HomeMy WebLinkAboutP-101B-FIRST-FLOOR-PLUMBING-PLAN---AREA-B-Rev.8MMP-400
1
1 2
3
(11,791 SQ.FT.)
(8,735 SQ.FT.)
4"FCO
4"FD-2 4"FD-2 4"FD-2
4"FCO
8"ST FCO
MAINTENANCE 32 STUDENT
112
MAINTENANCE LARGE EQUIPMENT
TRAINING
111
100 PERSON AUDITORIUM
106
MAINTENANCE 30 STUDENT
113
ACCESS CORRIDOR
115
DELIVERY
116
TRASH
117
WATER SERVICE
117A
60 PERSON CLASSROOM
118
LOUNGE
114
COMMUNITY CENTER LAB
107A
LOCKED CABIN TRAINER STG
107B
SOUTH CORRIDOR
104
WOMEN
121
MEN
120
ADA
119
GENDER NEUTRAL
122
COMPUTER ROOM
126
SIM PARTS STORAGE
127
COMPUTER ROOM
128
STAIRS-02
S-002
FUTURE COMPUTER ROOM
125
ENTRY STAIR
101
CABIN TRAINER SUPPORT SPACES
102
?
?
NORTH CORRIDOR
110
5 6
(17,201 SQ.FT.)
1
2
8" ST
1" HW
1" HWR
1" HW
2"FD-12"FD-12"FD-1
FCO
8765421
H
D
E
F
G
3
I
3" CW
FCO
P-101B
2
FCOBAO -1
AF-1
BAO -1
BAO -1
BAO -1
4"FD-2
BAO -1
1/2" BA
1/2" BA
1/2" BA1/2" BA
1/2" BA
1/2" BA
8"ST FCO
GCO
GCO
3/4" CW
(HVAC MAKEUP)(HVAC MAKEUP)
7
7
8
9
(HVAC MAKEUP)
(HVAC MAKEUP)
9
4" G
4" G
(2 PSI)
(2 PSI)
(2 PSI)
(2 PSI)
4" G
4" V
4" V
4" V
4" V1" CW1" CW
1" CW
1" CW1" CW1" G
1" G
1" G
1" G
1" G
(2 PSI)
(2 PSI)(2 PSI)
(2 PSI)
(2 PSI)
WH-1
3/4" CW
3/4" CW
3/4" CW
3/4" CW
(HVAC MAKEUP)11
1 3 4 5 6 7 8
D
E
F
G
H
J
7.7
D.8
D.3
3.2
C.7
2 2.4 4.1 6.6 7.4 7.6 7.8
C.8
2.6 2.8 3.3 4.8 5.2 5.8 6.2 6.8 7.2
2.1
1.9 5.6
FCO
FCO
AC-1
GENERAL NOTES:
1. PROVIDE NEW DOMESTIC WATER, SANITARY WASTE, STORM
DRAINAGE AND NATURAL GAS SYSTEMS FOR THIS BUILDING. PROVIDE
ALL NECESSARY COMPONENTS FOR FULLY OPERATIONAL SYSTEM.
INSTALL SYSTEMS IN ACCORDANCE WITH STATE REQUIREMENTS AND
LOCAL AUTHORITY HAVING JURISDICTION. COORDINATE THE
LOCATION OF ALL UTILITY CONNECTION POINTS, FLOOR DRAINS AND
HUB DRAINS FOR EQUIPMENT WITH OTHER TRADES.
2. ALL FLOOR PENETRATIONS TO BE SEALED WATER TIGHT AND
COMPLETELY PACKED WITH FIRE STOP MATERIAL BY TRADE
CONTRACTORS.
3. ALL PENETRATIONS THROUGH FIRE RESISTANCE RATED
CONSTRUCTION SHALL BE PROVIDED A UL LISTED THROUGH
PENETRATION FIRESTOP ASSEMBLY. THE RATINGS OF ALL FIRESTOP
ASSEMBLIES SHALL BE GREATER THAN OR EQUAL TO THE RATING OF
THE PENETRATED BARRIER.
4. CORE DRILL PENETRATIONS IN CONCRETE FLOORS OR WALLS 1-2
INCHES LARGER THAN THE PIPE DRIAMETER OF THE PENETRATING
PIPE.
5. NO STURCTURAL MEMBERS SHALL BE CUT, DRILLED OR BURNED
WITHOUT THE KNOWLEDGE AND WRITTEN APPROVAL OF OWNER.
6. CONTRACTOR SHALL PROVIDE LABELS (WITH FLOW ARROWS) FOR ALL
PIPING.
7. MAINTAIN MAIXIMUM HEADROOM AT ALL LOCATIONS. ALL PIPING TO
BE AS TIGHT TO THE UNDERSIDE OF DECK AS POSSIBLE. ALL
EXPOSED PIPING SHALL BE APPROVED BY ARCHITECT AND SHALL
MAINTAIN REQUIRED CLEARANCES.
8. STORM AND SANITARY PIPING ARE TO BE INSTALLED SLOPED AT CODE
ALLOWABLE SLOPES.
9. ALL PVC PIPING IN OPEN AIR PLENUMS SHALL BE INSULATED AND
WRAPPED TO MEET 25/50 FLAME SMOKE RATING REQUIREMENT.
8
H
I
1" HW
1" HWR
3/4" HW
3/4" CW
4"FD-2
FCO
DWH-1
TMV-1
RPZ-3
RPZ-2
RPZ-1
DWM -2
DWM -1
3"CW
1" CW
2" CW
RCP-1
4
7
8
4"FD-2
ET-1
1" CW
RPZ-4
(HVAC MAKEUP)
(HVAC
MAKEUP)
10
8
H
J
7.7
1" CW
1" CW
1" HWR
1" HW
4" G
1" CW
RD
PE11400027
NENOISSAL
EFORP D
STATE OF
NI IA N A ERGIN E
SIGE T ERE
No.CAMERON T .YAMA
SHITASHEET TITLE
SHEET NUMBER
Kite Realty Group
30 S. Meridian Street, #1100
Indianapolis, Indiana 46204
Owner
Republic Airways Holdings
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect
McComas/O'donnell & Naccarato
Structural Engineer
Mechanical / Plumbing Design/Builder
Civil Engineer
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
KEY PLAN
B
A
HOTEL
PROJECT NO.
SHEET ISSUE
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
TRAINING
CENTER
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
1/13/2022 3:08:46 PMP-101B
FIRST FLOOR
PLUMBING PLAN -
AREA B
Republic Airways
Training Center
12195 N. Meridian St.
Carmel, Indiana
46032
1/8" = 1'-0"P-101B
1 FIRST FLOOR PLUMBING PLAN B
# PLAN NOTES
1 8" STORM FROM ABOVE
2 8" STORM DOWN TO BELOW SLAB
3 SEE ENLARGED PLAN FOR WORK IN THIS AREA (P-400)
4 4" VENT UP FROM BELOW SLAB
5 10" STORM FROM ABOVE.
6 10" STORM DOWN IN VOID SPACE TO BELOW SLAB.
7 3" DOMESTIC COLD WATER SERVICE UP FROM BELOW SLAB
8 1" IRRIGATION UP FROM BELOW SLAB
9 4" GAS MAIN UP.
10 PROPOSED GAS METER LOCATION. GAS METER CAPABLE OF
4,357,320 BTU/HR.
11 3/4" COLD WATER UP TO FLOOR ABOVE.
1/4" = 1'-0"P-101B
2 ENLARGED WATER SERVICE ROOM PLUMBING PLAN
2 PERMIT SET 11/30/21
3 CD SET 12/17/21
4 BULLETIN SET 01/13/22
01/13/22
4
4
02/23/22