HomeMy WebLinkAboutA-152B-SECOND-FLOOR-FINISH-PLAN---AREA-B-Rev.72
2
5
5
6
6
7
7
E E
D D
F F
G G
4
4
H H
A4
A-425
A7
A-322
A3
A-351
A1
A-322
A2
A-354
1
1
8
8
A5
A-425
J J
E1
A-301
C1
A-301
C1
A-301
A6
A-322
A1
A-302
W
B
F
STAIR/ ENTRY
201
RB-02
CPT-02
PT-01
W
B
F
RB-1
CPT-1
PT-3
LIFT
CLASSROOM -30
PEOPLE
202
W
B
F
RB-1
CPT-1
PT-3
CTP/ UPGRADE/
SYSTEMS/
RECURRENT 28
STUDENTS
203W
B
F
RB-1
CPT-1
PT-3
NEW HIRE
FLIGHT OPS 40
STUDENT ROOM
205
W
B
F
RB-1
CPT-1
PT-3
CTP/
UPGRADE/SYSTEMS/
RECURRENT 24
STUDENTS
207
W
B
F
RB-1
CPT-1
PT-3
BRIEF
212B
W
B
F
RB-1
CPT-1
PT-3
DEBRIEF
212A W
B
F
RB-1
CPT-1
PT-3
BRIEF
211B
W
B
F
RB-1
CPT-1
PT-3
DEBRIEF
211A
W
B
F
RB-1
CPT-1
PT-3
BRIEF
210B W
B
F
RB-1
CPT-1
PT-3
DEBRIEF
210A W
B
F
RB-1
CPT-1
PT-3
BRIEF
209B
W
B
F
RB-1
CPT-1
PT-3
DEBRIEF
209A W
B
F
RB-1
CPT-1
PT-3
BRIEF
208B
W
B
F
RB-1
CPT-1
PT-3
DEBRIEF
208A
W
B
F
RB-01
LVT-01
PT-03
VPT
212
W
B
F
RB-01
LVT-01
PT-03
VPT
211
W
B
F
RB-01
LVT-01
PT-03
VPT
210
W
B
F
RB-01
LVT-01
PT-03
VPT
209 W
B
F
RB-01
LVT-01
PT-03
VPT
208
W
B
F
RB-1
CONC-01
PT-3
VIRTUAL
CLASSROOM
216
W
B
F
RB-1
CPT-1
PT-3
CTP/ UPGRADE/
SYSTEMS/
RECURRENT 24
STUDENTS
217
W
B
F
RB-1
CPT-1
PT-3
CTP/ UPGRADE
SYSTEMS/
RECURRENT -24
STUDENTS
218
W
B
F
RB-1
CPT-1
PT-3
CTP UPGRADE
SYSTEMS/
RECURRENT -24
STUDENTS
219
W
B
F
SOUTH
CORRIDOR
204
RB-01
CPT-02
PT-01
W
B
F
NORTH
CORRIDOR
214
RB-01
CPT-02
PT-01
W
B
F
RB-1
CPT-1
PT-3
FLIGHT OPS 48
PEOPLE
220
W
B
F
RB-1
CPT-1
PT-3
FLIGHT OPS 48
PEOPLE
221
W
B
F
CORRIDOR
201B
RB-02
CPT-02
PT-01
MEN
223ADA
222
WOMEN
224
GENDER
NEUTRAL
225
JAN
226
A-411
A4
TYP
A1
A-354
3
3
W
B
F
SOUTH
CORRIDOR
203B
RB-01
CPT-02
PT-01
W
B
F
RB-1
CONC-01
PT-3
ELEC
203A
D4
A-501
PT-02 PT-02
PT-02 PT-02
WC-02A PT-02 PT-02
WC-02A PT-02 PT-02
WC-02A PT-02 PT-02
WC-02A
PT-02PT-02
PLM-02 PLM-02 PLM-02 PLM-02 PLM-02
WC-03 WC-03WC-03
W
B
F
SOUTH
CORRIDOR
204
RB-01
CPT-02
PT-01 WC-02AWC-02PT-02CT-02PT-02PT-02PT-01PT-01WC-02APT-01CPT-02A2/A-650PT-01PT-01PT-01ALL METAL
COMPONENTRY
(HANDRAILS,
RISERS,
STRINGER AND
UNDERSIDE OF
STAIRS TO BE
PT--04)
PT-02
WDT-01PT-02PT-02PT-02PT-02 PT-02
CG-01
CG-01
A5
A-323
W
B
F
RB-1
CONC-01
PT-3
IDF
203C
CG-01
2
FLOORING MATERIAL
TRANSITION VIEW
REFERENCE
W
B
F
Room name
XXXXX
Base Fin
Floor Fin
Wall Fin
150 SF
ROOM NAME AND
ROOM FINISHES
PT-XX ACCENT WALL FINISH
DESIGNATION
FLOORING DIRECTION
-/---
CT
CONC
CPT
CONC
LVT
CONC
CPT
CT
CPT
LVT
CPT
QT
-/ ---
A1/A-650 B1/A-650 D2/A-650
C2/A-650A2/A-650
A. THESE GENERAL NOTES APPLY TO SERIES A-130 AND A-150 DRAWINGS .
B. PAINT NEW HOLLOW METAL DOORS, DOOR FRAMES, AND LINTELS EXPOSED TO VIEW IN FINISHED AREAS AND AT EXTERIOR LOCATIONS PT-20 UNLESS
NOTED OTHERWISE.
C. PAINT EXPOSED PRECAST EXTERIOR WALLS AS INDICATED.
D. PAINT EXPOSED PRECAST CEILINGS, BEAMS AND STRUCTURE AS INDICATED.
E. PAINT FIRE EXTINGUISHER CABINETS, METAL ACCESS PANELS, LOUVERS, UNIT VENTILATORS, AND OTHER PAINTABLE SURFACES IN ROOMS TO BE
FINISHED TO MATCH HOST WALL UNLESS NOTES OTHERWISE.
F. IN ENCLOSED STAIRWELLS, PAINT STEEL STAIR AND LANDING PARTS EXPOSED TO VIEW INCLUDING RISERS, STRINGERS, UNDERSIDE OF STAIR
STRUCTURE, HANDRAILS, WALL BRACKETS, COMPONENTS VISIBLE FROM EXTERIOR, ETC., PT-04 UNLESS NOTED OTHERWISE.
G. DO NOT APPLY FINISHES BEHIND FIXED CABINETS/ CASEWORK.
H. PROVIDE FINISHES BEHIND FIXED EQUIPMENT SUCH AS CHALK AND TACKBOARDS, LOCKERS, ETC.
I. ALIGN FLOOR FINISH TRANSITIONS AT DOOR LOCATIONS WITH CENTERLINE OF DOOR SUCH THAT TRANSITION MATERIALS ARE NOT VISIBLE FROM
EITHER SIDE WHEN DOOR IS IN CLOSED POSITION.
J. REFER TO REFLECTED CEILING PLANS AND INTERIOR ELEVATIONS FOR ADDITIONAL FINISH INFORMATION.
K. REFER TO PROJECT MANUAL DIVISION 09 FOR FINISH LEVEL REQUIREMENTS FOR GYPSUM BOARD SURFACES UNLESS OTHERWISE INDICATED.
L. ELEVATOR CABS TO RECEIVE CPT-02 FLOORING, PLM-05 WALLS, AND STAINLESS STEEL CEILINGS, UNLESS NOTED OTHERWISE.
M. REFERENCE SHEET A-650 FOR TYPICAL TRANSITION AND BASE DETAILS.
N. ALL WINDOWSILLS SHALL BE PAINTED DRYWALL UNLESS NOTED OTHERWISE.
O. DO NOT APPLY BASE TO CURTAIN WALL BASE MULLION, PRECAST WALLS OR CASEWORK. SCRIBE FLOOR FINISHES TO MULLIONS / PRECAST AND
CASEWORK. IN CASES WHERE FLOOR FINISH IS SEALED CONCRETE, INSURE TRANSITION TO WALL FINISH IS CLEAN AND PRECISE.
P. UNLESS NOTED OTHERWISE, DO NOT TERMINATE OR TRANSITION ANY FINISHES ON OUTSIDE CORNERS. BRING ANY CONFLICTS TO THE
ARCHITECT'S/OWNER'S ATTENTION PRIOR TO ORDER AND INSTALLATION OF MATERIALS.
SHEET TITLE
SHEET NUMBER
Kite Realty Group
30 S. Meridian Street, #1100
Indianapolis, Indiana 46204
Owner
Republic Airways Holdings
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect / Landscape Architect
McComas/O'donnell & Naccarato
Structural Engineer
Mechanical / Plumbing Design/Builder
Civil Engineer
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
KEY PLAN
B
A
HOTEL
PROJECT NO.
SHEET ISSUE
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
TRAINING
CENTER
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
F.A. Wilhelm Construction
3914 Prospect Street
Indianapolis, Indiana 46203
317-359-5411
Construction Manager
1/14/2022 11:10:37 AMA-152B
SECOND FLOOR
FINISH PLAN-AREA
B
21040.000
Republic Airways
Training Center
12195 N. Meridian St.
Carmel, Indiana
46032
1/8" = 1'-0"A-152B
A1 FNSH-Second Level -Area B
1 PERMIT SET 11/19/21
2 BULLETIN SET 01/13/22
01/13/22
FINISHES-SYMBOLS LEGEND KEYNOTES (SPEC BASED)FINISH TRANSITIONS AT DOORS GENERAL FINISH PLAN NOTES
02/23/22