Loading...
HomeMy WebLinkAboutP-101A-FIRST-FLOOR-PLUMBING-PLAN---AREA-A-Rev.71 2 COMPUTER ROOM 126 SIM PARTS STORAGE 127 COMPUTER ROOM 128 STAIRS-02 S-002 FUTURE COMPUTER ROOM 125 (14,980 SQ.FT.) 6"ST. 2"FD-1 FCO 2"FD-1 FCO 2"FD-1 2"FD-12"FD-1 2"FD-1 FCO SIM TRAINERS 136 COMPUTER ROOM 129 SIM PARTS STORAGE 130 COMPUTER ROOM 131 COMPUTER ROOM 131 FUTURE COMPUTER ROOM 134 ELECTRICAL 135 87 6 5 4 2 1 A B C D 3 34 FCO (17,489 SQ.FT.) 55BAO -1 AC-1 AF-1 BAO -1 5 BAO -1 5 BAO -15BAO -1 4"FD-1 4"FD-1 4"FD-1 4"FD-1 4"FD-1 FCO 4"FD-14"FD-14"FD-1 4"FD-14"FD-1 4"FD-2 5 BAO -1 AF-1 5 BAO -1 5 BAO -15 BAO -1 4"FD-2 BAO -1 1/2" BA 1/2" BA 1/2" BA 1/2" BA1/2" BA 1/2" BA 1/2" BA1/2" BA 1/2" BA 1/2" BA 1/2" BA 1/2" BA 1/2" BA 1/2" BA 1/2" BA 1/2" BA 1/2" BA 1/2" BA 1/2" A 2 GCO 5 6 1" CW 3/4" CW 3/4" CW (HVAC MAKEUP) (HVAC MAKEUP) 7 7 8 7 7 8 9 10 (HVAC MAKEUP) (HVAC MAKEUP) (HVAC MAKEUP)(HVAC MAKEUP)(HVAC MAKEUP) FCO 1" CW 1" CW 1" CW GENERAL NOTES: 1. PROVIDE NEW DOMESTIC WATER, SANITARY WASTE, STORM DRAINAGE AND NATURAL GAS SYSTEMS FOR THIS BUILDING. PROVIDE ALL NECESSARY COMPONENTS FOR FULLY OPERATIONAL SYSTEM. INSTALL SYSTEMS IN ACCORDANCE WITH STATE REQUIREMENTS AND LOCAL AUTHORITY HAVING JURISDICTION. COORDINATE THE LOCATION OF ALL UTILITY CONNECTION POINTS, FLOOR DRAINS AND HUB DRAINS FOR EQUIPMENT WITH OTHER TRADES. 2. ALL FLOOR PENETRATIONS TO BE SEALED WATER TIGHT AND COMPLETELY PACKED WITH FIRE STOP MATERIAL BY TRADE CONTRACTORS. 3. ALL PENETRATIONS THROUGH FIRE RESISTANCE RATED CONSTRUCTION SHALL BE PROVIDED A UL LISTED THROUGH PENETRATION FIRESTOP ASSEMBLY. THE RATINGS OF ALL FIRESTOP ASSEMBLIES SHALL BE GREATER THAN OR EQUAL TO THE RATING OF THE PENETRATED BARRIER. 4. CORE DRILL PENETRATIONS IN CONCRETE FLOORS OR WALLS 1-2 INCHES LARGER THAN THE PIPE DRIAMETER OF THE PENETRATING PIPE. 5. NO STURCTURAL MEMBERS SHALL BE CUT, DRILLED OR BURNED WITHOUT THE KNOWLEDGE AND WRITTEN APPROVAL OF OWNER. 6. CONTRACTOR SHALL PROVIDE LABELS (WITH FLOW ARROWS) FOR ALL PIPING. 7. MAINTAIN MAIXIMUM HEADROOM AT ALL LOCATIONS. ALL PIPING TO BE AS TIGHT TO THE UNDERSIDE OF DECK AS POSSIBLE. ALL EXPOSED PIPING SHALL BE APPROVED BY ARCHITECT AND SHALL MAINTAIN REQUIRED CLEARANCES. 8. STORM AND SANITARY PIPING ARE TO BE INSTALLED SLOPED AT CODE ALLOWABLE SLOPES. 9. ALL PVC PIPING IN OPEN AIR PLENUMS SHALL BE INSULATED AND WRAPPED TO MEET 25/50 FLAME SMOKE RATING REQUIREMENT. RD PE11400027 NENOISSAL EFORP D STATE OF NI IA N A ERGIN E SIGE T ERE No.CAMERON T .YAMA SHITASHEET TITLE SHEET NUMBER Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect McComas/O'donnell & Naccarato Structural Engineer Mechanical / Plumbing Design/Builder Civil Engineer 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 12/17/2021 1:45:11 PMP-101A FIRST FLOOR PLUMBING PLAN - AREA A Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 1/8" = 1'-0"P-101A 1 FIRST FLOOR PLUMBING PLAN A # PLAN NOTES 1 8" STORM CONDUCTOR. 2 8" STORM CLEANOUT. 3 10" STORM FROM ABOVE. 4 10" STORM DOWN IN VOID SPACE TO BELOW SLAB. 5 1/2" BREATHING AIR DOWN TO OUTLET. 6 8" STORM DOWN TO BELOW SLAB 7 3/4" COLD WATER DOWN TO MECHANICAL EQUIPMENT. 8 CAP 3/4" COLD WATER AT THIS LOCATION FOR FUTURE CONNECTION TO MECHANICAL EQUIPMENT.. 9 1" COLD WATER HVAC MAKEUP TO ABOVE. 10 1" COLD WATER HVAC MAKEUP FROM ABOVE. 2 PERMIT SET 11/30/21 3 CD SET 12/17/21 12/17/21 02/23/22