Loading...
HomeMy WebLinkAboutP001 - PLUMBING NOTESP001 PLUMBING ABBREVIATIONS, SYMBOLS, & SPECIFICATIONS DRAWING ISSUE HISTORY ADLS ISSUE: CONSTR ISSUE: COPYRIGHT 2021 210422 JP JP AS NOTED PROJECT NO: DRAWING DATE: DRAWN BY: CHECKED BY: DRAWING SCALE: CARMEL DETAIL CENTER4250 E 96th STREETINDIANAPOLIS, INDIANAA u t o m o t i v e G r o u pN BID / PERMIT ISSUE: MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office 11-10-21 11-10-21 11/10/2021 ABBREVIATIONS HW HWR SD SAN RD PIPING LINETYPES HEATING WATER SUPPLY DOMESTIC HEATING WATER RETURN DOMESTIC STORM DRAIN SANITARY SEWER COLD WATER DOMESTIC ROOF DRAIN SYMBOLS COMPRESSED AIR CW CA GASGAS NATURAL OR PROPANE ANCHOR / HANGER BALL VALVE EXPANSION JOINT GAS METER PIPE GUIDE "P" TRAP TEST PLUG PLUG VALVE WATER METER UNION THERMOMETER "Y" STRAINER PRESSURE GAUGE BALANCING VALVE CHECK, SWING VALVE FLEXIBLE PUMP CONNECTION FLANGED CONNECTION DROP PITCH DOWN IN DIRECTION OF ARROW RUN OUT OFF BOTTOM OF MAIN RUN OUT OFF TOP OF MAIN RISER TEE OFF SIDE OF MAIN PIPING SYMBOLS M GM P PLUMBING SPECIFICATIONS GENERAL 1. BID INSTRUCTIONS: CONTRACTORS SHALL PROVIDE BASE BID IN STRICT ACCORDANCE WITH DESIGN BASIS EQUIPMENT AND MATERIALS. PROJECT DOES ENCOURAGE COMPETITIVE PRICING AND ALLOWS FOR SUBSTITUTIONS OF EQUAL EQUIPMENT AND MATERIALS AGAINST THE BASIS OF DESIGN. SUBSTITUTE ITEMS WILL BE COMPARED AGAINST DESIGN BASIS DURING SUBMITTAL PROCESS. ENGINEER RESERVES THE RIGHT TO REJECT SUBSTITUTIONS FOUND NOT TO BE EQUAL TO ITEMS LISTED IN DESIGN BASIS. 2. PRIOR TO PROCUREMENT CONTRACTOR SHALL SUBMIT TO ARCHITECT FULL SUBMITTALS FOR ALL ENERGY CONSUMING OR PRODUCING ITEMS AND FOR ALL PLUMBING FIXTURES, VALVES, DRAINS, CLEAN OUTS, PIPING, PIPING ACCESSORIES, INSULATION AND PIPING HANGERS. SUBMITTALS SHALL BE DELINEATED WITH TAGS INDICATED ON PRINTS, CONTRACTORS NAME, PROJECT NAME. CLEARLY INDICATE ALL MODEL NUMBERS AND ALL ACCESSORIES AND OPTIONS BEING PROVIDED. SUBMISSIONS SHALL BE IN PDF FORMAT.ENGINEER RESERVES THE RIGHT TO REJECT ANY SUBSTITUTE ITEM. 3. CONTRACTOR SHALL BE RESPONSIBLE TO VISIT THE SITE TO EXAMINE ALL CONDITIONS THAT MAY IN ANY WAY AFFECT THE EXECUTION OF HIS WORK. HE SHALL ALSO EXAMINE THE DRAWINGS AND SPECIFICATIONS FOR OTHER BRANCHES OF WORK MAKING REFERENCE TO THEM FOR DETAILS OF EXISTING BUILDING CONDITIONS. NO EXTRAS WILL BE ALLOWED FOR FAILURE TO INCLUDE ALL REQUIRED WORK IN THE BID. CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. 4. THE DRAWINGS IN THIS SECTION ARE DIAGRAMMATIC AND ARE NOT INTENDED TO DEFINE EXACT QUANTITIES, LOCATIONS OR CODIFIED REQUIREMENTS. DRAWINGS SHOW GENERAL INTENT OF SYSTEMS. P.C. SHALL PROVIDE AND PAY FOR ALL REQUIRED PERMITS. 5. UPON COMPLETION OF THE PLUMBING INSTALLATION, DEMONSTRATE TO THE ENGINEER AND/OR THE OWNER'S SATISFACTION THAT THE SYSTEMS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS AND APPLICABLE CODES. DEMONSTRATE THE DYNAMIC OPERATION OF EACH SYSTEM. VERIFY PROPER OPERATION OF EQUIPMENT, FILTERS ARE CLEAN AND COMPONENTS OF THE SYSTEM ARE INSTALLED AND ADJUSTED IN FULL ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. 6. PLUMBING WORK SHALL BE COMPLETE IN EVERY DETAIL AND ALL MISCELLANEOUS ITEMS OF MATERIAL AND LABOR NECESSARY TO COMPLETE THE WORK DESCRIBED, SHOWN OR REASONABLY IMPLIED ON DRAWINGS OR SPECIFICATIONS SHALL BE INCLUDED IN THE CONTRACT. CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS TO THE WORK WHERE REQUIRED, WHEN SUCH ADJUSTMENTS ARE NECESSARY FOR PROPER OPERATION AND WITHIN THE INTENT OF THE CONTRACT. CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. 7. ALL WORK SHALL BE IN FULL ACCORDANCE WITH 2012 INDIANA PLUMBING CODE (INTERNATIONAL PLUMBING CODE 2006), 2010 INDIANA ENERGY CODE (2007 ASHRAE 90.1), 2014 INDIANA FUEL GAS CODE (2012 INTERNATIONAL FUEL GAS CODE) AND ALL PERTINENT STATE, COUNTY, CITY CODES AND ORDINANCES WITH INDIANA AMENDMENTS. 8. PLUMBING CONTRACTOR SHALL ACCEPT SOLE AND COMPLETE RESPONSIBILITY FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. 9. DURING CONSTRUCTION ALL PLUMBING FIXTURES, TRIM AND OTHER EQUIPMENT SHALL BE PROTECTED AGAINST DAMAGE OR INJURY. ANY FIXTURES OR EQUIPMENT DAMAGED AND ANY TRIM WITH MARRED OR SCRATCHED FINISH SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER. 10. PLUMBING CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL WATER, GAS, STORM AND SEWER UTILITY ROUGH-INS AND SHALL CONSULT WITH THE CIVIL PLANS AND WITH LOCAL UTILITY COMPANY(S) PROVIDING ALL MATERIALS AND LABOR AND PAYING ALL COSTS NOT BORNE BY THE LOCAL UTILITY COMPANY(S) FOR INSTALLATION OF SERVICES INCLUDING SECURING AND PAYING FOR ALL REQUIRED PERMITS. 11. PLUMBING CONTRACTOR SHALL ENSURE EMPLOYEES ARE MEETING AND DOCUMENTING ALL OSHA AND JOB SPECIFIC SAFETY REQUIREMENTS AS REQUIRED BY LAW AND BY CONTRACT. PERSONAL PROTECTIVE EQUIPMENT SHALL BE PROVIDED AND UTILIZED AS REQUIRED. MECHANICAL CONTRACTOR SHALL PAY ALL FINES LEVIED BY OSHA FOR FAILURE TO COMPLY WITH OSHA REQUIREMENTS. 12. ALL PLUMBING MATERIALS INSTALLED IN RETURN AIR PLENUMS SHALL BE INSTALLED OR COVERED WITH MATERIALS AS REQUIRED TO PROVIDE FLAME RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF NOT MORE THAN 50. PRIOR TO ROUGH-IN CONSULT WITH M.C. TO VERIFY ALL LOCATIONS OF RETURN AIR PLENUMS. 13. FURNISH AND INSTALL ACCESS PANELS FOR ALL CONCEALED EQUIPMENT, PIPING VALVES, CLEANOUTS, ETC. ACCESS PANELS SHALL BE OF SUFFICIENT SIZE TO PROVIDE ADEQUATE WORKING CLEARANCE AND ACCESS. 14. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED CUTTING AND PATCHING INCLUDING SAW CUTTING AND PATCHING OF EXISTING FLOORS AS REQUIRED TO ACCEPT NEW FLOORING. 15. UNLESS OTHERWISE NOTED, ROUTE ALL PIPING AS HIGH AS POSSIBLE AND ROUTE PERPENDICULAR AND/OR PARALLEL TO BUILDING STRUCTURE. EQUIPMENT 1. PROVIDE EQUIPMENT AS SHOWN ON EQUIPMENT SCHEDULES AND PLAN NOTES. SUBSTITUTIONS TO LISTED EQUIPMENT SHALL BE AT RISK OF CONTRACTOR. SUBSTITUTIONS SHALL ONLY BE ALLOWED IF ITEMS ARE EQUAL IN ALL ASPECTS. 2. PROVIDE SUBMITTALS TO ELECTRICIAN AS REQUIRED FOR COORDINATION OF ALL REQUIRED ELECTRICAL POWER WIRING. INCLUDE WIRING DIAGRAMS AND CABLING REQUIREMENTS FOR REFERENCE. COORDINATE ALL INTERLOCKS AS NEEDED. PROVIDE SINGLE POINT CONNECTION KITS AS NEEDED. 3. INSTALL ALL EQUIPMENT IN FULL ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND CLEARANCE REQUIREMENTS. PROVIDE ALL REQUIRED MOUNTING OR HOUSEKEEPING PADS. G.C. SHALL PROVIDE LEVEL GRADE FOR EXTERIOR MOUNTED EQUIPMENT. P.C. SHALL PROVIDE ALL HOISTING AND RIGGING NEEDED TO SET ALL PLUMBING EQUIPMENT. 4. ALL EQUIPMENT SHALL BE INSTALLED AS NEEDED TO PREVENT OBJECTIONABLE NOISE AND/OR VIBRATION. P.C. SHALL PROVIDE VIBRATION PADS, SPRING ISOLATORS, ATTENUATORS AND ACCESSORIES AS NEEDED. 5. PROVIDE ALL BLOCKING, HANGERS, SHELVES, BRACKETS ETC. AS REQUIRED TO INSTALL ALL PLUMBING EQUIPMENT. 6. INSTALL WATER HEATERS IN ACCORDANCE WITH NFPA-70, AND THE NATIONAL ELECTRICAL CODE. PROVIDE BRASS DRAIN VALVE, 3/4" RELIEF VALVE AND COLD WATER DIP TUBE. INSTALL HEATERS PER MANUFACTURES INSTALLATION INSTRUCTIONS. PROVIDE SHUT-OFF VALVES FOR SERVICE WORK. 7. THERMOSTATS ON WATER HEATER SHALL NOT BE USED FOR LIMITING HOT WATER TEMPERATURES. P.C. SHALL PROVIDE MIXING VALVES FOR HOT WATER TO ALL HANDS-FREE FAUCETS ACCESSIBLE TO OCCUPANTS. MIXING VALVE SYSTEMS SHALL LIMIT WATER TEMPERATURE AT FAUCETS TO 110 DEG F. OR LESS. 8. PROVIDE SCHEDULE 40 PVC PIPING AND FITTINGS FOR ALL COMBUSTION AIR AND VENT PIPING IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS ON ALL DIRECT VENT WATER HEATERS OR BOILERS. FIXTURES 1. REFERENCE FIXTURE SCHEDULES ON PLANS AND PROVIDE ALL REQUIRED CARRIERS, BLOCKING, HANGERS, TAIL PIECES, TRAPS, RISERS, ESCUTCHEONS, GRIDS, PUTTY, GASKETS, CAULKING, ETC. AS REQUIRED TO INSTALL ALL PLUMBING FIXTURES. 2. REVIEW SUBMITTALS FOR ALL OWNER PROVIDED EQUIPMENT AND PROVIDE ANY REQUIRED ACCESSORIES AS NEEDED FOR A COMPLETE INSTALLATION. P.C. SHALL BE RESPONSIBLE TO RECEIVE AND INSTALL ALL OWNER PROVIDED FIXTURES. 3. FIXTURES DESIGNATED FOR HANDICAP ACCESSIBILITY SHALL COMPLY WITH ANSI A 117.1, LATEST EDITION, INCLUDING ADOPTED INDIANA AMENDMENTS. 4. PROVIDE ALL CODE REQUIRED BACKFLOW DEVICES FOR PROCESS HVAC EQUIPMENT AND FOR WATER SERVING ANY DRINKING OR FOOD PREPARATION FIXTURES. 5. PROVIDE BELLOWS TYPE WATER HAMMER ARRESTERS, STAINLESS STEEL CASHING AND BELLOWS, 250 PSI, INSTALL PER PDI STANDARD WH201. PIPING 1. ALL EXPOSED SUPPLY PIPES AND METAL TRIM IN CONNECTION WITH THE FIXTURES SHALL BE CHROME PLATED RED BRASS OR BRONZE, PROVIDE CHROME PLATED STOP VALVES IN ALL SUPPLIES TO ALL FIXTURES. PLASTIC STOPS OR TRIM SHALL NOT BE ACCEPTABLE. CAULK ALL FIXTURES WITH WATERPROOF SILICONE CAULK. TRAPS SHALL HAVE CLEANOUT PLUGS. INSTALL ONE PIECE CHROME ESCUTCHEON PLATE WITH SET SCREW AT WALL PENETRATIONS. 2. THE MINIMUM SLOPE OF A HORIZONTAL DRAINAGE PIPE SHALL BE: a. 1/4" PER FOOT FOR PIPES UP TO 2-1/2". b. 1/8" PER FOOT FOR PIPES 3" TO 6". c. 1/16" PER FOOT FOR PIPES 8" OR LARGER. MAINS AND LATERAL BRANCHES SHALL BE SLOPED TOWARD THE BUILDING DRAIN. ALL PIPING SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH THE CURRENT PLUMBING CODE AND PER THE AUTHORITY HAVING JURISDICTION. 3. CLEAN OUTS SHALL BE INSTALLED WITH IN 5' OF THE FOUNDATIONS AND AT THE BASE OF EACH STORM AND WASTE STACK, AND AT NOT MORE THAN 75 FOOT INTERVALS ON ALL HORIZONTAL RUNS, AT THE HIGH POINT OF THE BUILDING DRAIN AND PER THE CURRENT PLUMBING CODE. 4. VERIFY LOCATION, DEPTH AND SIZE OF SANITARY SEWER CONNECTION POINTS. CONNECT AS REQUIRED. OUTSIDE SEWER SHALL BE INSTALLED WITH MINIMUM OF 3'-0" COVER. COORDINATE CONNECTIONS WITH SITE CONTRACTOR AND LOCAL UTILITY 5. ALL OUTSIDE WATER PIPING SHALL BE COVERED PER LOCAL REQUIREMENTS OR WITH A MINIMUM BELOW PREDICTED FROST LINE WHICH EVER IS GREATER. 6. ALL INTERIOR PIPING PENETRATIONS THROUGH WALLS, CEILINGS, ROOFS AND FLOORS SHALL BE SLEEVED AND SEALED. PROVIDE UL LISTED FIRE STOPPING WHERE REQUIRED. 7. ALL EXTERIOR UNDERGROUND PENETRATIONS OF BUILDING FOUNDATIONS OR SLAB FLOORS SHALL BE SLEEVED AND SEALED. PENETRATIONS BELOW GRADE INTO THE BUILDING SHALL BE DONE WITH MECHANICAL SEALS LIKE "LINK SEAL" OR EQUAL. 8. ALL PIPING PASSING THROUGH CONCRETE OR CINDER WALLS OR SUBJECT TO EXPOSURE TO CONCRETE SHALL BE TAPED, SLEEVED OR INSULATED TO PREVENT DIRECT CONTACT WITH CONCRETE. 9. NO PLUMBING PIPING SHALL PASS DIRECTLY OVER ELECTRICAL PANELS OR DISTRIBUTION CABINETS. PRIOR TO ROUGH IN COORDINATE WITH E.C. 10. DIELECTRIC UNIONS SHALL BE USED TO CONNECT DISSIMILAR METALS OR METAL PIPING SHALL HAVE METAL CONNECTIONS ON EACH END THREADED TO MATCH THE ADJACENT PIPING. METAL COMPONENTS SHALL BE SEPARATED BY A NYLON INSULATOR TO PREVENT CURRENT FLOW BETWEEN DISSIMILAR METALS. UNIONS SHALL BE SUITABLE FOR THE SYSTEM OPERATING PRESSURES AND TEMPERATURE WELD TYPE: ASTM A-234. 11. PIPING SLEEVES; INTERIOR OR EXTERIOR ABOVE GRADE; GALVANIZED-STEEL-PIPE SLEEVES OR PVC-PIPE SLEEVES. VERIFY, WITH FIRE AUTHORITIES HAVING JURISDICTION, THAT PVC MATERIALS ARE ALLOWED FOR SLEEVES. BELOW GRADE; ALL; MECHANICAL GALVANIZED-STEEL PIPE SLEEVE SYSTEM LIKE LINK-SEAL. ALL SLEEVES SHALL BE FIRE STOPPED OR CAULKED. EXTERIOR SLEEVES SHALL PROVIDE WATER/AIR TIGHT PENETRATION SYSTEM. 12. PROVIDE HANGERS PER MSS AND IPC STANDARDS BASED ON PIPING TYPES AND SIZES. WHERE EXPOSED TO VIEW IN PUBLIC SPACES, RODS SHALL BE GALVANIZED. 13. VALVES: 2" AND SMALLER SHALL BE LIKE CRANE (3) PIECE 3800 SERIES BALL OR 438 SERIES GATE VALVES. 2-1/2" OR LARGER SHALL BE LIKE CRANE SERIES G-3500 BALL OR 465 GATE VALVES. 14. UNIONS: PROVIDE AND INSTALL UNIONS AS REQUIRED FOR THE INSTALLATION AND REMOVAL OF ALL EQUIPMENT. 15. STOPS: ALL FIXTURES SHALL BE INSTALLED WITH METAL 14 TURN CHROME PLATED PLUMBING STOPS COMPATIBLE WITH PIPING MATERIAL SERVING FIXTURES. 16. PIPING MATERIALS UNLESS OTHERWISE NOTED ON THE PLANS SHALL BE AS FOLLOWS: GAS/AIR ABOVE GRADE, 2" AND SMALLER; BLACK STEEL SCHEDULE 40 TYPE E OR S PIPE GRADE B; ASTM A53 / A53M, A105 OR A120 WITH THREADED ENDS; FITTINGS SHALL BE MALLEABLE IRON THREADED FITTINGS ASTM B16.3 CLASS 150. WATER COPPER TUBING (INSIDE BUILDING WATER ROOM AND PIPING TO CARWASH): ASTM B 88, TYPE 'L' HARD WATER TUBE DRAWN TEMPER. WITH CAST-COPPER SOLDER-JOINT FITTINGS: ANSI B16.18. OR WROUGHT-COPPER SOLDER JOINT FITTINGS: ANSI B16.22 OR 200 PSIG, 250 °F PRESS FIT FITTINGS TO ASTM B75, AND ASME B16/51 PERFORMANCE. WATER BUILDING MAINS OUTSIDE OF WATER ROOM 2" AND SMALLER: FLOW GUARD GOLD OR EQUAL SDR 11 CPVC; PIPING ASTM D 2846 WITH SOCKET WELDED FITTINGS ASTM F 493. MADE FROM CPVC CELL CLASS 24448 ASTM D 1784. MANUFACTURED PER NSF 14 AND 61. SEWER/VENT POLYVINYL CHLORIDE SEWER PIPE (PVC): ASTM D2665, ASTM F 1866 SCHEDULE 40 SOLID CORE DRAIN WASTE AND VENT WITH PVC SOCKET WELDED FITTINGS DESIGNED TO FIT PIPING DIAMETERS. ALL PIPING IN RETURN AIR PLENUMS SHALL CONFORM TO REQUIREMENTS FOR PLENUM MATERIALS. PLUMBING INSULATION 1. ALL PIPING INSULATION MATERIALS SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS (ON THE FLAME SPREAD TEST SCALE) AND SMOKE DEVELOPMENT OF 50 OR LESS (ON THE SMOKE TEST SCALE) OR AS DEFINED BY NFPA 255 STANDARD METHOD OF TESTING OF SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, LOCAL CODES AND LOCAL AUTHORITIES HAVING JURISDICTION. ALL PVC PIPING LOCATED IN RETURN AIR PLENUM SPACES OR EXPOSED SHALL BE INSULATED. 2. INSTALL ALL INSULATION IN STRICT ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS IN A TIGHT AND NEAT MANOR. NO SAGGING, FRAYED OR TORN INSULATION WILL BE EXCEPTED. 3. ALL INSULATION R-VALUES SHALL MEET THE CURRENT ENERGY CODE REQUIREMENTS. UNLESS OTHERWISE NOTED ON PLANS PIPING SYSTEMS SHALL BE INSULATED AS FOLLOWS: a. HOT WATER RE-CIRCULATION SYSTEMS; ALL HW AND HWR PIPING SHALL BE INSULATED b. NON RE-CIRCULATION HOT WATER STORAGE SYSTEMS; THE FIRST 8 FEET OF HW AND CW PIPING CONNECTED TO THE STORAGE TANK. c. COPPER WATER PIPING; ALL PIPING HOT OR COLD SHALL BE INSULATED. 4. STORM WATER PIPING EXPOSED IN BUILDING SHALL BE INSULATED FOR SOUND WITH MINIMUM 1 2" THICK ELECTROMETRIC CLOSED CELL INSULATION. 5. INSULATION MATERIALS: a. PRE-FORMED TYPE I, 850 DEG F MINERAL OR GLASS FIBERS BONDED WITH A THERMOSETTING RESIN AND HINGED WITH SELF SEALING LAP. COMPLY WITH ASTM C 547, TYPE I, GRADE A, WITH FACTORY-APPLIED ASJ. b. FLEXIBLE ELASTOMERIC CLOSED CELL OR EXPANDED RUBBER PIPE INSULATION WITH PRESSURE SENSITIVE ADHESIVE SYSTEM, ASTM C534, ASTM E84 CLASS A 300 DEG F. c. EXTERIOR/EXPOSED JACKETS: UV RESISTANT PVC PIPE JACKETS AND PREFORMED FITTING COVERS COMPLIANT WITH ASTM D257, D638, D790, D792, D1784, D3679, E84 AND E136. FIRE STOPPING. a. FIRE STOPPING SYSTEMS SHALL BE IN FULL COMPLIANCE WITH SECTIONS 714 OF THE IBC AND SECTION 315 OF THE IPC. b. CONTRACTOR SHALL MAKE REFERENCE TO ARCHITECTURAL PLANS AND PROVIDE ALL REQUIRED FIRE STOPPING SYSTEMS. c. CONTRACTOR SHALL PROVIDE AHJ WITH FULL SUBMITTAL INDICATING METHODS OF CONSTRUCTION AND UL LISTINGS FOR EACH REQUIRED FIRE STOP SYSTEM. d. ACCESS DOORS REQUIRED IN CEILINGS OF FIRE-RESISTANCE-RATED FLOOR/CEILING AND ROOF/CEILING ASSEMBLIES SHALL BE TESTED IN ACCORDANCE WITH ASTM E 119 OR UL 263 AS HORIZONTAL ASSEMBLIES AND LABELED BY AN APPROVED AGENCY FOR SUCH PURPOSE. CHECK TEST AND START UP REQUIREMENTS 1. LABEL ALL MAJOR PIECES OF EQUIPMENT WITH LAMACOID PLASTIC, BLACK WITH WHITE LETTERS. SIZE TO BE CONSISTENT WITH EQUIPMENT BEING LABELED. LENGTH AND WIDTH VARY FOR REQUIRED LABEL CONTENT. 2. PLUMBING CONTRACTOR SHALL FURNISH ALL TOOLS, INSTRUMENTS AND EQUPMENT REQUIRED FOR TESTING PIPING. ALL TESTING SHALL BE DONE PRIOR TO CONCEALMENT. ALL PARTS OF THE SANITARY DRAINAGE SYSTEM SHALL BE TESTED AS REQUIRED BY LOCAL PLUMBING INSPECTORS. ALL WATER PIPING SHALL BE HYDROSTATICALLY TESTED TO MINIMUM 125 PSIG. 3. CLOSE OUT: PROVIDE MANUFACTURERS OPERATION AND MAINTENANCE MANUALS AND AS BUILT DRAWINGS. PROVIDE (1) TRAINING SESSION TO OWNER SELECTED PERSONNEL AS REQUESTED AND PROVIDE WARRANTY INFORMATION FOR ALL MANUFACTURERS WARRANTED EQUIPMENT 4. FILL SYSTEMS WITH FRESH WATER AND INSPECT ALL CONNECTIONS FOR LEAKAGE. REMOVE ALL PACKING AND PROTECTIVE SHIPPING MATERIALS. CLEAN ALL FIXTURES AND START-UP ALL WATER HEATERS, PUMPS, AND EQUIPMENT. VERIFY PROPER OPERATION. OPERATE ALL FAUCETS AND INSPECT STOPS, RISERS, TRAPS AND DRAINS. CORRECT ALL LEAKS, WATER HAMMER AND VIBRATIONS AS REQUIRED. AFF ABOVE FINISHED FLOOR BTUH BRITISH THERMAL UNIT PER HOUR CA COMBUSTION AIR CO CLEAN OUT CW COLD WATER DCV DUAL CHECK VALVE EC ELECTRICAL CONTRACTOR ERT EMERGENCY ROOF DRAIN TERMINAL FD FLOOR DRAIN FT FEET GC GENERAL CONTRACTOR GM GAS METER GPM GALLONS PER MINUTE HW HOT WATER HWR HOT WATER RETURN IN INCH LAV LAVATORY MAN MANUAL MFR MANUFACTURER MC MECHANICAL CONTRACTOR MS MOP SINK ORD OVERFLOW ROOF DRAIN PC PLUMBING CONTRACTOR PD PRESSURE DROP PRV PRESSURE RELIEF VALVE PSI POUNDS PER SQUARE INCH RD ROOF DRAIN RPM REVOLUTIONS PER MINUTE RPZB REDUCED PRESSURE ZONED BACKFLOW SAN SANITARY SEWER SK SINK STM STORM SEWER TMV THERMAL MIXING VALVE UON UNLESS OTHERWISE NOTED UR URINAL VIF VERIFY IN FIELD VTR VENT THORUGH ROOF WC WATER CLOSET WH WATER HEATER WS WATER SOFTENER OLOIL/SAND/DIRT DRAIN LINE 12/28/21