Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P115a - PARTIAL L05 PLUMBING PLANS - BLDG A
T T STANDPIPE WITH HOSE VALVE AT INTERMEDIATE LANDING. HD-1 A1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2" V 2" V 2" V 3" V 3" V 3" V 2" V 2" V 2" V 3" V 2" V 3" V 3" V 2" V 2" V 3" V 2" V 3" V 2" V 3" V 2" V 3" V 3" V 2" V 2" V 3" V 3" V 2" V 3" V 3" V2" V 2" V 3" V3" V 3" V 2" V 2" V 3" V 3" V 2" V2" V 2" V 2" V 3" V 3 2"V A1e A501 S1 alt.1 A503 A2b A505 A1d A507 S1 A509 A1d A511 A1d A513 A1b A515 A2f alt1 A514 A2g A512 B1e alt1 A510 S1 alt3 A508 A1 alt3 A506 B1f alt1 A504 B3 alt1 A502 STAIR A2 A550 CORRIDOR A540 STANDPIPE WITH HOSE VALVE AT INTERMEDIATE LANDING. HD-1 K AA AD AG AH 4 5 A1 A2 A3 AF AC AB M.9 1 2 1 1 1 1 1 1 11 1 1 1 1 1 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 2" V 3 4 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 3" V 3" V 3" V 3" V 3" V 2" V 2" V 2" V 3" V 3" V 3" V 2" V 2" V 2" V 3" V 2" V 2" V 3" V 2" V 2" V 3" V 3" V 3" V 3" V 3" V 2" V 2" V 3" V 3" V 3" V 3" V 3" V2" V 2" V 3" V 3" V 2" V 2" V A2f alt1 A514 S1a A517 A3 alt1 A525 A1d A521 A1d A523 STAIR A3 A549 A3 alt1 A525 S2 A526 B4 alt1 A524 A2n A522 A2m 520 B4 alt1 A518 S2 A516 A2f alt1 A514 50 South B.B. King Blvd. Suite 600 Memphis, TN 38103 901.521.1440 Drawing Name: Client: Drawn By: Checked By: Project Name: Issued / RevisedDate # Issues and Revisions ©2020 LRK Inc. Drawings, written material, and design concepts shall not be used or reproduced in whole or part in any form or format without prior written consent of LRK Inc. Do not scale drawings. Use given dimensions only. If not shown, verify correct dimensions with the Architect. Contractor shall check and verify all dimensions and conditions at job site. KBSO Project Number: 20070 1344 South Rangeline Road Suite 202 Carmel, IN 46032 317.344.8044 9/3/2021 2:33:03 PM C:\Users\athomas\Documents\20070 The Corner MEP v19_athomasAW36X.rvt LRK Project Number: 01.18066.00 P115a PARTIAL L05 PLUMBING PLANS -BLDG A The Corner Carmel, IN KC ABT 116th Street & Rangeline Carmel, INThe Corner Carmel, IN •01.18066.00GENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. 1/8" = 1'-0" PARTIAL BLDG A L05 NW PLUMBING PLAN 1 1/8" = 1'-0" PARTIAL BLDG A L05 NE PLUMBING PLAN2 SHEET KEYNOTES 1 3" WASTE/VENT STACK. 2 2" WASTE/VENT STACK. 3 3/4"CW FROM BELOW TO SERVE UNIT. 4 3" VENT UP TO 4"VTR. 1 06.16.21 Permit Set 2 08.20.21 IFC Set 11/15/21