Loading...
HomeMy WebLinkAboutP-102B-SECOND-FLOOR-PLUMBING-PLAN---AREA-B-Rev.7P-400 2 (17,489 SQ.FT.) 3 1 2 (11,791 SQ.FT.) 1 2 4 5 CTP/ UPGRADE/SYSTEMS/ RECURRENT 24 STUDENTS 207 VIRTUAL CLASSROOM 216 CTP/ UPGRADE/ SYSTEMS/ RECURRENT 24 STUDENTS 217 CTP/ UPGRADE SYSTEMS/ RECURRENT - 24 STUDENTS 218 CTP UPGRADE SYSTEMS/ RECURRENT - 24 STUDENTS 219 FLIGHT OPS 48 PEOPLE 220 FLIGHT OPS 48 PEOPLE 221 VPT 208 DEBRIEF 208A BRIEF 208B DEBRIEF 209A BRIEF 209B DEBRIEF 210ABRIEF 210B DEBRIEF 211A BRIEF 211B DEBRIEF 212A BRIEF 212B VPT 212 VPT 211 VPT 210 VPT 209 LIFT CLASSROOM - 30 PEOPLE 202 CTP/ UPGRADE/ SYSTEMS/ RECURRENT 28 STUDENTS 203 ELEC 203A OBSERVATION PLATFORM 201A STAIR/ ENTRY 201 MEN 223UNISEX 222 UNISEX 225 WOMEN 224JAN 226 STAIR/ ENTRY 201 ? ? NEW HIRE FLIGHT OPS 40 STUDENT ROOM 205 1 2 (4,775 SQ.FT.) (3,358 SQ.FT.) (8,433 SQ.FT.) 7 8 (3,085 SQ.FT.) (8,735 SQ.FT.) 10" ST 8" ST 8" ST 8" ST C.O. (14,127 SQ.FT.) (3,362 SQ.FT.) 6 6" ST 87 6 5 4 2 1 H D E F G 3 I 9CO 4" ST 6" ST 8 1" CW 10 4" G (2 PSI) 4" G(2 PSI) 11 2 1 2 2 1 1 2 1 (900 SQ.FT.) (1,100 SQ.FT.) 4" ST 4" ST 4" ST 4" ST 4" ST 6" ST 6" ST 6" ST 4" ST (1,775 SQ.FT.) (1,775 SQ.FT.) 4" ST 4" ST 6" ST (1,000 SQ.FT.) 6" ST 4" ST 4" ST 4" ST 4" ST 6" ST 6" ST 8" ST 6" ST 6" ST 8" ST 8" ST8" ST 3/4" CW 3/4" CW 12 13 GENERAL NOTES: 1. PROVIDE NEW DOMESTIC WATER, SANITARY WASTE, STORM DRAINAGE AND NATURAL GAS SYSTEMS FOR THIS BUILDING. PROVIDE ALL NECESSARY COMPONENTS FOR FULLY OPERATIONAL SYSTEM. INSTALL SYSTEMS IN ACCORDANCE WITH STATE REQUIREMENTS AND LOCAL AUTHORITY HAVING JURISDICTION. COORDINATE THE LOCATION OF ALL UTILITY CONNECTION POINTS, FLOOR DRAINS AND HUB DRAINS FOR EQUIPMENT WITH OTHER TRADES. 2. ALL FLOOR PENETRATIONS TO BE SEALED WATER TIGHT AND COMPLETELY PACKED WITH FIRE STOP MATERIAL BY TRADE CONTRACTORS. 3. ALL PENETRATIONS THROUGH FIRE RESISTANCE RATED CONSTRUCTION SHALL BE PROVIDED A UL LISTED THROUGH PENETRATION FIRESTOP ASSEMBLY. THE RATINGS OF ALL FIRESTOP ASSEMBLIES SHALL BE GREATER THAN OR EQUAL TO THE RATING OF THE PENETRATED BARRIER. 4. CORE DRILL PENETRATIONS IN CONCRETE FLOORS OR WALLS 1-2 INCHES LARGER THAN THE PIPE DRIAMETER OF THE PENETRATING PIPE. 5. NO STURCTURAL MEMBERS SHALL BE CUT, DRILLED OR BURNED WITHOUT THE KNOWLEDGE AND WRITTEN APPROVAL OF OWNER. 6. CONTRACTOR SHALL PROVIDE LABELS (WITH FLOW ARROWS) FOR ALL PIPING. 7. MAINTAIN MAIXIMUM HEADROOM AT ALL LOCATIONS. ALL PIPING TO BE AS TIGHT TO THE UNDERSIDE OF DECK AS POSSIBLE. ALL EXPOSED PIPING SHALL BE APPROVED BY ARCHITECT AND SHALL MAINTAIN REQUIRED CLEARANCES. 8. STORM AND SANITARY PIPING ARE TO BE INSTALLED SLOPED AT CODE ALLOWABLE SLOPES. 9. ALL PVC PIPING IN OPEN AIR PLENUMS SHALL BE INSULATED AND WRAPPED TO MEET 25/50 FLAME SMOKE RATING REQUIREMENT.RD PE11400027 NENOISSAL EFORP D STATE OF NI IA N A ERGIN E SIGE T ERE No.CAMERON T .YAMA SHITASHEET TITLE SHEET NUMBER Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect McComas/O'donnell & Naccarato Structural Engineer Mechanical / Plumbing Design/Builder Civil Engineer 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 12/17/2021 1:45:36 PMP-102B SECOND FLOOR PLUMBING PLAN - AREA B Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 1/8" = 1'-0"P-102B 1 SECOND FLOOR PLUMBING PLAN B # PLAN NOTES 1 4" STORM UP TO OVERFLOW ROOF DRAIN. 2 4" STORM UP TO ROOF DRAIN 3 8" STORM DOWN ALONG COLUMN 4 8" STORM DOWN IN VOID SPACE 5 SEE ENLARGED PLAN FOR WORK IN THIS AREA (P-400) 6 10" STORM DOWN IN VOID SPACE. 7 6" STORM UP TO ROOF DRAIN. 8 6" STORM UP TO OVERFLOW ROOF DRAIN 9 4" STORM TO CONNECTOR BRIDGE. 10 11 4" GAS MAIN FROM BELOW. 12 3/4" COLD WATER UP. 13 3/4" COLD WATER FROM BELOW. 2 PERMIT SET 11/30/21 3 CD SET 12/17/21 12/17/21 02/23/22