Loading...
HomeMy WebLinkAboutM-203-OVERALL-THIRD-FLOOR-MECHANICAL-PIPING-PLAN-Rev.3DN 1 3 4 5 6 7 8 A B C D E F G H J 7.7 D.8 D.3 3.2 C.7 C.6 A.3 A.4 2 2.4 4.1 6.6 7.4 7.6 7.8 C.8 2.6 2.8 3.3 4.8 5.2 5.8 6.2 6.8 7.2 2.1 1.9 5.6 7 86 5 4 1 H A B C D E F G 2 J 3 RTU-4 RTU-3 FCU-CU-2 FCU-CU-4 CRAC-4 CRCU-3 CUH-1 VAV-3-20 VAV-3-2 VAV-3-19 VAV-3-18 VAV-3-8 VAV-3-1 VAV-3-17 VAV-3-16 VAV-3-15VAV-3-4 VAV-3-3 VAV-3-9 VAV-3-10 VAV-3-12 VAV-3-11 VAV-3-13VAV-3-14 VAV-3-5 RTU-1 CRCU-1 RTU-5 FCU-CU-1 CRCU-1 RTU-2 LOUNGE 315 STORAGE 316 MEN 319 ADA 317 WOMEN 320 GENDER NEUTRAL 321 JAN 322 STAIR 301 CONFERENCE 300 STG 300A TELECOM 303 EAST CORRIDOR 302 OPEN OFFICE - 78 DESKS 304 EVPT 305 EVPT 306 EVPT 307 BRIEF 307B DEBRIEF 307A BRIEF 306B DEBRIEF 306A BRIEF 305B DEBRIEF 305A WEST CORRIDOR 319 SOUTH CORRIDOR 308 CONF 309G STAIR 03 S-003 OFFICE 309D OFFICE 309C OFFICE 309B OFFICE 309A CONF 309E CONFERENCE 309F IN-FLIGHT NEW HIRE 30 STUDENTS 310 IN-FLIGHT NEW HIRE 24 STUDENT 311 IN-FLIGHT NEW HIRE 30 STUDENT 312 IN-FLIGHT NEW HIRE 30 STUDENTS 313 IN-FLIGHT NEW HIRE 30 STUDENTS 314 1 1 11 1 1 1 2 2 2 2 22 2 3 M-500 3 M-500 3 M-500 3 M-500 3 M-500 3 M-500 3 M-500 4 M-500 4 M-500 4 M-500 4 M-500 4 M-500 DS-CU-2 FCU-CU-3 DS-CU-1 DS-3 3 41" CGENERAL NOTES: • REFER TO M-001 FOR ADDITIONAL GENERAL NOTES. • ALL EXPOSED DUCT TO BE PAINT GRIP FINISH. • ALL VAV BOXES MUST BE INSTALLED WITHIN 3'-0" ABOVE CEILING FOR MAINTENANCE. • REFER TO M-001 FOR INSULATION NOTES. • REFER TO PLUMBING PLANS FOR CONDENSATE PIPING.RD PE11400027 NENOISS AL EFORP D STATE OF NI IA N A ERG IN E SIGE TERE No.CAMERON T .YAMA SHITASHEET TITLE SHEET NUMBER Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect McComas/O'donnell & Naccarato Structural Engineer Mechanical / Plumbing Design/Builder Civil Engineer 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 1/13/2022 10:54:55 AMM-203 OVERALL THIRD FLOOR MECHANICAL PIPING PLAN 21040.000 Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 3/32" = 1'-0"M-203 1 OVERALL THIRD FLOOR MECHANICAL PIPING PLAN 1 PERMIT SET 11/30/21 2 CD SET 12/17/21 3 BULLETIN SET 01/13/22 01/13/22 PLAN NOTES: 1 REFRIGERANT PIPING DOWN THROUGH ROOF TO SPACE BELOW. REFER TO SECOND FLOOR PLANS FOR CONTINUATION. 2 CONTRACTOR TO INSTALL REFRIGERANT PIPING AS REQUIRED PER MANUFACTURERS RECOMMENDATIONS. REFRIGERANT PIPING TO BE SIZED BY MANUFACTURER. COORDINATE PIPING WITH ALL OTHER TRADES. 3 REFRIGERANT PIPING DOWN THROUGH ROOF. 4 PUMPED CONDENSATE UP FROM SPLIT SYSTEM UNIT TO CEILING SPACE. ROUTE TO MOP SINK AS SHOWN, TERMINATE OVER SINK AT 1'-0" ABOVE F.F. 02/23/22