Loading...
HomeMy WebLinkAboutP101 - FIRST FLOOR PIPING PLANEPEP CWCW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW HWS CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CACA CA CA CA CA CA CA CA CA CA CA CACA CACA CACA CACA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CACW CW CW CW CW CW CW CW CW CW CWCACACA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA W D RPZ WH HWSCWIWH TMVEEW CW 1-1/2" CW 1/2" CW 2" 1-1/2" 1/2"1-1/2" CW1/2" 2" CA 2" CA 2" CA2" 3/4" CW 3/4" CA3/4" 3/4" IMB GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS EP EP SIM-1 MANIFOLD 1 (117.9 °F) 1"GAS1-1/4"GAS UP GAS GASGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGAS GAS GAS GAS GAS GAS GAS3/4"GAS3/4"GAS3/4"GASWCWCMS LAV LAV WB SK CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW3/4" CWHB-2 CWCWHB HB CW CW CW CW CW CW CW CW CW CW CW CW CWCW CW CW CWCW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CWCWCWCWCWCWCA CA CA CAGAS HWSCWCW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW 1" 3/4"CA3/4" CA3/4" CA3/4" CA2" CA 2" CA GAS GAS GAS GAS GAS GAS 3/4" CA3/4" CA3/4" CACA3/4" CACA3/4" CA2" CA1-1/2" CW CW CW CW 1" CW3/4" CW3/4" CW 3/4" CW 1" CW CA CA CA CA CA CA CA CA CA GAS GAS 3/4"GAS3/4"GAS 3/4"GAS GAS GAS GAS CA 3/4"GAS GAS GAS GAS GAS GAS GAS 3/4"GAS GAS GAS GAS GAS GAS GAS GASGAS 3/4"GAS SEE SHEET P200 FOR GAS LINE CONTINUATION.GAS GAS GAS GAS GAS GAS3/4"GASHB-2 1"1" P101 FIRST FLOOR PIPING PLAN DRAWING ISSUE HISTORY ADLS ISSUE: CONSTR ISSUE: COPYRIGHT 2021 210422 JP JP AS NOTED PROJECT NO: DRAWING DATE: DRAWN BY: CHECKED BY: DRAWING SCALE: CARMEL DETAIL CENTER4250 E 96th STREETINDIANAPOLIS, INDIANAA u t o m o t i v e G r o u pN BID / PERMIT ISSUE: MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office 11-10-21 11-10-21 11/10/2021 1 SCALE: 1/8" = 1'-0" FIRST FLOOR PIPING PLAN 2" DOMESTIC WATER SERVICE. SEE CIVIL PLANS FOR CONTINUATION. PROVIDE AND INSTALL 1,500 MBH, 2 PSIG GAS SERVICE AND METER. PROVIDE 1-1/4" GAS LINE FROM METER TO BUILDING. a. (2) RTU'S 480 MBH b. (6) IR HEATERS 750 MBH c. (1) BOILER 110 MBH d. (1) FURNACE 40 MBH TOTAL 1,340 MBH CONNECT GAS LINE TO EQUIPMENT AS REQUIRED. SEE SHEET P002 FOR GAS CONNECTION DETAIL. PROVIDE 1" CW LINES TO INSTAKLEEN CONTROL PANEL. SEE BELANGER CARWASH PLANS FOR MORE INFORMATION. PROVIDE 3/4" CW LINES TO REVERSE OSMOSIS SYSTEM. SEE BELANGER CARWASH PLANS FOR MORE INFORMATION. PROVIDE 3/4" CA LINE TO GYRO WRAP AIR PANEL. SEE BELANGER CARWASH PLANS FOR MORE INFORMATION. PROVIDE ADD ALTERNATE FOR CARWASH WATER SOFTENER. PROVIDE 1" CW TO 10 HP PRESSURE WASHER AND 3/4" CW TO 5 HP PRESSURE WASHER. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 2 1 2 3 4 4 5 5 6 6 7 7 8 8 3 3 3 3 3 3 3 12/28/21