Loading...
HomeMy WebLinkAboutP112a - PARTIAL L02 PLUMBING PLANS - BLDG AT T 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/2" CW 1 1/2" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/2" CW 2" CW 3" CW 2 1/2" CW 2" CW 1 1/4" CW 2 1/2" CW 1 1/4" CW STANDPIPE WITH HOSE VALVE AT INTERMEDIATE LANDING. HD-1 B C D E F G A1 3 2 1 A 1.21.1 F.9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1 313131313131 3 1 1"CW DN 1"CW DN 2 CORRIDOR A240 STAIR A2 A250 ELEC. P102 CORRIDOR A240 A1e A201 S1 alt 1 A203 A2b A205 A1d A207 S1 A209 A1d A211 A1d A213 A1b A215 A2f A214 A2g A212 B1e alt 1 A210 S1 alt 3 A208 A1 alt 3 A206 B1f A204 B3 A202 1 1/4" CW1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/4" CW 1 1/2" CW 1 1/4" CW 1 1/4" CW 2 1/2" CW 2 1/2" CW 4"CW DN 3" CW 3" CW 1 1/2" CW STANDPIPE WITH HOSE VALVE AT INTERMEDIATE LANDING. 3" CW H J K AA AD AG AH 4 5 L M N A1 A2 A3 3 2 1 AF AC AB M.8M.9 1.1 1 2 31313131313131 1 1 1 1 1 1 11 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 23 3 3 3 3 3 3 3 3 3 3 3 1 22 HD-1 2 S1a A217 A3 A219 A1d A221 A1d A223 STAIR A3 23 A3 A225 S2 A226 B4 A224 B4 A224 A2n A222 A2m A220 B4 A218 S2 A216 A2f A214 A3 A225 S2 A226 50 South B.B. King Blvd. Suite 600 Memphis, TN 38103 901.521.1440 Drawing Name: Client: Drawn By: Checked By: Project Name: Issued / RevisedDate # Issues and Revisions ©2020 LRK Inc. Drawings, written material, and design concepts shall not be used or reproduced in whole or part in any form or format without prior written consent of LRK Inc. Do not scale drawings. Use given dimensions only. If not shown, verify correct dimensions with the Architect. Contractor shall check and verify all dimensions and conditions at job site. KBSO Project Number: 20070 1344 South Rangeline Road Suite 202 Carmel, IN 46032 317.344.8044 9/3/2021 2:31:44 PM C:\Users\athomas\Documents\20070 The Corner MEP v19_athomasAW36X.rvt LRK Project Number: 01.18066.00 P112a PARTIAL L02 PLUMBING PLANS -BLDG A The Corner Carmel, IN KC ABT 116th Street & Rangeline Carmel, INThe Corner Carmel, IN •01.18066.00GENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. 1/8" = 1'-0" PARTIAL BLDG A L02 NW PLUMBING PLAN1 1/8" = 1'-0" PARTIAL BLDG A L02 NE PLUMBING PLAN2 SHEET KEYNOTES 1 3" WASTE/VENT STACK. 2 2" WASTE/VENT STACK. 3 1-1/4"CW UP, 3/4"CW TO SERVE UNIT. 1 06.16.21 Permit Set 2 08.20.21 IFC Set 11/15/21