Loading...
HomeMy WebLinkAboutA-131B-FIRST-FLOOR-REFLECTED-CEILING-PLAN---AREA-B-Rev.72 2 5 5 6 6 7 7 E E D D F F G G 4 4 H H ACT-01 12'-0" A.F.F. GWB-X1 11'-0" A.F.F. 1 1 8 8 ACT-01 12'-0" A.F.F. 2'-3"3'-0"2'-0"1'-6" 1'-6"EQ EQ 1'-6"1'-6"1'-6"1'-6"EQEQ1'-0 1/16"J J ACT-03 13'-0" A.F.F. ACT-01 12'-0" A.F.F. ACT-01 9'-0" A.F.F. ACT-01 9'-0" A.F.F. ACT-01 9'-0" A.F.F. ACT-01 9'-0" A.F.F. ACT-03 12'-0" A.F.F. 3 3 CABIN TRAINER SUPPORT SPACES 102 CABIN TRAINER 103 COMMUNITY CENTER LAB 107A WAITING 107 LOCKED CABIN TRAINER STG 107B 100 PERSON AUDITORIUM 106 RAMP 105 UNDER AND OVER UPPER CABINET LIGHTSOPEN TO 3RD FLOOR PT-11 PT-11 PT-10 PT-10 PT-10 PT-10 GWB-X1 8'-2" A.F.F. 9'-6" ACT-03 9'-0" A.F.F. ACT-03 13'-0" A.F.F. GWB-X1 8'-2" A.F.F. WOMEN 121 MEN 120 JAN 123 4'-0" ENTRY STAIR 101 ENTRY STAIR 101 GENDER NEUTRAL 122 ADA 119 1'-0"2'-4 7/8" GWB-X1 8'-2" A.F.F.1'-0"3'-6"GWB-X1 8'-0" A.F.F. GWB-X1 8'-0" A.F.F.2'-9"7'-0" GWB-X1 12'-0" A.F.F. GWB-X1 12'-0" A.F.F. 6" ACT-02 15'-0" A.F.F. ACT-02 15'-0" A.F.F. GWB-X1 13'-0" A.F.F. ACT-01 12'-0" A.F.F. GWB-X1 13'-0" A.F.F. GWB-X1 14'-6" A.F.F. PT-11 GWB-X1 10'-1" A.F.F.5"TYP. 1'-11"EQEQ.ACT-01 11'-0" A.F.F. GWB-X1 10'-10" A.F.F. GWB-X1 10'-10" A.F.F. OPERABLE WALL PARTITION CEILING TRACK - VERIFY WITH MFR. 1'-0"8'-6"8'-6"7'-3"6 5/16"1'-11"ALIGN 11 5/8"EQ.EQ. 1'-0"1'-0"1'-0"6'-0"6'-0"1'-11"EQ.EQ.ALIGNALIGN1'-11"EQ. EQ. 7'-0" 7'-0" EQ EQ PT-10PT-11MAINTENANCE LARGE EQUIPMENT TRAINING 111 MAINTENANCE 32 STUDENT 112 MAINTENANCE 30 STUDENT 113 DELIVERY 116 TRASH 117 WATER SERVICE 117A LOUNGE 114 60 PERSON CLASSROOM 118 D5 A-521 D5 A-521 D5 A-521 ALIGNG3 A-521 TYP. G3 A-521ALIGN D1 A-521 D1 A-521 E6 A-521 F3 A-521 ALIGN B1 A-521 B1 A-521 B1 A-521 PT-10G3 A-521 A5 A-521 TYP B1 A-521 4 1/4" SIM TYP B1 A-521 WT-03 WT-03 WT-02 4'-0"2'-0" 6" ALIGNA1 A-521 TYP. A1 A-521 TYP. A1 A-521 TYP. A3 A-521 G3 A-521 G3 A-521 G3 A-521 9'-0" TYP B3 A-521 B1 A-521ALIGN2'-7 1/16" 5'-0" 5'-0"4'-0"ACT-03 13'-0" A.F.F. 2'-9"6"2'-6"6"4'-0"EQ EQ EQEQEQ EQEQ EQA3 A-521 WT-01ALIGN WT-01 PT-10 GWB-X1 8'-6" A.F.F. 11" WT-01 PT-10 WT-01 PROVIDE ALTERNATE BID FOR PENDANTS ALONG WEST AND NORTH WALL IN LIEU OF 2'X4' SUSPENDED FIXTURES PROVIDE ALTERNATE BID FOR PENDANTS IN THIS ROOM IN LIEU OF SUSPENDED CYLINDER FIXTURES PROVIDE ALTERNATE BID FOR FIVE PENDANTS IN THIS AREA SHOWN IN LIEU OF ADDITIONAL DOWNLIGHTS DOWNLIGHTS SHOWN IN CORRIDOR TO BE EQUALLY SPACED BETWEEN NORTH AND SOUTH.1'-2 1/8"ALIGN2'-2 7/8" 6 3/4" 5" 4 1/4" 1'-0" 1'-0"1'-0"ALIGN GLASS WITH EDGE OF BULKHEAD REFERENCE EXTERIOR WALL SECTION FOR CEILING CONDITION ACT-01 11'-2" A.F.F. GWB-X1 10'-2" A.F.F. 1'-0 " 3 G3 A-521 F3 A-521 1'-2"3'-0 " 12'-9" 3'-0" 12'-9"1'-2"3'-0"1'-2"12'-9" 2'-4 5/8" 3 GWB-X1 10'-2" A.F.F. ACT-01 12'-0" A.F.F. PT-10 PT-02 REFERENCE ARCH PLAN FOR BULKHEAD SECTION 3 6" PT-10 A3 A-521 SIM A5 A-521 TYP PT-11 PT-11 PT-11 PT-10 7 1/4"7 1/4"ALIGNPAINT ALL EXPOSED STRUCTURAL INCLUDING PIPING, HVAC AND EXPOSED DUCTWORK PAINT ALL EXPOSED STRUCTURAL INCLUDING PIPING, HVAC AND EXPOSED DUCTWORK PAINT ALL EXPOSED STRUCTURAL INCLUDING PIPING, HVAC AND EXPOSED DUCTWORK ACT-01 9'-0" A.F.F. 5 5 GWB-X1 9'-0" A.F.F. ALIGN 5 PT-10 PT-10 5 5 PT-10 5 PT-10PT-10PT-10 PT-10 PT-10 5 5 5 5 5 PT-10 5 GYB BOARD CEILING (REFER TO PLAN FOR SUSPENSION TYPE) PT-10 U.N.O. ACOUSTIC CEILING TILE 2 x 4 LIGHT FIXTURE 4" APERTURE LED CIRCULAR DOWNLIGHT DECORATIVE PENDANT - GLOBAL LIGHTING ZERO 36" CYLINDER PENDANT IN EXPOSED CEILING SPOT ELEVATION MARKER XXX-01 10'-10" A.F.F. CEILING TAG CEILING TYPE CEILING HEIGHT (ABOVE FINISH FLOOR) UPGRADED PERFORATED METAL PANELS 4" APERTURE LED SQUARE DOWNLIGHT EXPOSED METAL OR PRECAST CEILING PT-10 U.N.O. VERTICAL 1" APERTURE RECESSED SLOT LIGHT UNDER AND OVER CABINET LIGHTING A. THESE GENERAL NOTES APPLY TO SERIES A-130 REFLECTED CEILING DRAWINGS. B. INSTALL NEW CEILINGS AT HEIGHTS AND MATERIAL NOTED. C. CENTER CEILING GRIDS WITHIN ROOMS EACH DIRECTION UNLESS NOTED OTHERWISE. D. LOCATE CEILING GRIDS WITHIN ROOMS SUCH THAT BORDERS CONTAIN NOT LESS THAN 1/2 TILE WIDTH, UNLESS OTHERWISE INDICATED. E. CENTER PENETRATIONS IN ACOUSTICAL CEILING SYSTEMS WITHIN INDIVIDUAL CEILING PANELS, SUCH AS SPRINKLER HEADS, DIFFUSERS, LIGHT FIXTURES, ETC., UNLESS OTHERWISE INDICATED. F. PAINT EXPOSED GYPSUM BOARD AND PLASTER CEILING SURFACES PT-10 UNLESS OTHERWISE INDICATED. G. PROVIDE CONTROL JOINTS (C.J.) IN GYPSUM BOARD CEILING CONSTRUCTION AS INDICATED. WHERE NOT SHOWN, PROVIDE MAXIMUM SPACING BETWEEN JOINTS OF 30'-0”. VERIFY FINAL CONTROL JOINT LOCATIONS WITH ARCHITECT PRIOR TO STARTING WORK WHETHER OR NOT INDICATED ON THE DRAWINGS. H. CEILING ACCESS PANELS INDICATED ARE NOT INTENDED TO LIMIT NUMBER OF PANELS REQUIRED. PANEL QUANTITY SHALL BE SUFFICIENT TO PROVIDE REQUIRED ACCESS WHETHER OR NOT INDICATED ON THE DRAWINGS. VERIFY FINAL LOCATIONS WITH ARCHITECT PRIOR TO STARTING WORK. I. REFER TO SERIES A-001 GENERAL INFORMATION DRAWINGS FOR MATERIAL SYMBOL KEY. J. REFER TO SERIES A-150 FINISH PLANS FOR ADDITIONAL CEILING FINISH INFORMATION. K. REFER TO ELECTRICAL DRAWINGS FOR CEILING-MOUNTED LIGHT FIXTURE TYPES AND QUANTITIES. L. REFER TO MECHANICAL DRAWINGS FOR CEILING-MOUNTED DIFFUSERS, GRILLE TYPES AND QUANTITIES. M. REFER TO FIRE PROTECTION DRAWINGS FOR SPRINKLER HEAD TYPES AND QUANTITIES. HEADS HAVE BEEN INTENTIONALLY OMITTED FROM REFLECTED CEILING PLANS FOR CLARITY. N. INSTALLATION OF CEILING SYSTEMS SHALL NOT BEGIN PRIOR TO SUBMITTAL AND REVIEW OF CEILING COORDINATION DRAWINGS SHOWING LAYOUT OF CEILING GRIDS OR CONTROL JOINTS AND ITEMS TO BE INSTALLED IN OR ON CEILINGS SUCH AS SPRINKLER HEADS, DIFFUSERS, GRILLES, LIGHT FIXTURES, FIRE DETECTION AND ALARM DEVICES, ACCESS PANELS, ETC. O. PROVIDE 4" AXIOM EDGE TRIM ON ALL EXPOSED EDGES OF CEILINGS UNLESS NOTED OTHERWISE. P. IN AREAS WHERE STRUCTURE IS EXPOSED, CONTRACTOR TO PROVIDE FiNAL LAYOUTS OF ALL DUCTWORK, PIPING, CONDUIT, LIGHTING, ETC. FOR FINAL APPROVAL BY ARCHITECT PRIOR TO INSTALLATION. PAINT ALL EXPOSED ELEMENTS AS INDICATED ON PLAN. Q. PAINT ALL ELEMENTS ABOVE CLOUD CEILINGS WITHIN 6'-0" OF PERIMETER INCLUDING BUT NOT LIMITED TO DUCTWORK, STRUCTURE, CABLES, METAL STUDS, PIPING, CEILING HANGERS, AND MECHANICAL DEVICES SHEET TITLE SHEET NUMBER Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect / Landscape Architect McComas/O'donnell & Naccarato Structural Engineer Mechanical / Plumbing Design/Builder Civil Engineer 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 F.A. Wilhelm Construction 3914 Prospect Street Indianapolis, Indiana 46203 317-359-5411 Construction Manager 1/21/2022 4:35:03 PMA-131B FIRST FLOOR REFLECTED CEILING PLAN - AREA B 21040.000 Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 1/8" = 1'-0"A-131B A1 FIRST LEVEL RCP 1 BID EVENT #5 11/05/21 2 PERMIT SET 11/19/21 3 CD SET 12/17/21 4 BULLETIN SET 01/13/22 5 BULLETIN 2 01/20/22 01/20/22 RCP LEGEND KEYNOTES (SPEC BASED) KEYNOTES (ACTION/GENERAL) GENERAL CEILING PLAN NOTES 02/23/22