Loading...
HomeMy WebLinkAboutP113b - PARTIAL L03 PLUMBING PLANS - BLDG AT STANDPIPE WITH HOSE VALVE AT INTERMEDIATE LANDING. 56 7 8 9 10 1213 A1 11 14 M.9 B-AB B-A2 B-A1 1 1 2 1 1 2 1 1 2 11 11 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 333 33 3 3 3 3 3 3 3 3 HD-1 2 S2 A326 A1c A327 A1d A329 A1d A331 A1d A333 S1 A335 A1d A337 A1f A339 B1r A338 B1k A336 S1 alt2 A336 A1 alt2 A332 B1e A330 B1d alt1 A328 CORRIDOR A342 MECH. A345 TELECOMM. A346 STAIR A1 A348 STORAGE A343ELEC. A344 50 South B.B. King Blvd. Suite 600 Memphis, TN 38103 901.521.1440 Drawing Name: Client: Drawn By: Checked By: Project Name: Issued / RevisedDate # Issues and Revisions ©2020 LRK Inc. Drawings, written material, and design concepts shall not be used or reproduced in whole or part in any form or format without prior written consent of LRK Inc. Do not scale drawings. Use given dimensions only. If not shown, verify correct dimensions with the Architect. Contractor shall check and verify all dimensions and conditions at job site. KBSO Project Number: 20070 1344 South Rangeline Road Suite 202 Carmel, IN 46032 317.344.8044 9/3/2021 2:32:25 PM C:\Users\athomas\Documents\20070 The Corner MEP v19_athomasAW36X.rvt LRK Project Number: 01.18066.00 P113b PARTIAL L03 PLUMBING PLANS -BLDG A The Corner Carmel, IN KC ABT 116th Street & Rangeline Carmel, INThe Corner Carmel, IN •01.18066.00GENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. 1/8" = 1'-0" PARTIAL BLDG A L03 SE PLUMBING PLAN 1 SHEET KEYNOTES 1 3" WASTE/VENT STACK. 2 2" WASTE/VENT STACK. 3 1-1/4"CW FROM BELOW, 3/4"CW TO SERVE UNIT, 1"CW UP. 1 06.16.21 Permit Set 2 08.20.21 IFC Set 11/15/21