Loading...
HomeMy WebLinkAboutC300 DEVELOPMENT PLANWWWS A N S A N S AN S A N S A N S A N S A N S AN SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANBUILDING 9 BLOCK "F" BLOCK "F" PARCEL #17-09-28-00-07-002.000 CC C C CEEEE E E MEETING HOUSE ROADBUILDING 8 GFA = 1,600 S.F. FFE = 897.90 LOCAL ELEV=896.68 (CLOSEST INLET CASTING) POND #8 100-YR ELEV=889.25 M.F.P.G. = 891.25 M.L.A.G. = 897.88 CLEANOUT TOC=897.5± INV=893.0± W W W W SANSANCONNECT TO EXISTING LATERAL, PROVIDE CLEANOUT AS NECESSARY G G S00°08'09"E 25.00' N89°51'51"E 85.50' N00°08'09"W 25.00' S89°51'51"W 85.50' SS1 E2 E1 C1 C2 W1 W2 W3 SS2 W4 W5 W6 W7 W8 GENERAL UTILITY NOTES 1. THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 2. THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED. 3. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 4. THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES. 5. ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 6. ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL. 7. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC. 9. CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS. 10. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 11. WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. 12. COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS. 13. ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. 14. CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR DOMESTIC AND FIRE SERVICE. CONNECT TO BUILDING DOMESTIC AND FIRE LINE. COORDINATE WITH PLUMBING DRAWINGS. 15. COORDINATE LOCATION OF ELECTRICAL AND COMMUNICATION LINES WITH LOCAL UTILITIES. 16. COORDINATE LOCATION OF REQUIRED CONDUITS FOR ELECTRIC SERVICE, LIGHT POLES, COMMUNICATION SERVICE AND IRRIGATION SYSTEM. 17. COORDINATE LOCATION AND SIZE OF GAS SERVICE CONNECTION AND INSTALLATION OF SERVICE LINE AND METER WITH GAS COMPANY. 18. COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING DRAWINGS. 19. FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO DOMESTIC/FIRE LINE INSTALLATION AND STORM SEWER / SANITARY SEWER INSTALLATION. 20. SANITARY SEWER LATERAL, WATER SERVICE, & ELECTRICAL/COMMUNICATION CONDUITS SHALL BE GRANULAR BACKFILL FOR ENTIRE RUN. 21. ALL EXISTING MANHOLE AND CATCH BASIN GRATES, WATER OR GAS VALVES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS. 22. OWNER/CONTRACTOR TO ACQUIRE ALL NECESSARY EASEMENTS FOR UTILITY SERVICES. 23. CONTRACTOR TO CONNECT DOWNSPOUTS INTO THE EXISTING STORM SEWER SYSTEM. THE DRAINAGE REPORT FOR THIS AREA SHOULD BE CONSULTED TO VERIFY CONNECTING INTO APPROPRIATE STORM SEWER SYSTEMS PER ORIGINAL DESIGN AND WATERSHEDS. UTILITY PLAN NOTES SANITARY SEWER NOTES COORDINATE CONNECTION TO EXISTING 6" SANITARY SEWER LATERAL STUB. COORDINATE CONNECTION WITH M.E.P. PROVIDE CLEANOUTS AS REQUIRED/SHOWN. VERIFY INVERTS ON EXISTING LINE AND COORDINATE CONDITIONS WITH M.E.P. ADJUST AS REQUIRED. PROPOSED SANITARY LATERAL CLEANOUT TYPE 1 WITHIN 3' OF BUILDING. WATER SERVICE NOTES: COORDINATE CONNECTION OF 1" DOMESTIC SERVICE LINE WITH PLUMBING DRAWINGS. PROPOSED WATER VALVE PROPOSED 1" DOMESTIC SERVICE LINE. COORDINATE METER LOCATION WITH WATER COMPANY. CONNECT TO EXISTING MAIN PER CARMEL WATER REQUIREMENTS. LOCATION OF EXISTING MAIN UNKNOWN AT TIME OF SURVEY. CONTRACTOR TO CONTACT WATER COMPANY FOR EXACT LOCATION OF EXISTING MAIN AND REFER ANY REVISIONS/CONFLICTS TO ENGINEER AND OWNER, IF NEEDED. FIRE DEPARTMENT CONNECTION (FDC) POST INDICATOR VALVE (PIV) PROPOSED 4" WATER LINE PROPOSED 4" FIRE LINE INTO THE BUILDING ELECTRIC NOTES: COORDINATE AND CONNECT BUILDING ELECTRICAL LINE FROM SERVICE DROP LOCATION TO TRANSFORMER. COORDINATE CONNECTION WITH POWER COMPANY AND ELECTRICAL DRAWINGS. ADJUST AS REQUIRED. CONTRACTOR TO COORDINATE CONNECTION TO EXISTING TRANSFORMER. COORDINATE WITH UTILITY PROVIDER AND OWNER IF A NEW TRANSFORMER IS REQUIRED. COMMUNICATION NOTES: COORDINATE AND CONNECT BUILDING COMMUNICATION SERVICE LINE(S) TO CONNECTION POINT AS SHOWN. ADJUST AS REQUIRED. COORDINATE CONNECTION WITH SITE DRAWINGS AND SERVICE PROVIDER. W4 W2 W3 SS2 W1 E1 C1 SS1 C300DEVELOPMENT PLANELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BOUNDARY LINE FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE WATER MANHOLE WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT SANITARY SEWER MANHOLE SANITARY STUB MARKER ROW RIGHT OF WAY ESMT EASEMENT D.&U.E. DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION TOC TOP OF CASTING CMP CORRUGATED METAL PIPE RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE VCP VITRIFIED CLAY PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE DIP DUCTILE IRON PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES FLOW LINE SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN G G G W W E(A)E(A) E E E C C C C(A)C(A) OHU OHU FM FM AERIAL FIBER OPTIC CABLEFO(A)FO(A) UNDERGROUND FIBER OPTICFOFO SANITARY SEWER LATERALSAN SAN ROOF DRAINSTM STM SUB SURFACE DRAIN C2 GENERAL GRADING NOTES 1. CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION PREVENTION PLAN AND DETAILS FOR CONSTRUCTION SCHEDULING AND EROSION CONTROL MEASURES TO BE INSTALLED PRIOR TO EARTHMOVING ACTIVITIES. 2. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE. 3. TOPSOIL SHALL BE STRIPPED FROM ALL AREAS TO RECEIVE PAVING AND FROM WITHIN THE LIMITS OF PROPOSED BUILDINGS AND STRUCTURES. TOPSOIL SHALL BE STRIPPED TO THE DEPTH AS NOTED IN THE GEOTECHNICAL REPORT. 4. AFTER STRIPPING TOPSOIL, PROOFROLL AREAS TO BE FILLED WITH A MEDIUM WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. RECOMMENDATIONS FOR DRYING, AMENDING AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED PAVED AND/OR BUILDING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION BY THE OWNER'S GEOTECHNICAL TESTING REPRESENTATIVE. 5. TOPSOIL SHALL BE PLACED IN MOUNDING AREAS, NONSTRUCTURAL FILL AND/OR PLANTING AREAS TO A MINIMUM DEPTH OF 6". EXCESS TOPSOIL SHALL BE REMOVED FROM THE SITE. 6. WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO GEOTECHNICAL REPORT AND/OR CONSULT WITH OWNER'S GEOTECHNICAL TESTING REPRESENTATIVE FOR RECOMMENDATIONS. 7. FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER MOISTURE CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FUTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-1557. FIELD COMPACTING TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND THE REQUIRED COMPACTION ON EACH LIFT SHALL BE IN ACCORDANCE WITH INDOT SECTION 211. 8. MAXIMUM LAWN SLOPE IS 3:1. 9. THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED. 10. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 11. ALL SPOT ELEVATIONS ARE TO FINISHED GRADE. 12. COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS. 13. ALL GRADES AT BOUNDARY SHALL MEET EXISTING. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. BUTT JOINTS SHALL BE PROVIDED AT TRANSITIONAL AREAS BETWEEN PROPOSED AND EXISTING PAVEMENT. 14. ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL. 15. ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 16. THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO THE START OF CONSTRUCTION. IF AN EXCESS OR SHORTAGE OF EARTH IS ENCOUNTERED, THE CONTRACTOR SHALL CONFIRM WITH THE OWNER AND ENGINEER THE REQUIREMENTS FOR STOCKPILING, REMOVAL OR IMPORTING OF EARTH. 17. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS AFTER INSTALLATION. CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING CONDITIONS. ANY AREAS THAT HOLD WATER MORE THAN 1/8" DEEP SHALL BE CUT OUT AND CORRECTED TO POSITIVE DRAINAGE AT NO COST TO THE OWNER/ DEVELOPER OR ENGINEER. 18. ADA ACCESSIBLE PARKING SPACES, RAMPS, AND ROUTES SHALL BE IN ACCORDANCE WITH THE LATEST ADA STANDARDS FOR ACCESSIBLE DESIGN. 19. CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWER FACILITIES, WATER MAIN, AND STORM SEWERS IS 18" OR LESS. 20. ALL DISTURBED AREA SHALL BE STABILIZED IN ACCORDANCE TO THE STORM WATER POLLUTION PREVENTION PLAN AND LANDSCAPE PLAN. 21. THIS SITE DOES NOT LIE IN A SPECIAL FLOOD ZONE HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP #18057C0205 G, DATED 11/19/2014. CARMEL REQUIREMENTS 1. NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 2. DECORATIVE SIGNS, SPRINKLER SYSTEMS, TREES, LANDSCAPING MOUNDS, FENCES, LIGHT POLES OR OTHER SUCH AMENITIES ARE NOT PERMITTED WITHIN THE RIGHT-0F-WAY. 3. M.F.P.G. = MINIMUM FLOOD PROTECTION GRADE M.F.P.G. OF ALL STRUCTURES FRONTING A POND OR OPEN DITCH SHALL BE NO LESS THAN 2 FEET ABOVE ANY ADJACENT 100-YEAR LOCAL OR REGIONAL FLOOD ELEVATIONS, WHICHEVER IS GREATER, FOR ALL WINDOWS, DOORS, PIPE ENTRANCES, WINDOW WELLS, AND ANY OTHER STRUCTURE MEMBER WHERE FLOOD WATERS CAN ENTER A BUILDING. 4. M.L.A.G. = LOWEST ADJACENT GRADE IS THE ELEVATION OF THE LOWEST GRADE ADJACENT TO A STRUCTURE WHEN THE SOIL MEETS THE FOUNDATION AROUND THE OUTSIDE OF THE STRUCTURE. (INCLUDING STRUCTURAL MEMBERS SUCH AS BASEMENT WALKOUT, PATIOS, DECKS, PORCHES, SUPPORT POST, OR PIERS, AND RIM OF THE WINDOW WELL. BENCHMARK INFORMATION ORIGINATING BENCHMARK DEPARTMENT OF NATURAL RESOURCES STANDARD DISK STAMPED "LEE 2 AZ" SET IN CONCRETE LOCATED AT THE SOUTHEAST CORNER OF THE INTERSECTION OF SHELBORNE ROAD AND 131ST STREET, 26.1 FEET EAST OF THE CENTERLINE OF SHELBORNE ROAD AND 20.3 FEET SOUTH OF THE CENTERLINE OF 131ST STREET. ELEVATION: 917.52 NAVD 1988 REVISIONS AND ISSUESW16.0607PREPARED FOR:PROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W16.0607DATEBY10.08.2021MLTDATE:RLWKnow what'sbelow. before you dig.Call R D.B. KLAIN CONSTRUCTION, LLCVILLAGE OF WEST CLAY LOT 8SUBMITTED FOR REVIEW10.04.2021 RLW W S N E E N G I N E E RS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netB u ild w ith c o n f id e n c e .S MPART OF BLOCK "F", VILLAGE OF WEST CLAY, CLAY TOWNSHIP, HAMILTON COUNTY, INDIANAMEETINGHOUSE ROAD, CARMEL, INDIANA 46032RUSSELL L. WEBSTER II, PE No. 11900318 10/8/2021RUSSELLL.WEBST E R IIPROFESSIONA L E NGINEERREGISTER E DINDIA N A No. PE11900318 STATE OFFINAL CONSTRUCTION PLANS10.08.2021 RLW W5 W6 W7 W8 01/11/22