RTU-4
RTU-3
FCU-CU-2
FCU-CU-4
CRAC-4
CRCU-3
CUH-1
VAV-3-20
VAV-3-2
VAV-3-19
VAV-3-18
VAV-3-8
VAV-3-1
VAV-3-17
VAV-3-16
VAV-3-15VAV-3-4
VAV-3-3
VAV-3-9
VAV-3-10
VAV-3-12
VAV-3-11
VAV-3-13VAV-3-14
VAV-3-5
RTU-1
CRCU-1
RTU-5
FCU-CU-1
CRCU-1
RTU-2
LOUNGE
315
STORAGE
316
MEN
319
ADA
317
WOMEN
320
GENDER NEUTRAL
321
JAN
322
STAIR
301
CONFERENCE
300
STG
300A
TELECOM
303
EAST CORRIDOR
302
OPEN OFFICE - 78 DESKS
304
EVPT
305
EVPT
306
EVPT
307
BRIEF
307B
DEBRIEF
307A
BRIEF
306B
DEBRIEF
306A
BRIEF
305B
DEBRIEF
305A
WEST CORRIDOR
319
SOUTH CORRIDOR
308
CONF
309G
STAIR 03
S-003
OFFICE
309D
OFFICE
309C
OFFICE
309B
OFFICE
309A
CONF
309E CONFERENCE
309F
IN-FLIGHT NEW HIRE 30 STUDENTS
310
IN-FLIGHT NEW HIRE 24 STUDENT
311
IN-FLIGHT NEW HIRE 30 STUDENT
312
IN-FLIGHT NEW HIRE 30 STUDENTS
313
IN-FLIGHT NEW HIRE 30 STUDENTS
314
1
1
11
1
1
1
2
2
2
2
22
2
3
M-500
3
M-500
3
M-500
3
M-500
3
M-500
3
M-500
3
M-500
4
M-500
4
M-500
4
M-500
4
M-500
4
M-500
DS-CU-2 FCU-CU-3
DS-CU-1
DS-3
3 41" CGENERAL NOTES:
REFER TO M-001 FOR ADDITIONAL GENERAL NOTES.
ALL EXPOSED DUCT TO BE PAINT GRIP FINISH.
ALL VAV BOXES MUST BE INSTALLED WITHIN 3'-0" ABOVE CEILING
FOR MAINTENANCE.
REFER TO M-001 FOR INSULATION NOTES.
REFER TO PLUMBING PLANS FOR CONDENSATE PIPING.RD
PE11400027
NENOISS
AL
EFORP D
STATE OF
NI IA N A ERG IN E
SIGE TERE
No.CAMERON T .YAMA
SHITASHEET TITLE
SHEET NUMBER
Kite Realty Group
30 S. Meridian Street, #1100
Indianapolis, Indiana 46204
Owner
Republic Airways Holdings
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect
McComas/O'donnell & Naccarato
Structural Engineer
Mechanical / Plumbing Design/Builder
Civil Engineer
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
KEY PLAN
B
A
HOTEL
PROJECT NO.
SHEET ISSUE
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
TRAINING
CENTER
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
1/13/2022 10:54:55 AMM-203
OVERALL THIRD
FLOOR MECHANICAL
PIPING PLAN
21040.000
Republic Airways
Training Center
12195 N. Meridian St.
Carmel, Indiana
46032
3/32" = 1'-0"M-203
1 OVERALL THIRD FLOOR MECHANICAL PIPING PLAN
1 PERMIT SET 11/30/21
2 CD SET 12/17/21
3 BULLETIN SET 01/13/22
01/13/22
PLAN NOTES:
1 REFRIGERANT PIPING DOWN THROUGH ROOF TO SPACE BELOW. REFER
TO SECOND FLOOR PLANS FOR CONTINUATION.
2 CONTRACTOR TO INSTALL REFRIGERANT PIPING AS REQUIRED PER
MANUFACTURERS RECOMMENDATIONS. REFRIGERANT PIPING TO BE
SIZED BY MANUFACTURER. COORDINATE PIPING WITH ALL OTHER
TRADES.
3 REFRIGERANT PIPING DOWN THROUGH ROOF.
4 PUMPED CONDENSATE UP FROM SPLIT SYSTEM UNIT TO CEILING
SPACE. ROUTE TO MOP SINK AS SHOWN, TERMINATE OVER SINK AT
1'-0" ABOVE F.F.