HomeMy WebLinkAboutC100 STORMWATER POLLUTION PREVENTION PLANMEETING HOUSE ROADWWWWWWWWWCCCCCCCCCCCCCCCCCCCCCFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOS
AN
S
A
N
S
AN
S
A
N
S
A
N
S
A
N
S
AN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANBUILDING 9
BLOCK "F"
BLOCK
"F"
PARCEL #17-09-28-00-07-002.000
S00°08'09"E 25.00'
N89°51'51"E 85.50'
N00°08'09"W 25.00'
S89°51'51"W 85.50'SDSDSDSDSDSD
5
1
2
3
STOCKPILE AREA(IF NEEDED)IP
IPSDSDSDSDSDSD4
4
4
DDDDDDDDDDDDDDDDD D D D D D D D D D
6
C100STORMWATER POLLUTION PREVENTION PLANw160607-C100 swppp1GENERAL NOTES
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
WITH THE OWNER DURING BIDDING AND DURING CONSTRUCTION
ACTIVITIES ALL ITEMS TO BE REMOVED. IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO REMOVE ANY MATERIALS AND/OR
STRUCTURES NOT LOCATED ON THIS SURVEY FOR THE
INSTALLATION OF THE NEW WORK.
2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF WORK,
AND TO VERIFY WHICH UTILITIES WILL BE REMOVED BY UTILITY
COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY THE UTILITY
COMPANY SHALL BE REMOVED BY THE CONTRACTOR.
3. UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE
RELOCATED AND/OR CAPPED AND ABANDONED BEFORE
CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4. ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE
PROPERTY OF THE DEMOLITION CONTRACTOR AND SHALL BE
PROPERLY DISPOSED OF OFF THE SITE.
5. SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN OFF
THE SITE.
6. ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT ARE
REMAINING. NO UTILITY SERVICE SHALL BE INTERRUPTED DURING
THE CONSTRUCTION PROCESS.
7. BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR
REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT
INFORMATION.
8. ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE NOT
SHOWN ON THE PLAN AS BEING REMOVED MAY BE DONE SO, AS
LONG AS THE TREE(S) ARE RELOCATED TO AN APPROVED
ALTERNATIVE LOCATION ON SITE.
9. IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION
PLAN, PLEASE CONTACT THE ENGINEER BEFORE CONTINUING
WORK.
10. CONTRACTOR SHALL DETERMINE LOCATION OF THE STOCKPILE
LOCATION AS NEEDED.
EXISTING AREAS
TOTAL SITE = 0.05 AC.
DISTURBED = 0.15 AC.
PERVIOUS = 0.15 AC.
IMPERVIOUS = 0.00 AC.
SWPPP PHASE 1 LEGEND
IP
SF
D
EROSION CONTROL NOTES
1. ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
LOCATION OF LANDSCAPE BEDS.
2. INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE
TO FOLLOW CONTOUR.
3. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN
THE STREET.
CONTACT PERSON FOR EROSION
CONTROL & SEDIMENT PRACTICES
EROSION CONTROL SPECIFICATIONS
1. THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2. TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
3. PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
4. PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
5. ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
EFFECTIVENESS.
6. IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR
OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
FULL STAND OF GRASS HAS BEEN OBTAINED.
8. THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL
IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER.
9. IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY
TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION
ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH
"RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY
CONSTRUCTION ACTIVITY.
10. FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
11. PORTABLE TOILETS MUST BE ANCHORED.
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
EMAIL: PARKERF@WEIHE.NET
CONTACT PERSON: FRED PARKER, CPESC
SITE PREPARATION / SWPPP PHASE 1 NOTES
INSTALL PERMIT POSTING AREA. 4" PVC TUBE WITH END CAPS ATTACHED TO
PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION
DRAWINGS AND PERMITS FOR INSPECTORS.
INSTALL CONSTRUCTION ENTRANCE. REFER TO DETAIL ON SHEET C101
INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C101
INSTALL SILT FENCE OR SILT DIKE. REFER TO DETAIL ON SHEET C101
STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING AREA, AND
PORT-O-LET AS NEEDED.
TREE PRESERVATION FENCE. REFER TO DETAIL ON SHEET C301
1
2
3
4
5
LINE TYPES
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
AERIAL COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
RIGHT OF WAY LINE
CHAIN LINK FENCE
BOARD FENCE
WROUGHT IRON FENCE
GUARD RAIL
HAND RAIL
SILT FENCE
BUILDING SETBACK LINE
BOUNDARY LINE
FLOW LINE
G G G
W W
E(A)E(A)
E E E
C C C
C(A)C(A)
OHU OHU
FM FM
SF SF
AERIAL FIBER OPTIC CABLEFO(A)FO(A)
SECTION LINE
FARM FENCE
UNDERGROUND FIBER OPTICFOFO
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER
STORM SEWER
- INLET PROTECTION - USE SUBSURFACE
INLET PROTECTION WITH OVERFLOW
CAPABILITY (DANDY SAC)
- CONSTRUCTION ENTRANCE
- STAGING AREA
- POSTING AREA - 4" PVC TUBE WITH END CAPS
ATTACHED TO PROJECT CONSTRUCTION SIGN TO
CONTAIN APPROVED CONSTRUCTION DRAWINGS AND
PERMITS FOR INSPECTORS.
- CONCRETE WASHOUT
- STOCKPILE AREA (TEMPORARY SEEDING
REQUIRED)
- SILT FENCE / SILT DIKE
- LIMITS OF DISTURBANCE
BENCHMARK INFORMATION
ORIGINATING BENCHMARK
DEPARTMENT OF NATURAL RESOURCES STANDARD DISK STAMPED "LEE 2 AZ" SET IN CONCRETE
LOCATED AT THE SOUTHEAST CORNER OF THE INTERSECTION OF SHELBORNE ROAD AND 131ST
STREET, 26.1 FEET EAST OF THE CENTERLINE OF SHELBORNE ROAD AND 20.3 FEET SOUTH OF THE
CENTERLINE OF 131ST STREET.
ELEVATION: 917.52 NAVD 1988
- PERMANENT SEEDING
USE PLANTING CHART
- TREE PROTECTION.
LAND DESCRIPTION
A PART OF BLOCK "F" IN VILLAGE OF WESTCLAY, SECTION 3001-A, VILLAGE CENTER, PART
2, PER PLAT THEREOF RECORDED IN PLAT CABINET 2, SLIDE 363, AS INSTRUMENT NO.
199909969687 IN THE OFFICE OF THE RECORDER OF HAMILTON COUNTY, INDIANA,
DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHEAST CORNER OF BLOCK "F" ALSO THE INTERSECTION OF
THE WEST LINE OF MEETING HOUSE ROAD AND THE NORTH LINE OF RHETTSBURY
STREET POINT BEING ON A CURVE CONCAVE EASTERLY HAVING A RADIUS OF 1037.50
FEET THE RADIUS POINT OF WHICH BEARS NORTH 86 DEGREES 01 MINUTES 06 SECONDS
EAST; THENCE NORTHERLY ALONG THE WEST RIGHT OF WAY LINE OF MEETING HOUSE
ROAD AND ALONG SAID CURVE 69.64 FEET TO A POINT WHICH BEARS SOUTH 89 DEGREES
51 MINUTES 51 SECONDS WEST FROM SAID RADIUS POINT; THENCE NORTH 00 DEGREES
08 MINUTES 09 SECONDS WEST ALONG SAID WEST LINE 199.42 FEET TO THE NORTHEAST
CORNER OF PARCEL AS DESCRIBED IN INSTRUMENT NUMBER 2010071301 IN SAID OFFICE
OF THE RECORDER AND BEING THE POINT OF BEGINNING; THENCE SOUTH 89 DEGREES
51 MINUTES 51 SECONDS WEST 85.50 FEET; THENCE NORTH 00 DEGREES 08 MINUTES 09
SECONDS WEST 23.45 FEET; THENCE NORTH 89 DEGREES 51 MINUTES 51 SECONDS EAST
85.50 FEET; THENCE SOUTH 00 DEGREES 08 MINUTES 09 SECONDS EAST 23.45 FEET TO
THE POINT OF BEGINNING CONTAINING 0.046 ACRES, MORE OR LESS.REVISIONS AND ISSUESW16.0607PREPARED FOR:PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W16.0607DATEBY10.08.2021MLTDATE:RLWKnow what'sbelow.
before you dig.Call
R
D.B. KLAIN CONSTRUCTION, LLCVILLAGE OF WEST CLAY LOT 8SUBMITTED FOR REVIEW10.04.2021RLWW
S
N
E ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netB uild with conf idence.S MPART OF BLOCK "F", VILLAGE OF WEST CLAY, CLAY TOWNSHIP, HAMILTON COUNTY, INDIANAMEETINGHOUSE ROAD, CARMEL, INDIANA 46032RUSSELL L. WEBSTER II, PE No. 11900318
10/8/2021RUSSELL L .WEBST
ER IIPROFESSIONA L E N GINEERREGIS T ER
E
DINDIA N A
No. PE11900318
STATE OFFINAL CONSTRUCTION PLANS10.08.2021RLWSD
6
01/11/22