Loading...
HomeMy WebLinkAboutM200 - ROOF HVAC PLAN40/19 40/16 40/19 40/16 EF-6 300 EF-7 250 EF-44600 EF-3 800 EF-54600 4" FLUE 4" FLUE 4" FLUE4" FLUE 4" FLUE AC-1 1.5 TON RTU-115 TON RTU-215 TON IH-19200 6" VENT 8" VENT MS-1 1 TON 4" DRYERGOOSE NECK ROUTE 22"Ø TIGHTBOTTOM OF STRUCTURAL JOIST 22"Ø DUCT, SEEPLAN FOR CONTINUATION 40/19 RETURN WITH WIRED MASH AT END 40/16 SUPPLY KEY NOTES: GENERAL NOTES: ROUTE SUPPLY DUCTWORK ON ROOF THRU EXTERIOR WALL. SEE SHEET M100 FOR DUCTWORK CONTINUATION. TYPICAL. ROUTE RETURN DUCTWORK ON ROOF THRU EXTERIOR WALL. PROVIDE RETURN WIRE MASH AT END OF DUCTWORK AS REQUIRED. TYPICAL. # 1 SCALE: 1/8" = 1'-0" ROOF HVAC PLAN 1 1 2 2 M200 ROOF HVAC PLAN DRAWING ISSUE HISTORY ADLS ISSUE: CONSTR ISSUE: COPYRIGHT 2021 210422 JP JP AS NOTED PROJECT NO: DRAWING DATE: DRAWN BY: CHECKED BY: DRAWING SCALE: CARMEL DETAIL CENTER4250 E 96th STREETINDIANAPOLIS, INDIANAA u t o m o t i v e G r o u pN BID / PERMIT ISSUE: MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office 11-10-21 11-10-21 11/10/2021 1. REFERENCE SHEET M-001 FOR LEGENDS,ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET M002 FOR SCHEDULES. 3. REFERENCE SHEET M003 FOR DETAILS. 2 SCALE: 1/8" = 1'-0" SECTION VIEW 12/28/21