Loading...
HomeMy WebLinkAboutE050 - SITE ELECTRICAL PLANT SM4-IL HB:9,11 +15'-0" SM4-IL HB:9,11 +15'-0" SM4-IL HB:9,11 +15'-0" SM4-IL HB:9,11 +15'-0" SM4-IL HB:9,11 +15'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:5,7 +24'-0" SA-IL HB:9,11 +20'-0" SA-IL HB:9,11 +20'-0" DL5 HB:9,11 +24'-0" DL5 HB:9,11 +24'-0" DL5 HB:9,11 +24'-0" DL5 HB:9,11 +24'-0" DL5 HB:9,11 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" DL5 HB:1,3 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" W1 HB:2,4 +24'-0" FUTURE BUILDING PHASE 2 CARMEL DETAIL CENTER UTILITY TRANSFORMER PANEL HB PANEL A E050 SITE ELECTRICAL PLAN DRAWING ISSUE HISTORY ADLS ISSUE: CONSTR ISSUE: COPYRIGHT 2021 210422 JP JP AS NOTED PROJECT NO: DRAWING DATE: DRAWN BY: CHECKED BY: DRAWING SCALE: CARMEL DETAIL CENTER4250 E 96th STREETINDIANAPOLIS, INDIANAA u t o m o t i v e G r o u pN BID / PERMIT ISSUE: MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office 11-10-21 11-10-21JEFFREY M . PE R KEY 11/10/2021 GENERAL NOTES: 1 SCALE: 1" = 30'-0" SITE ELECTRICAL PLAN 1. REFERENCE SHEET E001 FOR ABBREVIATIONS, SYMBOLS & SPECIFICATIONS. 2. ALL LIGHT FIXTURE SHALL BE PHOTOCELL CONTROLLED WITH TIME CLOCK OVERRIDE. 3. SIZE ALL BRANCH CIRCUIT CONDUCTORS FOR VOLTAGE DROP AS REQUIRED PER NEC. 4. REFER TO POLE BASE DETAIL ON SHEET E001 FOR ADDITIONAL INFORMATION. 1. PROVIDE 4" PVC CONDUITS W/PULL STRING FOR UTILITY PRIMARY. TIE IN CONDUITS TO UTILITY PRIMARY LINE INTERCEPT LOCATION. COORDINATE EXACT REQUIREMENTS WITH UTILITY COMPANY. FIELD COORDINATE CONDUIT ROUTING WITH ALL OTHER DISCIPLINES. 2. PROVIDE 4" PVC CONDUIT W/ PULL STRING ROUTED FROM UTILITY TRANSFORMER PRIMARY SIDE COMPARTMENT TO STUB-OUT LOCATION FOR FUTURE PHASE 2 BUILDING. FIELD COORDINATE CONDUIT ROUTING WITH ALL OTHER DISCIPLINES. PROVIDE CONDUIT MARKER TAPE AT STUB-OUT LOCATION. CAP OFF CONDUIT. KEY NOTES: # 1 2 W1 SM4-IL SA-IL SINGLE SINGLE SINGLE XWM-FT-LED-12L-50 / WALL LIGHT SINGLE MRM-LED-24L-SIL-FT-50-70CRI-IL / 13' POLE SINGLE MRM-LED-42L-SIL-FTA-50-70CRI-IL / 22' POLE 102.2 187 390 2248.4 935 7410 EXTERIOR LIGHTING FIXTURE SCHEDULE (LIGHT FIXTURES FOR BID PURPOSES ONLY, FINAL LIGHT FIXTURE SELECTIONS SHALL BE CONFIRMED BY OWNER). TYPE DL5 Arrangement D180 MODEL TWIN MRM-LED-42L-SIL-5W-50-70CRI / 22' POLE Lum. Watts 390 Total Watts 16380 MANUFACTURER OWNER SUPPLIED / CONTRACTOR INSTALLED OWNER SUPPLIED / CONTRACTOR INSTALLED OWNER SUPPLIED / CONTRACTOR INSTALLED OWNER SUPPLIED / CONTRACTOR INSTALLED 12/28/21