Loading...
HomeMy WebLinkAboutP200 - ROOF PLUMBING PLANGAS GASGAS GAS GAS GAS GAS GAS GAS GAS 3/4" GAS 3/4" GAS1" GASGAS GASP200 ROOF PLUMBING PLAN DRAWING ISSUE HISTORY ADLS ISSUE: CONSTR ISSUE: COPYRIGHT 2021 210422 JP JP AS NOTED PROJECT NO: DRAWING DATE: DRAWN BY: CHECKED BY: DRAWING SCALE: CARMEL DETAIL CENTER4250 E 96th STREETINDIANAPOLIS, INDIANAA u t o m o t i v e G r o u pN BID / PERMIT ISSUE: MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office 11-10-21 11-10-21 11/10/2021 1 SCALE: 1/8" = 1'-0" ROOF PLUMBING PLAN ROUTE 1-1/4" GAS LINE UP FROM BELOW AND TO ROOF TO SERVE RTU'S. SEE SHEET P101 FOR CONTINUATION. PROVIDE SLEEVE FOR GAS PIPE THRU EXTERIOR WALL. SEAL AND WEATHER PROOF OPENING AS REQUIRED. SEE SHEET P101 FOR CONTINUATION. CONNECT GAS LINE TO EQUIPMENT AS REQUIRED. SEE SHEET P002 FOR GAS CONNECTION DETAIL. ROUTE 3/4" GAS DOWN THROUGH ROOF TO SERVE RADIANT HEATER. SEE SHEET P101 FOR CONTINUATION. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 2 2 1 3 3 3 4 4 12/28/21