HomeMy WebLinkAboutE200 - ROOF ELECTRICAL PLANS SD
RTU-1
EF-4
EF-3
EF-5
EF-6
EF-7
RTU-2
S SD
WP
A:9
HA:8,10,12
HA:14,16,18
AC-1
A:5,7
HA:1,3,5
HA:7,9,11
WP
A:9
WP
A:9
WP
A:9 A:11
WP
A:17
A:19
WP
A:9
WP
A:9
WP
IH-1 M
MS-1
A:79,81
E200
ELECTRICAL
ROOF PLAN
DRAWING ISSUE HISTORY
ADLS ISSUE:
CONSTR ISSUE:
COPYRIGHT 2021
210422
JP
JP
AS NOTED
PROJECT NO:
DRAWING DATE:
DRAWN BY:
CHECKED BY:
DRAWING SCALE: CARMEL DETAIL CENTER4250 E 96th STREETINDIANAPOLIS, INDIANAA u t o m o t i v e G r o u pN BID / PERMIT ISSUE: MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office 11-10-21
11-10-21JEFFREY M . PE
R
KEY 11/10/2021
1 SCALE: 1/8" = 1'-0"
ELECTRICAL ROOF PLAN
1. ROUTE POWER THROUGH CONTROLS, IE
MOTOR STARTER, T/S, OR SWITCH PROVIDED
BY HVAC CONTRACTOR. COORDINATE WITH
HVAC CONTRACTOR.
2. EF-3 SHALL RUN CONTINUOUSLY ON
OCCUPANCY VIA DIGITAL TIMER PROVIDED
AND INSTALLED BY E.C. AT BRANCH PANEL A.
3. FIRE ALARM CONTRACTOR TO PROVIDE
MONITORING AND RESET OF RTU SMOKE
DETECTORS FROM FIRE ALARM PANEL.
TYPICAL AS SHOWN.
4. PROVIDE BRANCH CIRCUIT FOR CO SYSTEM
FAN. COORDINATE WITH OWNERS
EQUIPMENT SUPPLIER.
5. PROVIDE 120V WP GFCI CONNECTION TO
WEATHER PROOF RECEPTACLE WITHIN 25' OF
ALL MECHANICAL EQUIPMENT.
6. PROVIDE ALL REQUIRED POWER AND DATA
BETWEEN INDOOR AND OUTDOOR UNITS.
KEY NOTES:
1. REFERENCE SHEET E001 FOR ABBREVIATIONS,
SYMBOLS & SPECIFICATIONS.
GENERAL NOTES:
#
1
2
3
4
5
1 4
3
5
5 TYPICAL
6
6
12/28/21