Loading...
HomeMy WebLinkAboutA-152B-SECOND-FLOOR-FINISH-PLAN---AREA-B-Rev.72 2 5 5 6 6 7 7 E E D D F F G G 4 4 H H A4 A-425 A7 A-322 A3 A-351 A1 A-322 A2 A-354 1 1 8 8 A5 A-425 J J E1 A-301 C1 A-301 C1 A-301 A6 A-322 A1 A-302 W B F STAIR/ ENTRY 201 RB-02 CPT-02 PT-01 W B F RB-1 CPT-1 PT-3 LIFT CLASSROOM -30 PEOPLE 202 W B F RB-1 CPT-1 PT-3 CTP/ UPGRADE/ SYSTEMS/ RECURRENT 28 STUDENTS 203W B F RB-1 CPT-1 PT-3 NEW HIRE FLIGHT OPS 40 STUDENT ROOM 205 W B F RB-1 CPT-1 PT-3 CTP/ UPGRADE/SYSTEMS/ RECURRENT 24 STUDENTS 207 W B F RB-1 CPT-1 PT-3 BRIEF 212B W B F RB-1 CPT-1 PT-3 DEBRIEF 212A W B F RB-1 CPT-1 PT-3 BRIEF 211B W B F RB-1 CPT-1 PT-3 DEBRIEF 211A W B F RB-1 CPT-1 PT-3 BRIEF 210B W B F RB-1 CPT-1 PT-3 DEBRIEF 210A W B F RB-1 CPT-1 PT-3 BRIEF 209B W B F RB-1 CPT-1 PT-3 DEBRIEF 209A W B F RB-1 CPT-1 PT-3 BRIEF 208B W B F RB-1 CPT-1 PT-3 DEBRIEF 208A W B F RB-01 LVT-01 PT-03 VPT 212 W B F RB-01 LVT-01 PT-03 VPT 211 W B F RB-01 LVT-01 PT-03 VPT 210 W B F RB-01 LVT-01 PT-03 VPT 209 W B F RB-01 LVT-01 PT-03 VPT 208 W B F RB-1 CONC-01 PT-3 VIRTUAL CLASSROOM 216 W B F RB-1 CPT-1 PT-3 CTP/ UPGRADE/ SYSTEMS/ RECURRENT 24 STUDENTS 217 W B F RB-1 CPT-1 PT-3 CTP/ UPGRADE SYSTEMS/ RECURRENT -24 STUDENTS 218 W B F RB-1 CPT-1 PT-3 CTP UPGRADE SYSTEMS/ RECURRENT -24 STUDENTS 219 W B F SOUTH CORRIDOR 204 RB-01 CPT-02 PT-01 W B F NORTH CORRIDOR 214 RB-01 CPT-02 PT-01 W B F RB-1 CPT-1 PT-3 FLIGHT OPS 48 PEOPLE 220 W B F RB-1 CPT-1 PT-3 FLIGHT OPS 48 PEOPLE 221 W B F CORRIDOR 201B RB-02 CPT-02 PT-01 MEN 223ADA 222 WOMEN 224 GENDER NEUTRAL 225 JAN 226 A-411 A4 TYP A1 A-354 3 3 W B F SOUTH CORRIDOR 203B RB-01 CPT-02 PT-01 W B F RB-1 CONC-01 PT-3 ELEC 203A D4 A-501 PT-02 PT-02 PT-02 PT-02 WC-02A PT-02 PT-02 WC-02A PT-02 PT-02 WC-02A PT-02 PT-02 WC-02A PT-02PT-02 PLM-02 PLM-02 PLM-02 PLM-02 PLM-02 WC-03 WC-03WC-03 W B F SOUTH CORRIDOR 204 RB-01 CPT-02 PT-01 WC-02AWC-02PT-02CT-02PT-02PT-02PT-01PT-01WC-02APT-01CPT-02A2/A-650PT-01PT-01PT-01ALL METAL COMPONENTRY (HANDRAILS, RISERS, STRINGER AND UNDERSIDE OF STAIRS TO BE PT--04) PT-02 WDT-01PT-02PT-02PT-02PT-02 PT-02 CG-01 CG-01 A5 A-323 W B F RB-1 CONC-01 PT-3 IDF 203C CG-01 2 FLOORING MATERIAL TRANSITION VIEW REFERENCE W B F Room name XXXXX Base Fin Floor Fin Wall Fin 150 SF ROOM NAME AND ROOM FINISHES PT-XX ACCENT WALL FINISH DESIGNATION FLOORING DIRECTION -/--- CT CONC CPT CONC LVT CONC CPT CT CPT LVT CPT QT -/ --- A1/A-650 B1/A-650 D2/A-650 C2/A-650A2/A-650 A. THESE GENERAL NOTES APPLY TO SERIES A-130 AND A-150 DRAWINGS . B. PAINT NEW HOLLOW METAL DOORS, DOOR FRAMES, AND LINTELS EXPOSED TO VIEW IN FINISHED AREAS AND AT EXTERIOR LOCATIONS PT-20 UNLESS NOTED OTHERWISE. C. PAINT EXPOSED PRECAST EXTERIOR WALLS AS INDICATED. D. PAINT EXPOSED PRECAST CEILINGS, BEAMS AND STRUCTURE AS INDICATED. E. PAINT FIRE EXTINGUISHER CABINETS, METAL ACCESS PANELS, LOUVERS, UNIT VENTILATORS, AND OTHER PAINTABLE SURFACES IN ROOMS TO BE FINISHED TO MATCH HOST WALL UNLESS NOTES OTHERWISE. F. IN ENCLOSED STAIRWELLS, PAINT STEEL STAIR AND LANDING PARTS EXPOSED TO VIEW INCLUDING RISERS, STRINGERS, UNDERSIDE OF STAIR STRUCTURE, HANDRAILS, WALL BRACKETS, COMPONENTS VISIBLE FROM EXTERIOR, ETC., PT-04 UNLESS NOTED OTHERWISE. G. DO NOT APPLY FINISHES BEHIND FIXED CABINETS/ CASEWORK. H. PROVIDE FINISHES BEHIND FIXED EQUIPMENT SUCH AS CHALK AND TACKBOARDS, LOCKERS, ETC. I. ALIGN FLOOR FINISH TRANSITIONS AT DOOR LOCATIONS WITH CENTERLINE OF DOOR SUCH THAT TRANSITION MATERIALS ARE NOT VISIBLE FROM EITHER SIDE WHEN DOOR IS IN CLOSED POSITION. J. REFER TO REFLECTED CEILING PLANS AND INTERIOR ELEVATIONS FOR ADDITIONAL FINISH INFORMATION. K. REFER TO PROJECT MANUAL DIVISION 09 FOR FINISH LEVEL REQUIREMENTS FOR GYPSUM BOARD SURFACES UNLESS OTHERWISE INDICATED. L. ELEVATOR CABS TO RECEIVE CPT-02 FLOORING, PLM-05 WALLS, AND STAINLESS STEEL CEILINGS, UNLESS NOTED OTHERWISE. M. REFERENCE SHEET A-650 FOR TYPICAL TRANSITION AND BASE DETAILS. N. ALL WINDOWSILLS SHALL BE PAINTED DRYWALL UNLESS NOTED OTHERWISE. O. DO NOT APPLY BASE TO CURTAIN WALL BASE MULLION, PRECAST WALLS OR CASEWORK. SCRIBE FLOOR FINISHES TO MULLIONS / PRECAST AND CASEWORK. IN CASES WHERE FLOOR FINISH IS SEALED CONCRETE, INSURE TRANSITION TO WALL FINISH IS CLEAN AND PRECISE. P. UNLESS NOTED OTHERWISE, DO NOT TERMINATE OR TRANSITION ANY FINISHES ON OUTSIDE CORNERS. BRING ANY CONFLICTS TO THE ARCHITECT'S/OWNER'S ATTENTION PRIOR TO ORDER AND INSTALLATION OF MATERIALS. SHEET TITLE SHEET NUMBER Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect / Landscape Architect McComas/O'donnell & Naccarato Structural Engineer Mechanical / Plumbing Design/Builder Civil Engineer 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 F.A. Wilhelm Construction 3914 Prospect Street Indianapolis, Indiana 46203 317-359-5411 Construction Manager 1/14/2022 11:10:37 AMA-152B SECOND FLOOR FINISH PLAN-AREA B 21040.000 Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 1/8" = 1'-0"A-152B A1 FNSH-Second Level -Area B 1 PERMIT SET 11/19/21 2 BULLETIN SET 01/13/22 01/13/22 FINISHES-SYMBOLS LEGEND KEYNOTES (SPEC BASED)FINISH TRANSITIONS AT DOORS GENERAL FINISH PLAN NOTES 02/23/22