Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ID-5.10A
TV 63" AFF TV 57" AFF TV 57" AFF TV 69" AFF 28" AFF 28" AFF GFCI NOTE: VERIFY POWER LOCATION AND REQUIREMENT WITH GOLF SIMULATOR MFR 26" AFF HORIZ 26" AFF HORIZ 26" AFF HORIZ 28" AFF 28" AFF 38" AFF HORIZ 38" AFF HORIZ EQ EQ EQ EQEQEQ EQEQ 6"6"EQEQ EQ EQ 5'-3"5'-6" EQEQ 6'-0"EQ EQ EQ EQ EQ EQ 2'-10"3'-6" 3'-6" 3'-6" 3'-6 1/8" 3'-6" 1'-3"EQEQ 1'-6"4'-6" 3'-6" 3'-6"-- FITNESS -- CLUB -- CORRIDOR -- JANITOR A1 ELEVATOR -- RESTROOM --SPORTSSIMULATOR -- RESTROOM --WORK ROOM -- IDF -- OFFICE -- FOYER -- LOBBY -- LEASING 9" 9"1'-9"2'-4" 5'-6"CLIENT / DEVELOPER: PROJECT CONTACTS: PROJECT NAME: ISSUE LOG: SHEET NUMBER: DRAWING NAME: THE INTERIOR DESIGN PLANS AND SPECIFICATIONS ISSUED FOR THIS PROJECT HAVE BEEN PREPARED BY SJL DESIGN GROUP (SJL) FROM DATA PROVIDED BY THE REPRESENTATIVE OF THE CLIENT. THE COMPLETENESS AND ACCURACY OF THIS DATA HAS BEEN RELIED UPON BY SJL. INTERIOR AND PRODUCT DESIGNS ARE SUBJECT TO MODIFICATIONS OR CHANGES DUE TO FIELD VERIFICATIONS, EXISTING OR OTHER CONDITIONS AND BUILDING CODE REQUIREMENTS. THE DEVELOPER/CLIENT SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS FOR THE PROJECT AND FOR COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL CODES. IN THE EVENT THE PLANS AND/OR SPECIFICATIONS ARE REQUIRED TO BE SEALED BY A LICENSED PROFESSIONAL, IT IS THE RESPONSIBILITY OF THE DEVELOPER/CLIENT TO RETAIN A LICENSED PROFESSIONAL TO SIGN AND SEAL THE PLANS. SJL SHALL NOT BE RESPONSIBLE FOR ANY CHANGES OR MODIFICATIONS TO THE PLANS AND SPECIFICATIONS UNLESS EXPRESSLY APPROVED BY SJL IN WRITING.THE CORNER116TH STREET & RANGELINECARMEL, INDIANA 46032PROJECT NUMBER: 118-1198 BUCKINGHAM COMPANIES 30 SOUTH MERIDIAN STREET, SUITE 1100 INDIANAPOLIS, INDIANA 46204 T: 317.974.1234 PROJECT ISSUE / DATE: IFC SET - BUILDING A SEPTEMBER 01, 2021 SCALE: ISSUE DATES: LRK 50 SOUTH B.B. KING BLVD. SUITE 600 MEMPHIS, TN 38103 T: 901.521.1440 ARCHITECT: STACY MILLER (PRINCIPAL) ANNA KARCHER (PROJECT MANAGER) KEY PLAN: 9 2 1 N . R I V E R F R O N T B L V D. S U I T E 1 0 0 D A L L A S , T E X A S 7 5 2 0 7 T: 2 1 4 . 4 4 3 . 9 0 9 0 F: 2 1 4 . 9 7 5 . 1 0 4 4 NOT FOR CONSTRUCTION - ©2021 SJL DESIGN GROUP PERMIT SET 06.16.2021 IFC SET - BUILDING B 08.20.2021B C IFC SET - BUILDING A 09.01.2021 ID-5.10A SPECIALTY POWER PLAN BUILDING A - LEVEL 1: AMENITIES 1/4" = 1'-0" 01SPECIALTY POWER PLAN BLDG A - LVL 1: AMENITY1/4" = 1'-0" 11/15/21