HomeMy WebLinkAboutP101 - FIRST FLOOR PIPING PLANEPEP CWCW CW
CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW
HWS
CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CACA CA CA CA CA CA CA CA CA CA CA CACA CACA CACA CACA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CACW CW CW CW CW CW CW CW CW CW CWCACACA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA
CA
W D
RPZ
WH HWSCWIWH
TMVEEW CW 1-1/2" CW
1/2" CW
2"
1-1/2"
1/2"1-1/2" CW1/2"
2" CA
2" CA 2" CA2"
3/4" CW
3/4" CA3/4" 3/4"
IMB
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
EP EP
SIM-1
MANIFOLD 1
(117.9 °F) 1"GAS1-1/4"GAS UP GAS GASGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGAS GAS GAS GAS GAS GAS GAS3/4"GAS3/4"GAS3/4"GASWCWCMS
LAV
LAV
WB
SK
CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW3/4" CWHB-2 CWCWHB HB CW CW CW CW CW CW CW CW CW CW CW CW CWCW CW CW CWCW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CWCWCWCWCWCWCA CA CA CAGAS HWSCWCW CW CW CW CW CW CW CW CW CW CW CW
CW CW CW CW CW CW CW CW CW CW CW CW
CW CW
1"
3/4"CA3/4" CA3/4" CA3/4" CA2" CA 2" CA
GAS GAS GAS GAS GAS GAS 3/4" CA3/4" CA3/4" CACA3/4" CACA3/4" CA2" CA1-1/2" CW CW CW CW 1" CW3/4" CW3/4" CW
3/4" CW 1" CW
CA CA CA CA CA CA CA CA CA
GAS GAS 3/4"GAS3/4"GAS 3/4"GAS
GAS GAS GAS
CA
3/4"GAS
GAS GAS GAS GAS GAS GAS
3/4"GAS GAS GAS GAS GAS GAS GAS GASGAS
3/4"GAS
SEE SHEET P200 FOR GAS
LINE CONTINUATION.GAS GAS GAS GAS GAS GAS3/4"GASHB-2
1"1"
P101
FIRST FLOOR
PIPING PLAN
DRAWING ISSUE HISTORY
ADLS ISSUE:
CONSTR ISSUE:
COPYRIGHT 2021
210422
JP
JP
AS NOTED
PROJECT NO:
DRAWING DATE:
DRAWN BY:
CHECKED BY:
DRAWING SCALE: CARMEL DETAIL CENTER4250 E 96th STREETINDIANAPOLIS, INDIANAA u t o m o t i v e G r o u pN BID / PERMIT ISSUE: MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office 11-10-21
11-10-21
11/10/2021
1 SCALE: 1/8" = 1'-0"
FIRST FLOOR PIPING PLAN
2" DOMESTIC WATER SERVICE. SEE CIVIL PLANS
FOR CONTINUATION.
PROVIDE AND INSTALL 1,500 MBH, 2 PSIG GAS
SERVICE AND METER. PROVIDE 1-1/4" GAS LINE
FROM METER TO BUILDING.
a. (2) RTU'S 480 MBH
b. (6) IR HEATERS 750 MBH
c. (1) BOILER 110 MBH
d. (1) FURNACE 40 MBH
TOTAL 1,340 MBH
CONNECT GAS LINE TO EQUIPMENT AS REQUIRED.
SEE SHEET P002 FOR GAS CONNECTION DETAIL.
PROVIDE 1" CW LINES TO INSTAKLEEN CONTROL
PANEL. SEE BELANGER CARWASH PLANS FOR
MORE INFORMATION.
PROVIDE 3/4" CW LINES TO REVERSE OSMOSIS
SYSTEM. SEE BELANGER CARWASH PLANS FOR
MORE INFORMATION.
PROVIDE 3/4" CA LINE TO GYRO WRAP AIR PANEL.
SEE BELANGER CARWASH PLANS FOR MORE
INFORMATION.
PROVIDE ADD ALTERNATE FOR CARWASH WATER
SOFTENER.
PROVIDE 1" CW TO 10 HP PRESSURE WASHER AND
3/4" CW TO 5 HP PRESSURE WASHER.
KEY NOTES:
1. REFERENCE SHEET P001 FOR LEGENDS,
ABBREVIATIONS, SPECIFICATIONS AND NOTES.
2. REFERENCE SHEET P002 FOR SCHEDULES AND
DETAILS.
3. REFERENCE SHEET P003 FOR DETAILS.
GENERAL NOTES:
1
2
1
2
3
4
4
5
5
6
6
7
7
8
8
3
3
3
3
3
3
3
12/28/21