HomeMy WebLinkAboutM-202-OVERALL-SECOND-FLOOR-MECHANICAL-PIPING-PLAN-Rev.11 3 4 5 6 7 8
A
B
C
D
E
F
G
H
J
7.7
D.8
D.3
3.2
C.7
C.6
A.3
A.4
2 2.2 2.4 3.8 4.1 5.4 5.6 6.4 6.6 7.4 7.6 7.8
C.8
2.6 2.8 3.3 4.8 5.2 5.8 6.2 6.8 7.2
2.1
1.9
7 86 5 4 1
H
A
B
C
D
E
F
G
2
J
3
SIM BAY
139
OBSERVATION PLATFORM
201A
STAIR/ ENTRY
201
SOUTH CORRIDOR
204
LIFT CLASSROOM -30 PEOPLE
202
WOMEN
224
MEN
223
UNISEX
222
UNISEX
225
JAN
226
CTP/ UPGRADE/ SYSTEMS/ RECURRENT
28 STUDENTS
203
IDF
203C
ELEC
203A SOUTH CORRIDOR
203B
STAIRS-02
S-002
NEW HIRE FLIGHT OPS 40 STUDENT
ROOM
205
BRIEF
212B
DEBRIEF
212A
BRIEF
211B
DEBRIEF
211A BRIEF
210B
DEBRIEF
210A
BRIEF
209B
DEBRIEF
209A
BRIEF
208B
DEBRIEF
208A
VPT
208
VPT
209
VPT
210
VPT
211
VPT
212
NORTH CORRIDOR
214
CORRIDOR
201B
CTP UPGRADE SYSTEMS/ RECURRENT
-24 STUDENTS
219
CTP/ UPGRADE SYSTEMS/ RECURRENT
-24 STUDENTS
218
CTP/ UPGRADE/ SYSTEMS/ RECURRENT
24 STUDENTS
217
VIRTUAL CLASSROOM
216CTP/ UPGRADE/SYSTEMS/ RECURRENT
24 STUDENTS
207
CUH-1
VAV-2-2
VAV-2-1
VAV-2-22
VAV-2-16VAV-2-15 VAV-2-17
VAV-2-14 VAV-2-13
VAV-2-3
VAV-2-20
VAV-2-23
VAV-2-12
VAV-2-19VAV-2-18
VAV-2-11
VAV-2-10
VAV-2-9VAV-2-8VAV-2-7
VAV-2-6
VAV-2-21
VAV-2-5
VAV-2-4
1 1
2
1 1
2
1
2
2
1
2
12
CUH-1
2
2
2
1
1
1
1
2
1
3
3
3 3 3
3
3
3
33
GENERAL NOTES:
REFER TO M-001 FOR ADDITIONAL GENERAL NOTES.
ALL EXPOSED DUCT TO BE PAINT GRIP FINISH.
ALL VAV BOXES MUST BE INSTALLED WITHIN 3'-0" ABOVE CEILING
FOR MAINTENANCE.
REFER TO M-001 FOR INSULATION NOTES.
REFER TO PLUMBING PLANS FOR CONDENSATE PIPING.RD
PE11400027
NENOISS
AL
EFORP D
STATE OF
NI IA N A ERG IN E
SIGE TERE
No.CAMERON T .YAMA
SHITASHEET TITLE
SHEET NUMBER
Kite Realty Group
30 S. Meridian Street, #1100
Indianapolis, Indiana 46204
Owner
Republic Airways Holdings
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect
McComas/O'donnell & Naccarato
Structural Engineer
Mechanical / Plumbing Design/Builder
Civil Engineer
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
KEY PLAN
B
A
HOTEL
PROJECT NO.
SHEET ISSUE
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
TRAINING
CENTER
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
12/17/2021 1:34:32 PMM-202
OVERALL SECOND
FLOOR MECHANICAL
PIPING PLAN
21040.000
Republic Airways
Training Center
12195 N. Meridian St.
Carmel, Indiana
46032
1 PERMIT SET 11/30/21
2 CD SET 12/17/21
12/17/21
3/32" = 1'-0"M-202
1 OVERALL SECOND FLOOR MECHANICAL PIPING PLAN
PLAN NOTES:
1 REFRIGERANT PIPING FROM ABOVE. REFER TO ROOF PLAN FOR
CONTINUATION.
2 REFRIGERANT PIPING DOWN TO SPACE BELOW. REFER TO FIRST
FLOOR PLANS FOR CONTINUATION.
3 CONTRACTOR TO INSTALL REFRIGERANT PIPING AS REQUIRED PER
MANUFACTURERS RECOMMENDATIONS. REFRIGERANT PIPING TO BE
SIZED BY MANUFACTURER. COORDINATE PIPING WITH ALL OTHER
TRADES.
02/23/22