TOWNHOMES
A REQUEST FOR ADLS/DEVELOPMENT PLAN APPROVAL
DOCKET No. 05120012
SUBMITTED TO:
THE CITY OF CARMEL, INDIANA
PLAN COMMISSION - SPECIAL STUDIES COMMITIEE
FEBRUARY 7,2006
SUPPLEMENTAL COMMITTEE- BROCHURE
Note:
This is a supplemental brochure which includes updated and/ or revised
drawings and exhibits. Please bring this brochure and the original
brochure from the January 17th meeting to the Special Studies Committee
meeting on February 7, 2006.
PETITIONER:
BUCKINGHAM PROPERTIES, INC.
ATTORNEY:
NELSON & FRANKENBERGER
SARA C. NASUTI
DEVELOPMENT MANAGER
333 N. PENNSYLVANIA STREET, 10TH FLOOR
INDIANAPOLIS, IN 46204
(317) 974-1234 EXT. 232
(317) 974-1238 FAX
JAMES E. SHINAVER
3105 E. 98TH STREET, SUITE 170
INDIANAPOLIS, IN. 46280
(317) 844-0106
(317) 846-8782 FAX
ENGINEER:
EMH&T
RICHARD KELLY
7400 NORTH SHADELAND AVENUE, SUITE 150
INDIANAPOLIS, IN 46250
317-913-6930
(317) 913-6928 FAX
o
o
o
D
o
o
o
o
o
o
o
o
D
D
o
o
o
D
o
TABLE OF CONTENTS
1. Explanation
2. Commitment regarding building materials
3. Revised landscape plan regarding landscaping and buffering along northern property line
4. Drainage explanation
5. Cool Creek trail extension - construction timeline
o
o
D
D
o
D
o
o
o
o
D
D
o
D
Q
o
o
D
o
ARDEN TOWNHOMES
SUPPLEMENTAL BROCHURE - EXPLANATION
The following supplemental materials are provided to address questions raised by Plan
Commission members at the ftrst reading for the Arden Townhomes ADLSjDevelopment
Plan on January 17, 2006. In particular, this brochure includes information pertaining to
building materials, drainage, landscaping, and the construction of the Cool Creek trail
extension.
Please bring this brochure as well as the original brochure from the January 17th
meeting to the Special Studies Committee meeting on February 7, 2006.
The site, approximately 12.72 acres, is located on the north side of Smokey Row Road (136th
Street), to the east of Rangeline Road and bordered by the Carmel High School football
stadium to its east and Cool Creek to its west. The site was rezoned to the Arden Planned
Unit Development District on November 21, 2005. We are now seeking
ADLSjDevelopment Plan approval and Primary Plat approval for the site. As planned, the
project consists of ninety (90) townhomes oriented around landscaped amenity areas. The
site will also have a direct connection to the planned Cool Creek trail, a portion of which will
be constructed by the Developer in conjunction with the construction of the Arden
Townhomes.
Respectfully submitted,
Sara C. Nasuti
Development Manager
Buckingham Companies
E:J
EJ
CJ
I::J
CJ
t:::J
CJ
-=:J
I::J
-=:I
E::I
I=:J
CJ
CJ
~
t::l
I=:J
-=:J
I:::J
I /"ORTll UNE S 1/2 - SW 1/4
r 'Ee "-"H-.,
Arden Townhomes
Exhibit "B"
~\
---L
/,
/
1
1
I
I
I
\:
,I
}
1
I
1
I
~
DB ~47, PC 336
NOTE:
'i\lLPAVlNG WITHIN THE EXISTING ANp PROPOSED CtTYRIGKT..of.WAY SHA.U.. CONFORM TO THE
ReQUIREMENTS OFTHE DEPARTMEN'!' OF eNGINEERING. HE COHTRACTOR S~ CONTACT TIE
DEMRTMENT OF ENGINEERING TO SCrEOULE A PRe.CONSTRUCTION MEETING TO REVI~W rH!:
DEPARTMENTS CONSTRUCTION REQuIREMENTS, STAF"F NOTIFICATION REQUIReMeNTS, ReQUIRED
INSPECTIONS AND 1~ OEPARTMENl'S AUTHORITY AS IT RELATESTO'MJRK WlTHlN TIoE EXISTING
AND PROPO$EOCIlY R!Gr<<.QF.WAY
~
t': ' "
I
{iSO<.
(
l:
Full Brick
Jono D. & Paulo 1.1 t.icRill
lnstr. No. 9865601
............
First Floor Brick
I::J I::J 1:::1 E::l E:J E:l r::J E:l E:l -=:J E:J E::I I:::J I::J K:::J I::J I::J I::] c:J
""'~s
i !'i Ii
Side Elevation - 1 st Floor Brick
Jlt) ~
~ .' h.., !"
~6_--.~-.-;1
t,.........f
.
'l' :! .. '~1 ~.
1"'--------
. .
a
~
~
Side Elevation - Full Brick
(Buildings 1 and 7)
~.'
Rear Elevation
Arden Townhomes
Building Type 1 (rear load garages)
Ryland Homes
Buckingham Companies
c:J1:::J1!::l1::J1:::lE:JEJI=:JE:JI:=:J-=:J.:J-=:Jt::JI:::Jt=Jr::JI::JCJ
~
a
Side Elevation - 1 st Floor Brick
I Ii:i
Arden Townhomes
Building Type 2 (front load garages)
Ryland Homes
Buckingham Companies
o
o
D
D
D
o
o
D
D
o
D
o
o
D
D
D
D
D
o
DRAFT
COMMITMENTS CONCERNING THE USE
AND DEVELOPMENT OF REAL ESTATE
Buckingham Properties, Inc. (hereafter, "Buckingham"), is the contract purchaser of the
real estate located in Hamilton County, Indiana, and said real estate is described in what is
attached hereto and incorporated herein by referenced as Exhibit "A" (the "Real Estate"), and
Buckingham makes the following Commitments (the "Commitments") to the Plan Commission
of the City of Carmel, Indiana (the "Plan Commission") for the Arden Planned Unit
Development Ordinance.
Section 1. Cross Reference. These Commitments are made in connection with the approval
obtained under Docket Number 05120012 DP/ADLS.
Section 2.
reference:
Exhibits. The following exhibits are attached hereto and incorporated herein by
Exhibit "A". Attached hereto and incorporated herein by reference as Exhibit "A" is the
legal description ofthe real estate (the "Real Estate");
Exhibit "B". Attached hereto and incorporated herein by reference as Exhibit "B" is the
site plan (the "Site Plan") for the Arden Planned Unit Development;
Section 3. Defmitions. Different words and terms are defined throughout these
Commitments and, further, the following definitions shall apply throughout these Commitments:
1. Developer. The term "Developer" shall mean and refer to Buckingham and its successors
and assigns.
o
o
D
D
o
o
o
o
o
o
D
o
o
o
o
o
o
o
o
Section 4. Commitments. The Developer agrees and commits to the following:
1. The Developer agrees that for all Townhome units shown on Exhibit B that contain a red
solid line on the building elevation, that said building elevation shall be constructed of
full brick on all levels of the Townhome building unit, excluding windows, trim, soffits,
doors, gables, roofs, and garage doors.
2. The Developer agrees that for all Townhome units shown on Exhibit B that contain a
blue dashed line, that said building elevation shall be constructed of full brick on only the
first floor of the Townhome building unit, excluding windows, trim, soffits, doors,
gables, roofs, and garage doors.
Section 5.
Binding on Successors
These Commitments are binding on the Developer, owner of the Real Estate, each subsequent
owner of the Real Estate, and each other person acquiring an interest in the Real Estate, unless
modified or terminated by the Plan Commission. These Commitments may be modified or
terminated only by a decision of the Plan Commission after a public hearing wherein notice as
provided by the rules of the Plan Commission has been made. The provisions of this paragraph 5
notwithstanding, these Commitments shall terminate as to any part or parts of the Real Estate
hereafter reclassified (rezoned) from Ordinance No. Z-482-05 on the City's Official Zone Map to
another zoning classification.
Section 6.
Effective Date
The Commitments contained herein shall be effective upon the occurrence of all of the following
events:
1. The approval by the Plan Commission of Docket No. 05120012 DP/ADLS;
2. The acquisition of the Real Estate by the Developer or its successors and assigns; and
3. The commencement of the development of the Real Estate in accordance with the
assignment of the requested Arden PUD classification pursuant to Ordinance No. Z-482-
05 and ADLS/DP approval under Docket No. 05120012.
Section 7.
Recording
The undersigned hereby authorizes the Secretary of the Plan Commission to record these
Commitments in the Office of the Recorder of Hamilton County, Indiana.
2
D
D
o
D
D
o
D
D
D
D
o
D
D
o
o
D
D
o
o
Section 8.
Enforcement
These Commitments may be enforced by the Plan Commission, Indiana and any property owner
within or immediately adjacent to the Real Estate.
IN WITNESS WHEREOF,
executed as of the date written below.
has caused these Commitments to be
BUCKINGHAM PROPERTIES, INC.
By:
David E. Leazenby, Vice President
STATE OF INDIANA )
) SS:
COUNTY OF MARION )
Before me the undersigned, a Notary Public in and for said County and State, personally
appeared David E. Leazenby, the Vice President of Buckingham Properties, Inc., and having
been duly sworn, acknowledged execution of the foregoing Commitments.
Witness my hand and Notarial Seal this
day of
,2006.
My Commission Expires:
Notary Public
Residing in
County
Printed Name
Prepared By: James E. Shinaver, Nelson & Frankenberger, 3105 East 98th Street, Suite 170,
Indianapolis, IN 46280.
H:\brad\Buckingham\Arden\BrickComrnittmentsO 12506.doc
3
FENCE TO EXTEND e' BEYOND T~E LENGT~
Cl' T~E T OWNHCME lJ'.IT
",' Hr;~ SHADOWBOX FENCE OF TREATED MATERIAL
FENCE TO BE SET BACK q Cff Cl' NORT~ MOST SETB
Of THE TOWN~Ct1E lJ'.IT
7 AUlUMN BRLLlANCE (R), APPLE SER\lk:EBERRY
Amelordier x gradfloro Autumn Br~li<r<:e' PlPolNo.5717
5-C:;'c1.
21 GOLDFLAME SARAEA
Spiraea x bumoIdo 'Goldflcrre' (S.x 'Goldflcme')
3 gal
o
D
D
D
D
D
D
D
D
o
D
D
D
D
o
D
o
o
o
35 ~ETZ MDGET ARBORVITAE
ThJ jo occoontdis 'I-Ietz I'1dget'
3 g:>l
~
Q
ARDEN TOVvNHOME DEVELOPMENT
Building 11 Screening Pion
1.22.06 Scale 1" 30' - 0"
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
D
o
11III
Evans, Mechwart, Hambleton & Tilton, Inc.
Engineers. Surveyor.;, Planners, Scientists
January 24, 2006
Ms. Sara Nasuti, Development Manager
Buckingham Companies
333 North Pennsylvania Street, 10th Roor
Indianapolis, Indiana 46204
RE: Arden Townhomes Drainage Design Clarification
Dear Nasuti:
The purpose of this letter is to respond to a question posed by the Carmel Plan Commission
during the First Reading for Arden Townhomes ADLSIOevelopment Plan approval at its meeting
on January 17, 2006. Specifically, a question was posed regarding the design of the proposed
stormwater detention facility to be located in the floodplain of Cool Creek and how this facili1y
would function in relation to the flood stages of the creek.
As shown on the development plan on file, the stormwater management system for Arden
includes three detention areas to comply with the drainage requirements of the City. The
development plan indicates that all three detention areas will be "wet ponds.. That is, they will
retain water at a permanent pool level at all times. However, after discussions with the Hamilton
County Soil and Water Conservation District and the City Engineer's Office during the T AC
review process, and subsequent to further analysis of the soil conditions and flood stages in the
flood plain of Cool Creek, the design of Pond #3 has been revised in the final construction plans
for Arden. In lieu of a wet pond, detention area #3 will be a dry basin designed to temporarily
hold water only during a storm event. This design revision was made based upon the sandy soil
conditions in the floodplain and the associated expected difficulty that will be encountered in
trying to retain a permanent pool depth.
The proposed dry basin will be connected to the creek via a single outlet pipe. The top of dam
elevation along the south side (creek side) of the dry basin is established at an elevation of
805.0 with the base flood (100-year) elevation of the creek being 806.0 per current FIRM
. mapping. Thus, when the creek flood stage exceeds an elevation of 805.0, expected to occur
during an approximate 50-year storm event, floodwaters from the creek will enter the dry basin
by overtopping the dam. During other lower frequency storm events, backwater from the creek
may flow into and out of the dry basin through the outlet pipe connecting the basin to the creek.
This design allows temporary detention to be provided for on-site runoff with a controlled
release, while also allowing flood waters to enter and exit the basin via the outlet pipe. This is
very typical of many detention ponds, whether or not located in a floodplain, where the
downstream channel may have flood elevations that are higher than the flood elevations
imparted within the detention basin from its contributing watershed.
The design revision from a wet pond to a dry basin will also significantly reduce the
maintenance requirements for the Home Owner's Association since debris that may flow into
MCMXXVI
7400 North Shadeland Avenue. Suite 150. Indianapolis. IN 46250 . Phone 317.913.6930 . Fax 317.913.6928
Columbus. c:ir"cnnoti . Indianop:>.k . Charlotte
emht.com
o
o
o
D
D
o
o
o
D
o
o
o
o
D
D
o
D
o
o
Ms. Sara Nasuti
Buckingham Companies
Arden Townhomes
January 24, 2006
Page 2
the basin from the creek will not have a detrimental effect on its hydraulics or appearance. The
basin will be planted with native grasses that will not require regular mowing, also reducing the
maintenance burden.
We trust that the infonnation provided herein adequately addressed the concerns raised at the
Plan Commission meeting regarding this Issue. However, should you require any additional
information or wish to discuss the design of the stormwater management system for Arden in
more detail, please do not hesitate to contact our office.
Respectfully Submitted,
ambleton & Tilton, Inc.
I
.
.
i/_IN.,n-_1/4
r lIB: 18-1_
:
.
.
,
------~~~~~---------------~
_______________ Instr. No. 9226597 \
,
1ZASPIW,.TPA'TH
---------------------------
John 0 It: Paula M Mcl~iU
Inslr. No. 9865601
lIlUIH IN .. 1/4
IE 18-1_
-..... ---
Town Df Carmel
06 147. PG 336
NaTE:
AU:"PAVlNG WITHIN THE EXISTING AND PROPOSED CnY RIGHT.QF.WAY SHALL CONFORM TO THE
REQUIREMENTS DF THE DEPARTMENT OF ENGINEERING. THE CllN1RACTllR SHALL CONTACTTHE
DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-coNS1RUCTION MEETING TO REVlEWTHE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS. STAFF NOTIFlCI\T1ON REQJIRSAENTS. REQJIRED
INSPECTIONS AND THE DEPARTMENT'S AUTHORnY /IS IT RaATES TO WORK WITHIN THE ElCISTING
AND PROPOSED CnY RIGHT .QF.WAY.
~
---
tSLa' PAVEMENT SECT10N PER PlAN I
"'t~FERPlAN rPA""""" "''''FERPlAN :
SITE DATA
8IGN LEGEND
SYMBa. DESCRIPTIal NUMBER
REQUIRED
@) STOP 4
@) STREET NAME
@ COMBINED STREET 2
NAME AND STOP SIGN (INCLUDED
IN AIlCI\/E
COUNT)
LEGEND
IIlilIClI'1IlII IIlE 1'ftlE / S'/IBl.
IlEliIla'IIlI
8laLDIllO DATA
....... "'".
y.ulllft .
.......... I
8-41lIrra . I
TOTAL. u.rs... II
--
. .......-........
....... ",-p.",
==;.:lto.~
.............. a.-.a . ....... ,.....
__ I
T............... WIIII_.....,....... 438
....... ....... ......... .4.81 ...... ..... ad
I
I
IIlE 1'ftlE / S'/IBl.
TYPICAl. PRNATE STREET SECTION
TWOJNAV \l'tnH PARAUa PARICDG
D-D
-
.' PARKING
---
-..-
--
--
--
CONCRETE rJRNFNAY
PER PUIH
CONPACrED 8UUH\DE
,..
,..
..
...
TYPICAl. PRIVATE ALLEY SECTION
A-A
IllL
(!)
..Ap. *~
~I-
A port oftho_Quor\erofSedion 19. Town"'lp 18_. Range 4 Eost. of1l11_ PlindpIII
Morfdlon.ln aoyT_p, HomD1on Coun\Y.lndl"" men~lII1yd_.._
CarnmoI1cIng It tho sou1h_ _ of said quortllr _; _ Nor1h 90 dog.... 00 rri...- 00
_dB Eost (I""""" beolirG) oIang 111. south 1M of _ q.....lI8Clian IlXI8.3O 1_10 I paint In 1ha
ClO1lBr cI Cool CI1IIk.,d 111. POINT OF BEGINNING of 1I11s dlllafpllan; 111.... Norlh IlO Dogroos 00
miII_ 00 _ East oIarCI said 8DUIh 1M 386.00 faot \0 111. _11n. cllnd ofond _In ell
283. PG:MO In 111. 0Ill.. of 111. _.of_ _ ClllJnly; 111.... Nar1h 00 dogr.- 01 _47
_dB East oIang _ _ Bna 1368.60 l_lOtho norlh_ _ clsald 1nIct cllond; __ IlO
dog.... 00 rri...- 00 _dB _ _g 111. north Bna of __ of lend 208.ll5 fool 10 1ha
_111_ 1M of1l1.lnclonllmlon TnIclIan ~ ('tllT') rtght..r_ (said 1M bIIng 33fool~
poraIlII I_tom 1ha _ Una of _ rtght..r_); 111.... Sou1h 88 d8gr0as:l4 miII_ 64......
West along saij BOOttl88Sl:tm Ine 201.00 feet to the sauthw8st com. of1he west &bu1rnInt dh PJT
blfdge r:NfK Cool Qeol<; _ SouI/113 dog.... 43 rril1l1BS 117 _dB W1B1511.liO 1_10 I paint In 1ha
ClO1lBr of Cool CI1IIk; _ ..-d8Itng said __ of Cod CI1IIk 1ha lallowIng ...... CllUl88ll;
I) Sou1h 22 dog.... 00 rrinu180 00 _dB Eosl 140.00 IlIIt;
2) Sou1h 09 dog.... 00 rrinu180 00 _dB East 100.00 fall;
3) SouI/128 dog.... 00 _ 00 _dB East 300.00 IlIIt;
4) SouI/1 03 dlgnlll 00 _ 00 _dB East 60.00 fall;
5) SouI/13O dog.... 00 rrinu180 00 _dB _ 88.00 fool;
8) SouI/119 dog.... 00 rrinul8s 00 _dB WIB1 100.00 fall;
7) SouI/1l17 dog.... 00 _ 14 _dB East 10.94 fool
to 111. poInIclboglnring. oontaIring 12.721_ mencr__
HlOO 882 .1'1
CALL TOLL FREE
1-8OC)..as IS2DO
FOR CALLS OUTSIJEaF NlI'*.
lYPICAL PRIVATE ALLEY SECllON WITH CURBS
B-B
fPA"""""
24' BACKTO
PA"""""
1t.5'-t2DfIVE lANE PER PlAN
I
,\
Q!J......IMTA
~r:TAFNCHfooURK:
=~=-mbtc:.on~nar::=:.. ~.~~!1IlIIhml-*cld.uaua"'d
El -1l7.52,.cM)11131)
"'iOL!Y UOLEY "8Al'SCAU..
AT LEAST lWOfUJ.
W DAYSBEFORE
YOU .Il:IJI&la:L.
fdlB"
,'PAAKDG
CONCRETE DRNEWAY
PER PlAN
TYPICAl. PRNATE STREET SECTION
TWOWAY
E-E
TYPICAL PRIVATE SlREET SECllON
OtE-WA,y 'Nmt PARAll.I!l. PAIICItG
~
~
o
:!
~
ill
'"
=
a
II
III
f
III
L
~
a..
&
<( (f) ~
::2 W~
a: ~ 1!;
a.. :::c g
- Z-::>
~~~ ~
~ ~ i
z w ~
w C..i
::2 a::: ~w
a.. <(
o
...J
W
[ij
o
z
j
D.
1&1
...
;;
EMH&T Jell NO.
21J06.2281
OA; .
11-1&<]5
1".6(7
- -
SHEET ND.
C2.0
o
D
o
D
D
o
o
D
D
o
D
o
D
o
D
D
o
o
o
II
BUCKINGHAM
COMPANIES
January 27, 2006
City of Carmel
Plan Commission
Special Studies Committee
One Civic Square
Carmel, IN 46032
Re: Arden Townhomes - Cool Creek Trail Extension Construction Timeline
At the Plan Commission First Reading for the Arden Townhomes ADLS/DP approval on January
17, 2006, a question was posed by the Plan Commission as to the timeline for construction of the
Cool Creek Trail extension. The Cool Creek trail extension, which is planned to run along the
eastern and northern boundaries of the Arden Townhomes site, will be constructed by the Developer
in conjunction with the construction of the Arden Townhomes project, if approved.
The construction of the trail extension is anticipated to be completed within 90 days of receipt of all
approvals.
Sincerely,
BUCKINGHAM PROPERTIES, INe.
~~ AJ~.
Sara C. Nasuti
Development Manager
333 N. Pennsylvania Street
IOth Floor
Indianapolis, IN 46204
P 317.974.1234
f 317.974.1238
www.buckingham-co.com