HomeMy WebLinkAboutP100 - FIRST FLOOR PLUMBING PLANOL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL
OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OL OLOLOLOLSAN SAN SANSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN3"FD
OI
OL4"
3"
4"
4"
4"
4"
4"
CO
CO
CO
30 FT. TD
25 FT. TD
OL OL
OL OL OL OL OL OL OL OL OL OLOL OL OL OL OL OL OL OL OL OL
OL OL2"
EEW
4"
4"
4" 2"W UP
2"V UP
2"V UP
CO
CO1-1/4"V UP
WCWCMS
LAV
LAV2"FD
2"FD
SANSANSAN3"
3"
3"
SAN
WB
SAN
2"
SK
FFE = 742.5
IE = 738.5
3"
OL OLOL 4"
2"FD
3"FD
OL OLOL
3"FD
30 FT. TD 30 FT. TD
20 FT. TD
CO
CO
P100
FIRST FLOOR
PLUMBING PLAN
DRAWING ISSUE HISTORY
ADLS ISSUE:
CONSTR ISSUE:
COPYRIGHT 2021
210422
JP
JP
AS NOTED
PROJECT NO:
DRAWING DATE:
DRAWN BY:
CHECKED BY:
DRAWING SCALE: CARMEL DETAIL CENTER4250 E 96th STREETINDIANAPOLIS, INDIANAA u t o m o t i v e G r o u pN BID / PERMIT ISSUE:MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office 11-10-21
11-10-21
11/10/2021
1 SCALE: 1/8" = 1'-0"
FIRST FLOOR PLUMBING PLAN
4" SANITARY SERVICE. SEE CIVIL PLANS FOR
CONTINUATION.
KEY NOTES:
1. REFERENCE SHEET P001 FOR LEGENDS,
ABBREVIATIONS, SPECIFICATIONS AND NOTES.
2. REFERENCE SHEET P002 FOR DETAILS.
3. REFERENCE SHEET P003 FOR SCHEDULES AND
BUILDING ISOMETRIC DIAGRAM.
4. ALL SANITARY LINES ARE LOCATED BELOW
FINISHED FLOOR LEVEL.
GENERAL NOTES:
1
1
12/28/21