Loading...
HomeMy WebLinkAboutMinutes HO 01-24-22 (V)Thompson Pergola Setback Variance. The applicant seeks the following development standards variance approval: 6. Docket No.PZ-2021-00232 V Silvara PUD Ordinance Z-652-20 5-ft side yard setback required,O- ft requested. The site is located at 12072 Sigillary Way(Lot 44 in Hamlet at Jackson's Grant subdivision). It is zoned PUD/Planned Unit Development. Filed by Ross Atteberry with The Smart Pergola,on behalf of Terry and Linda Thompson,owners. Petitioner: Ross Atteberry: • The homes in the Hamlet are townhomes in style,and have very small sideyards • The subject site has an existing side yard patio that extends to the property line,and the purpose of this request is to protect the entire patio from the elements • There are number of Smart Pergolas that have been installed in this neighborhood • The HOA approved this project,and we received consent to encroach approval from the Engineering Department • The home across the street received a similar variance approval(0' setback)for their pergola Public Comments: None Department Report: Angie Conn • The HOA approved their pergola proposal • I spoke with Jarod Huff of the Cannel Engineering,and they are requiring approval by the BPW • Staff recommends approval of this variance request Board Comments: None Approved 1-0,with the Condition the Petitioner obtains proper Consent to Encroach approval from BPW. (V)Troy Estates Lot Cover Variances. The applicant seeks the following development standards variance approvals: 7. Docket No.PZ-2021-00239 V UDO Section 2.06 Maximum 35%lot cover allowed, 45% requested. The sites are located near 4100 W. 1418t Street(Lots 1-40 in Troy Estates subdivision). They are zoned S2/Residence with variances.Filed by Tony Bagato with Lennar Homes of Indiana. Petitioner: Tony Bagato: • We have 39 home sites are shown on our subdivision concept plan • We have new designs of our Troy Estates homes,and we found out some of them exceed the max lot coverage allowance of 35% • We understand we would need our final drainage plans to be approved by the Cannel Engineering • We will be making improvements to our drainage plans to accommodate for the extra lot coverage Public Comments: None Department Report:Angie Conn • The Cannel Engineering Dept. are currently reviewing their drainage plans • We recommend approval with the condition of obtaining the proper approvals from the Engineering Dept. Board Comments: None Approved 1-0,with the Condition the Petitioner must obtain proper approvals from the Carmel Engineering Dept. for the revised drainage plan before submitting for any additional residential building permits. IM7y7ed42P.m. (1/,,., /7-'0—,'-‘-'" Po snik—Hearing Officer J Shestak—Recording Secretary 3 BZA Hearing Officer Minutes 1-24-22