 39.97858
LONGITUDE: -86.06317
7.CONTACT PERSON:
MICHAEL KLITZING, DIRECTOR
CARMEL/CLAY PARKS & RECREATION
1411 EAST 116TH STREET
CARMEL, INDIANA 46032
(317) 573-4018
9.WARNING:
THIS SHEET TO BE USED FOR STORM WATER POLLUTION
PREVENTION PURPOSES ONLY.
10.SEE SHEETS C300-C305 FOR ALL STORM WATER POLLUTION
PREVENTION PLAN DETAILS & NOTES
XXX
UPLAND WOODLAND MIX
SEE SHEET C302 FOR SEED MIX.
TREE MITIGATION PRACTICES:
1.) Contractor is responsible for clearly marking the proposed boardwalk and pathway on site
2.) Owner & Landscape Architect shall do a thorough walk through with the contractor and
adjust the pathway accordingly to minimize all tree impacts.
3.) The contractor will be responsible for documenting all tree removal that will include but
not limited to:
a.) DBH
b.) Type/Species
c.) Location
d.) Photos of Health Status
e.) Non-Wetland Forest (at least one acre of disturbance) 2:1 ratio
4.) An area on site will be identified for replacement trees to be located.
5.) Mitigation efforts and location of all replacements shall be thoroughly documented for
future Mitigation Performance that will include all Monitor Reporting outlined in the DNR
Information Bulletin #17 (Fifth Amendment) Page 9 XI.
1 1
1
1
1