Loading...
HomeMy WebLinkAboutM-202-OVERALL-SECOND-FLOOR-MECHANICAL-PIPING-PLAN-Rev.11 3 4 5 6 7 8 A B C D E F G H J 7.7 D.8 D.3 3.2 C.7 C.6 A.3 A.4 2 2.2 2.4 3.8 4.1 5.4 5.6 6.4 6.6 7.4 7.6 7.8 C.8 2.6 2.8 3.3 4.8 5.2 5.8 6.2 6.8 7.2 2.1 1.9 7 86 5 4 1 H A B C D E F G 2 J 3 SIM BAY 139 OBSERVATION PLATFORM 201A STAIR/ ENTRY 201 SOUTH CORRIDOR 204 LIFT CLASSROOM -30 PEOPLE 202 WOMEN 224 MEN 223 UNISEX 222 UNISEX 225 JAN 226 CTP/ UPGRADE/ SYSTEMS/ RECURRENT 28 STUDENTS 203 IDF 203C ELEC 203A SOUTH CORRIDOR 203B STAIRS-02 S-002 NEW HIRE FLIGHT OPS 40 STUDENT ROOM 205 BRIEF 212B DEBRIEF 212A BRIEF 211B DEBRIEF 211A BRIEF 210B DEBRIEF 210A BRIEF 209B DEBRIEF 209A BRIEF 208B DEBRIEF 208A VPT 208 VPT 209 VPT 210 VPT 211 VPT 212 NORTH CORRIDOR 214 CORRIDOR 201B CTP UPGRADE SYSTEMS/ RECURRENT -24 STUDENTS 219 CTP/ UPGRADE SYSTEMS/ RECURRENT -24 STUDENTS 218 CTP/ UPGRADE/ SYSTEMS/ RECURRENT 24 STUDENTS 217 VIRTUAL CLASSROOM 216CTP/ UPGRADE/SYSTEMS/ RECURRENT 24 STUDENTS 207 CUH-1 VAV-2-2 VAV-2-1 VAV-2-22 VAV-2-16VAV-2-15 VAV-2-17 VAV-2-14 VAV-2-13 VAV-2-3 VAV-2-20 VAV-2-23 VAV-2-12 VAV-2-19VAV-2-18 VAV-2-11 VAV-2-10 VAV-2-9VAV-2-8VAV-2-7 VAV-2-6 VAV-2-21 VAV-2-5 VAV-2-4 1 1 2 1 1 2 1 2 2 1 2 12 CUH-1 2 2 2 1 1 1 1 2 1 3 3 3 3 3 3 3 3 33 GENERAL NOTES: • REFER TO M-001 FOR ADDITIONAL GENERAL NOTES. • ALL EXPOSED DUCT TO BE PAINT GRIP FINISH. • ALL VAV BOXES MUST BE INSTALLED WITHIN 3'-0" ABOVE CEILING FOR MAINTENANCE. • REFER TO M-001 FOR INSULATION NOTES. • REFER TO PLUMBING PLANS FOR CONDENSATE PIPING.RD PE11400027 NENOISS AL EFORP D STATE OF NI IA N A ERG IN E SIGE TERE No.CAMERON T .YAMA SHITASHEET TITLE SHEET NUMBER Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect McComas/O'donnell & Naccarato Structural Engineer Mechanical / Plumbing Design/Builder Civil Engineer 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 12/17/2021 1:34:32 PMM-202 OVERALL SECOND FLOOR MECHANICAL PIPING PLAN 21040.000 Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 1 PERMIT SET 11/30/21 2 CD SET 12/17/21 12/17/21 3/32" = 1'-0"M-202 1 OVERALL SECOND FLOOR MECHANICAL PIPING PLAN PLAN NOTES: 1 REFRIGERANT PIPING FROM ABOVE. REFER TO ROOF PLAN FOR CONTINUATION. 2 REFRIGERANT PIPING DOWN TO SPACE BELOW. REFER TO FIRST FLOOR PLANS FOR CONTINUATION. 3 CONTRACTOR TO INSTALL REFRIGERANT PIPING AS REQUIRED PER MANUFACTURERS RECOMMENDATIONS. REFRIGERANT PIPING TO BE SIZED BY MANUFACTURER. COORDINATE PIPING WITH ALL OTHER TRADES. 02/23/22