HomeMy WebLinkAboutA-151B-FIRST-FLOOR-FINISH-PLAN---AREA-B-Rev.72
2
5
5
6
6
7
7
E E
D D
F F
G G
4
4
H H
A4
A-425
A7
A-322
A3
A-351
A1
A-322
A2
A-354
1
1
8
8
A5
A-425
A6
A-362
J J
E1
A-301
W
B
F
RB-1
CONC-01
PT-3
SIM PARTS
STORAGE
127
W
B
F
RB-1
CONC-01
PT-3
COMPUTER
ROOM
128 W
B
F
RB-1
CONC-01
PT-3
COMPUTER
ROOM
126
W
B
F
RB-1
CONC-01
PT-3
FUTURE
COMPUTER
ROOM
125
W
B
F
RB-1
CONC-01
PT-3
CABIN TRAINER
103
W
B
F
RB-1
CPT-1
PT-3
60 PERSON
CLASSROOM
118
W
B
F
RB-1
CPT-1
PT-3
MAINTENANCE
LARGE
EQUIPMENT
TRAINING
111 W
B
F
RB-1
CPT-1
PT-3
MAINTENANCE
32 STUDENT
112
W
B
F
RB-1
CPT-1
PT-3
MAINTENANCE
30 STUDENT
113
W
B
F
RB-1
CONC-01
PT-3
DELIVERY
116
W
B
F
RB-1
CONC-01
PT-3
TRASH
117
W
B
F
RB-1
CONC-01
PT-3
WATER SERVICE
117A
MEN
120
WOMEN
121
ADA
119
GENDER
NEUTRAL
122
JAN
123
W
B
F
RB-1
CPT-1
PT-3
100 PERSON
AUDITORIUM
106
W
B
F
SOUTH
CORRIDOR
104
RB-01
CPT-02
PT-01
W
B
F
RAMP
105
RB-01
CPT-02
PT-01
W
B
F
NORTH
CORRIDOR
110
RB-01
CPT-02
PT-01
W
B
F
RB-1
CPT-1
PT-3
COMMUNITY
CENTER LAB
107A
W
B
F
RB-1
CONC-01
PT-3
LOCKED CABIN
TRAINER STG
107B
W
B
F
LOUNGE
114
RB-02
CT-10
PT-01
W
B
F
ACCESS
CORRIDOR
115
RB-02
LVT-01
PT-01
A2/A-650 A2/A-650A2/A-650A2/A-650A2/A-650HALL
119
CPT-03
W
B
F
ENTRY STAIR
101
RB-02
CT-10
PT-01
A6
A-322
A-411
A4
D3
A-322
C1
A-322
D2
A-322
A1
A-354
3
3
D4
A-501
TARKETT SLIMLINE NOSING AT EACH
CARPET TREAD AT LEVEL CHANGES.
RISERS ARE TARKETT 6" TIGHTLOCK
RUBBER BASE PER DETAIL D1/A-650
PT-02PT-02WC-02W
B
F
VESTIBULE
100
RB-02
WOM-01
PT-01
PT-02
PT-02
WC-02A PT-02 PT-02
WC-02A
WDV-01PT-02 PT-02
PT-02
PT-02
WC-02A
WC-03 WC-03PT-01PT-02WC-04CT-02PT-02PT-01PT-01PT-01WC-02APT-01C2/A-650C2-A-650
LVT-01
ALL METAL
COMPONENTRY
(HANDRAILS,
RISERS,
STRINGER AND
UNDERSIDE OF
STAIRS TO BE
PT--04)A2/A-650A2/A-650ALIGN GROUT
W/ CORNER
2'-0"ALIGND1/A-650
CENTER CARPET TILE
LENGTH
AT POINT WHERE RAMP
STARTS TO ALLOW FOR
MAXIMUM ADHESIONALIGN CARPET TILE CUT
EDGES AT BOTTOM OF
RAMP FOR SHARP MITRED
CONNECTION ALLOW FOR
MAXIMUM ADHESION
WC-03
A4
A-362
CG-01
CG-01
CG-01
FRP-01FRP-01FRP-01FRP-01FRP-01 FRP-01 FRP-01FRP-01A5
A-323
1
A-323
A2/A-650 CT-10
LVT-01C2/A-650C2-A-650
8'-11"ALT
2
2'-0"
2'-0"
3
3
WRAP RB-02
TO INSIDE
CORNER
PT-02PT-02
3
PT-02
3
3
CG-01
3
W
B
F
LOUNGE
114A
RB-02
CPT-03
PT-01
A2/A-650PT-02
3
3
CT-10
VERTICAL SCHLUTER
TRIM TRANSITION AT
OUTSIDE CORNERS
FLR TO
96" AFF
CT-10
CPT-01 CPT-01
3
3
3
3 3
W
B
F
RB-1
CONC-01
PT-3
AIR
COMPRESSOR
102A
W
B
F
RB-1
CONC-01
PT-3
CABIN TRAINER
SUPPORT
SPACES
102
WOM-01
FLOORING MATERIAL
TRANSITION VIEW
REFERENCE
W
B
F
Room name
XXXXX
Base Fin
Floor Fin
Wall Fin
150 SF
ROOM NAME AND
ROOM FINISHES
PT-XX ACCENT WALL FINISH
DESIGNATION
FLOORING DIRECTION
-/---
CT
CONC
CPT
CONC
LVT
CONC
CPT
CT
CPT
LVT
CPT
QT
-/ ---
A1/A-650 B1/A-650 D2/A-650
C2/A-650A2/A-650
A. THESE GENERAL NOTES APPLY TO SERIES A-130 AND A-150 DRAWINGS .
B. PAINT NEW HOLLOW METAL DOORS, DOOR FRAMES, AND LINTELS EXPOSED TO VIEW IN FINISHED AREAS AND AT EXTERIOR LOCATIONS PT-20 UNLESS
NOTED OTHERWISE.
C. PAINT EXPOSED PRECAST EXTERIOR WALLS AS INDICATED.
D. PAINT EXPOSED PRECAST CEILINGS, BEAMS AND STRUCTURE AS INDICATED.
E. PAINT FIRE EXTINGUISHER CABINETS, METAL ACCESS PANELS, LOUVERS, UNIT VENTILATORS, AND OTHER PAINTABLE SURFACES IN ROOMS TO BE
FINISHED TO MATCH HOST WALL UNLESS NOTES OTHERWISE.
F. IN ENCLOSED STAIRWELLS, PAINT STEEL STAIR AND LANDING PARTS EXPOSED TO VIEW INCLUDING RISERS, STRINGERS, UNDERSIDE OF STAIR
STRUCTURE, HANDRAILS, WALL BRACKETS, COMPONENTS VISIBLE FROM EXTERIOR, ETC., PT-04 UNLESS NOTED OTHERWISE.
G. DO NOT APPLY FINISHES BEHIND FIXED CABINETS/ CASEWORK.
H. PROVIDE FINISHES BEHIND FIXED EQUIPMENT SUCH AS CHALK AND TACKBOARDS, LOCKERS, ETC.
I. ALIGN FLOOR FINISH TRANSITIONS AT DOOR LOCATIONS WITH CENTERLINE OF DOOR SUCH THAT TRANSITION MATERIALS ARE NOT VISIBLE FROM
EITHER SIDE WHEN DOOR IS IN CLOSED POSITION.
J. REFER TO REFLECTED CEILING PLANS AND INTERIOR ELEVATIONS FOR ADDITIONAL FINISH INFORMATION.
K. REFER TO PROJECT MANUAL DIVISION 09 FOR FINISH LEVEL REQUIREMENTS FOR GYPSUM BOARD SURFACES UNLESS OTHERWISE INDICATED.
L. ELEVATOR CABS TO RECEIVE CPT-02 FLOORING, PLM-05 WALLS, AND STAINLESS STEEL CEILINGS, UNLESS NOTED OTHERWISE.
M. REFERENCE SHEET A-650 FOR TYPICAL TRANSITION AND BASE DETAILS.
N. ALL WINDOWSILLS SHALL BE PAINTED DRYWALL UNLESS NOTED OTHERWISE.
O. DO NOT APPLY BASE TO CURTAIN WALL BASE MULLION, PRECAST WALLS OR CASEWORK. SCRIBE FLOOR FINISHES TO MULLIONS / PRECAST AND
CASEWORK. IN CASES WHERE FLOOR FINISH IS SEALED CONCRETE, INSURE TRANSITION TO WALL FINISH IS CLEAN AND PRECISE.
P. UNLESS NOTED OTHERWISE, DO NOT TERMINATE OR TRANSITION ANY FINISHES ON OUTSIDE CORNERS. BRING ANY CONFLICTS TO THE
ARCHITECT'S/OWNER'S ATTENTION PRIOR TO ORDER AND INSTALLATION OF MATERIALS.
SHEET TITLE
SHEET NUMBER
Kite Realty Group
30 S. Meridian Street, #1100
Indianapolis, Indiana 46204
Owner
Republic Airways Holdings
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect / Landscape Architect
McComas/O'donnell & Naccarato
Structural Engineer
Mechanical / Plumbing Design/Builder
Civil Engineer
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
KEY PLAN
B
A
HOTEL
PROJECT NO.
SHEET ISSUE
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
TRAINING
CENTER
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
F.A. Wilhelm Construction
3914 Prospect Street
Indianapolis, Indiana 46203
317-359-5411
Construction Manager
1/14/2022 11:10:14 AMA-151B
FIRST FLOOR FINISH
PLAN-AREA B
21040.000
Republic Airways
Training Center
12195 N. Meridian St.
Carmel, Indiana
46032
1/8" = 1'-0"A-151B
A1 FIRST LEVEL FINISH PLAN -AREA B
1 PERMIT SET 11/19/21
2 CD SET 12/17/21
3 BULLETIN SET 01/13/22
01/13/22
FINISHES-SYMBOLS LEGEND KEYNOTES (SPEC BASED)FINISH TRANSITIONS AT DOORS GENERAL FINISH PLAN NOTES
02/23/22