HomeMy WebLinkAboutBeam, Longest & Neff, LLC/ENG/$606,000/Smoky Row Road – Old Meridian to Rangeline RAB – Inspection - ASA DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 DocuSign Envelope ID:CA96BD75-FA44-4661-B8B0-BC70A4FD3DOF Beam,Longest&Neff,LLC Engineering Department-2022 Appropriation#2200 0 44-628.71 2020 Road Bond Fund; P.O.#106290 ,- Contract Not To Exceed S606,000.00 ic,Pli NED By Sergey Grechukhin at 2.36 pm,Feb 22,20211 w r ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement") entered into by and between the City of Carmel and COMPANY NAME (the `Professional"), as City Contract dated June 6, 2021 shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated herein as Exhibit"A" and "Attachment A-1". The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF,the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA Beam, Longest&Neff, LLC by and through its Board of Public Works and Safety By: By: DocuS&gned by: Not Present looks t . James Brainard, Presiding Officer otholizat Signature Date' James B. Longest c DocuSigned by: Ii ate, but.4t, Printed Name 11."-tyArtivDurke, Member President Date: 3/2/2022 DocuSigned by: Title 35-2031487 -LI:,EcBW ,ton, Member FID(TIN:• Date: 3/2/2022 Date: 2/16/2022 ATTEST: DocuSigned by: Li WhIalfg-,.rog, Clerk Date: 3/2/2022 [S Coiumcli Depnninoss FVGI',(C'1Be:un,Loupes&Neff.LLC ASA doc:2,22'10222:1S PM] DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4BOD556B7 EXh A BN ibit 8320 CRAIG STREET 1 INDIANAPOLIS IN 46250 317 849 5832 1 317 841 4280 800.382,5206 I WWW,B-L-N.COM BEAM-LONGEST.N EFF A TRADITION OF EXCELLENCE SINCE 1945 CITY OF CARMEL Construction Observation of Smoky Row Road Reconstruction Old Meridian Road to Rangeline Road SUPPLEMENTAL NO. 2 FEE JUSTIFICATION BEAM, LONGEST AND NEFF, L.L.C. 8320 Craig Street Indianapolis, Indiana 46250 317-849-5832 (FAX) 317-841-4280 February 2022 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 BLN . BEAM•LONGESTNEFF SCOPE OF WORK Construction Observation of Smoky Row Road Reconstruction Old Meridian Road to Rangeline Road CONSTRUCTION OBSERVATION Construction Observation: This project involves the construction inspection for reconstruction of Smoky Row Road from Old Meridian Road to Rangeline Road in Carmel, Indiana. The project includes the improvements to the intersection of Smoky Row Road at North End Drive with the installation of a single-lane roundabout. Smoky Row Road reconstruction will include new full-depth pavement, curb and gutter, enclosed storm water system, lighting, and shared-use path with new curb ramps and raised crosswalks. The existing corrugated metal pipe conveying Little Cool Creek under Smoky Row Road will be replaced with a 53 ft single span concrete box beam bridge. Additionally, the existing two span concrete box culvert conveying Little Cool Creek under Monon Trail will be replaced with a 42 ft long steel pedestrian truss bridge. Additional features include: • Smoky Row will use one 16-foot lane through the roundabout with a 12-foot truck apron • Travel lanes will be bordered with curb and gutter sections • All curb ramps will be ADA compliant ramps at crosswalks • Construction of Decorative Landscape Wall on west side of Rangeline Road. • Proposed grades are adjusted to facilitate drainage • Driveways and Approaches will be replaced throughout project limits • Communication conduit installed on the southside of the roadway • Water main lowering along with Sanitary Sewer Adjustments • Erosion Control measures installed throughout during construction operations • New regulatory and warning street signs and pavement markings will be placed BLN will furnish a Resident Project Representative (RPR), assistants and other staff to assist in observing the performance of the work of the contractor. It is anticipated that the RPR will be on site forty four (44) hours per week for forty eight (48) weeks and an Assistant RPR will be on site forty four (44) hours per week for thirty six (36) weeks. 2/11/2022 I PAGE 2 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 B N1111 BEAM LONGEST NEFF FEE SUMMARY Smoky Row Road Reconstruction Old Meridian Road to Rangeline Road • Construction Observation $606,000.00 2/11/2022 PAGE 3 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 FEE JUSTIFICATION EXHIBIT MAN-HOURS BY CLASSIFICATION CONSTRUCTION OBSERVATION OWNER: Carmel PROJECT: Smoky Row DESCRIPTION: Road and Bridge Reconstruction Man-hours byClassification DEPT. RPR Assistant . , . TOTAL Task MGR. RPR Preconstruction Activities 24 80 0 104 ----------- Field Work 192 2112 1584 3888 Post-Construction Activities 24 80 20 124 1 Final Closeout 2 120 40 162 Total Hours 242 2392 1644 4278 Hourly Rate $300.00 $130.00 $130.00 Total Labor $72,600.00 $310,960.00 $213,720,00 S597.280.00 Direct Non-Salary Costs USE ......_ 7—__ $8,700.00 Subtotal $605,980.00 $606,000.00 Estimated Letting Date: 2/17/22 Estimated Start of Construction: 4/4/22 Estimated End of 2022 Construction: 12/16/22 Estimated Begin of 2023 Construction: 3/6/23 Estimated End of 2023 Construction: 5/19/23 Estimated Road,Water and Communication Construction Cost $4,963,000.00 Estimated Bridges and Walls Construction Cost: $2,437,000,00 Total: $7,400,000.00 Assumes 52 total weeks: 2 weeks for Preconstruction activities RPR-48 weeks of construction activities at 44 hours/week Assistant RPR-36 weeks of construction activities at 44 hours/week 2 weeks for Post-construction activities Utility coordination handled by Design Team ' DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 FEE JUSTIFICATION EXHIBIT MAN-HOURS BY CLASSIFICATION CONSTRUCTION OBSERVATION CONSTRUCTION OBSERVATION DIRECT COSTS Task X Y Z TOTAL MILEAGE(On Site Miles only): (X miles/week)x(Y weeks)x($0.39/mile)= 250 88 $0.39 $8.580.00 LODGING; e (X weeks)x(4 nights per week)x($100/night)= 0 4 $100.00 $0.00 PER DIEM,: (X weeks)x(5 days per week)x($26/day)= 0 5 $26.00 $0.00 XEROX COPIES(8.5)(11); (X sets)x(Y pages/set)x($0.15/page) 2 400 $0.150 $120.00 TOTAL $8,700.00 1 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 ATTACHMENT A-1 Duties, Responsibilities and Limitations of Authority Of Resident Project Representative The PROFESSIONAL shall furnish a Resident Project Representative ("RPR"), assistants and other field staff to assist the PROFESSIONAL in observing progress and quality of the work of the Contractor. Through on-site observations of the work in progress and field checks of materials and equipment by the RPR and assistants, the PROFESSIONAL shall endeavor to provide further protection for the CITY OF CARMEL against defects and deficiencies in the work of the Contractor. However, the PROFESSIONAL shall not, during such visits or as a result of such observations of the Contractor's work in progress, supervise, direct, or have control over the Contractor's work nor shall the PROFESSIONAL have authority over or responsibility for the means, methods, techniques, sequences or procedures selected by the Contractor, for safety precautions and programs incident to the work of the Contractor, for any failure of the Contractor to comply with laws, rules, regulations, ordinances, codes or orders applicable to the Contractor's performing and furnishing the work, or responsibility of construction for the Contractor's failure to furnish and perform the Work in accordance with the Contract Documents. The duties and responsibilities of the RPR are limited to those of the PROFESSIONAL in the CONSULTANT'S agreement with the CITY OF CARMEL and in the construction Contract Documents, and are further limited and described as follows: A. General RPR is the CONSULTANT'S agent at the site, will act as directed by and under the supervision of the CONSULTANT, and will confer with the PROFESSIONAL regarding RPR's actions. RPR's dealings in matters pertaining to the on-site work shall in general be with the PROFESSIONAL and Contractor, keeping the CITY OF CARMEL advised as necessary. RPR's dealings with subcontractors shall only be through or with the full knowledge and approval of the Contractor. RPR shall generally communicate with the CITY OF CARMEL with the knowledge of and under the direction of the CONSULTANT. B. Duties and Responsibilities of RPR 1. Schedules: Review the progress schedule, schedule of Shop Drawing submittals and schedule of values prepared by the Contractor and consult with the PROFESSIONAL concerning acceptability. 2. Conferences and Meetings: Attend meetings with the Contractor, such as preconstruction conferences, progress meetings, job conferences and other project-related meetings, and prepare and circulate copies of minutes thereof. 1 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 3. Liaison: a. Serve as the CONSULTANT'S liaison with the Contractor, working principally through the Contractor's superintendent and assist in understanding the intent of the Contract Documents; and assist the PROFESSIONAL in serving as the CITY OF CARMEL'S liaison with the Contractor when the Contractor's operations affect the CITY OF CARMEL'S on-site operations. b. Assist in obtaining from the CITY OF CARMEL additional details or information, when required for proper execution of the Work. 4. Shop Drawings and Samples: a. Record date of receipt of Shop Drawings and Samples. b. Receive Samples which are furnished at the site by Contractor, and notify PROFESSIONAL of availability of Samples for examination. c. Advise PROFESSIONAL and Contractor of the commencement of any Work requiring a Shop Drawing or Sample if the submittal has not been approved by CONSULTANT. 5. Review of Work, Rejection of Defective Work, Inspections and Tests: a. Conduct on-site observations of the Work in progress to assist the PROFESSIONAL in determining if the Work is in general proceeding in accordance with the Contract Documents. b. Report to the PROFESSIONAL whenever RPR believes that any Work will not produce a completed Project that conforms generally to the Contract Documents or will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated in the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise the PROFESSIONAL of Work that RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval. c. Verify that tests, equipment and systems start-ups and operating and maintenance training are conducted in the presence of appropriate personnel, and that Contractor maintains adequate records thereof; and observe, record and report to PROFESSIONAL appropriate details relative to the test procedures and start-ups. 2 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 d. Accompany visiting inspectors representing public or other agencies having jurisdiction over the Project, record the results of these inspections and report to CONSULTANT. 6. Interpretation of Contract Documents: Report to the PROFESSIONAL when clarification and interpretations of the Contract Documents are needed and transmit to the Contractor clarifications and interpretations as issued by the CONSULTANT. 7. Modifications: Consider and evaluate the Contractor's suggestions for modifications in Drawings or Specifications and report with RPR's recommendations to the CONSULTANT. Transmit to the Contractor in writing the decision as issued by the CONSULTANT. 8. Records: a. Maintain at the job site orderly files for correspondence, reports of job conferences, shop drawings and samples, reproductions of original Contract Documents including all Work Change Directives, Addenda, Change Orders, Field Orders, additional Drawings issued subsequent to the execution of the Contract, CONSULTANT's clarifications and interpretations of the Contract Documents, progress reports, Shop Drawing submittals received from and delivered to Contractor and other Project related documents. b. Prepare a daily report or keep a diary or log book, recording Contractor's hours on the job site, weather conditions, data relative to questions of Work Change Directives, Change Orders or changed conditions, list of job site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to CONSULTANT. c. Record names, addresses and telephone numbers of all Contractors, subcontractors and major suppliers of materials and equipment. 9. Reports: a, Furnish to the PROFESSIONAL periodic reports as required of progress of the Work and of the Contractor's compliance with the progress schedule and schedule of Shop Drawing and Sample submittals. b. Consult with PROFESSIONAL in advance of scheduled major tests, inspections or start of important phases of the Work. c. Draft proposed Change Orders and Work Change Directives, obtaining backup material from the Contractor and recommend to the PROFESSIONAL Change Orders, Work Change Directives, and Field Orders. 3 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 d. Report immediately to the PROFESSIONAL and the CITY OF CARMEL the occurrence of any accident. 10. Payment Requests: Review Applications for Payment with Contractor for compliance with the established procedure for their submission and forward with recommendations to CONSULTANT, noting particularly the relationship of the payment requested to the schedule of values. Work completed and materials and equipment delivered at the site but not incorporated in the Work. 11. Certificates, Maintenance and Operation Manuals: During the course of the Work, verify that certificates, maintenance and operation manuals and other data required to be assembled and furnished by Contractor are applicable to the items actually installed and in accordance with the Contract Documents, and have this material delivered to PROFESSIONAL for review and forwarding to CITY OF CARMEL prior to final payment for the Work. 12. Completion: a. Before the PROFESSIONAL issues a Certificate of Substantial Completion, submit to the Contractor a list of observed items requiring completion or correction. b. Observe whether the Contractor has had performed inspections required by laws, rules, regulations, ordinances, codes, or orders applicable to the work, including but not limited to those to be performed by public agencies having jurisdiction over the work. c. Conduct a final inspection in the company of the CITY OF CARMEL and Contractor and prepare a final list of items to be completed or corrected. d. Observe whether all items on final list have been completed or corrected and make recommendations to PROFESSIONAL concerning acceptance and issuance of the Notice of Acceptability of the Work. C. Limitations of Authority by RPR The Resident Project Representative 1. Shall not authorize any deviation from the Contract Documents or substitution of materials or equipment (including "or-equal" items), unless authorized by the CONSULTANT. 2. Shall not exceed limitations of the CONSULTANT'S authority as set forth in the Agreement or the Contract Documents. 3. Shall not undertake any of the responsibilities of the Contractor, Subcontractor, Suppliers, or Contractor's superintendent. 4 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 4. Shall not advise on, issue directions relative to or assume control over any aspect of the means, methods, techniques, sequences or procedures of construction unless such advice or directions are specifically required by the Contract Documents. 5. Shall not advise on, issue directions regarding or assume control over safety precautions and programs in connection with the Work. 6. Shall not accept Shop Drawing or Sample submittals from anyone other than the Contractor. 7. Shall not authorize the CITY OF CARMEL to occupy the Project in whole or in part. 8. Shall not participate in specialized field or laboratory tests or inspections conducted by others except as specifically authorized by the CONSULTANT. 5 DocuSign Envelope ID: 19225BE0-4115-4986-BFAE-58D4B0D556B7 , INDIANA RETAIL TAX EXEMPT Page 1 of 1 -1, Are it .„ y of Carmel CERTIFICATE NO,003120155 002 0 PURCHASE ORDER NUMBER FEDERAL EXCISE TAX EXEMPT 1 062 )10 ONE CIVIC SQUARE 35-6000972 THIS NUMBER MUST APPEAR ON INVOICES,AtP CARMEL, INDIANA 46032-2584 VOUCHER,DELIVERY MEMO,PACKING SUPS, SHNPPING LABELS AND ANY CORRESPONDENCE FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL- 1997 PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO VENDOR NO DESCRIPTION' 2/15/2022 00351110 ASA 1 -20-ENG-01 Smoky Row Road—Old Meridian to Range Line Road RAB-Inspection BEAM, LONGEST& NEFF, LLC City Engineering's Office VENDOR 8320 CRAIG STREET SHIP 1 Civic Square TO Carmel, IN 46032- INDIANAPOLIS, IN 46250- Laurie Slick PURCHASE ID BLANKET CONTRACT PAYMENT TERMS FREIGHT 63492 QUANTITY UNIT OF MEASURE DESCRIPTION UNIT PRICE EXTENSION Department: 2200 Fund: 0 2020 Road Bond Account: 44-628.71 1 Each ASA 1 -20-ENG-01 Smoky Row Road—Old Meridian to $606,000.00 $606,000.00 Range Line Road RAB-Inspection Sub Total $606,000.00 1 4 41 \ 1 / , i / 4 i ..\ f 4$4414,444 4wr 4 47", 40,//g74 ile.,,Irrw,,hioyo, i ; viol fiforyompaorpriV1/11 !, ',/ vprakeptit#14,,,golosodii ,,, 1 1 Send Invoice To: Jill Newport CrossRoad Engineers, PC 115 N. 17th Avenue Beech Grove, IN 46107 '-'-- ---- --,,— PLEASE INVOICE IN DUPLICATE DEPARTMENT 1 ACCOUNT F--- PROJECT 1 PROJECT ACCOUNT 1 AMOUNT i I PAYMENT $606,000.00 .kp VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P 0 NUMBER IS MADE A SHIPPING INSTRUCTIONS PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN *SHIP PREPAID AFFIDA,VVI ATTACHED I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN *COD SHPMENT CANNOT BE ACCEPTED THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER *PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABE *THIS ORDER SSUED ON COMPLIANCE WITH CHAPTER 99,ACTS 194 AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO ORDERED BY Jeremy Kashman James Crider TITLE Director Director of Administration CONTROL NO. 'i 06290 CONTROLLER