Loading...
HomeMy WebLinkAboutG001_LIFE SAFETY PLAN-Layout1G001 CODE AND LIFE SAFETY PLAN ALL IDEAS, DESIGNS AND PLANS INDICATED OR REPRESENTED BY THESE DRAWINGS ARE OWNED BY, AND THE PROPERTY OF STUART R SHADE, RA. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS ON THE JOB SITE. ALL RIGHTS RESERVED, EXCEPT FOR USES EXPRESSLY PERMITTED IN WRITING. SHEET NUMBER: CERTIFICATION:PROJECT :PROPOSED PROFESSIONAL BUILDINGBUILDING 812750 MEETING HOUSE RDREV 1: CARMEL, INDIANA 46032LOT 8 PERMIT SET 12_20_21SRS ARCHITECTS 200 S RANGELINE RD , #226 INC CARMEL, INDIANA 46032 PHONE: 317-989-6248 E-MAIL : sshade@mitschdesign.com TANNIARATUSAERIGTSRTR.HSSTATE OFEED DE R EAIDITCHCAR0003418416 APRIL ' 21VILAGE CENTER SHOPPESSCALE: 2 3/16" = 1' - 0" LIFE SAFETY PLAN SCALE: 1 3/16" = 1' - 0" LIFE SAFETY PLAN CODE ANALYSIS PROPOSED AREA OF NEW CONSTRUCTION TOTAL LEVEL 1 - 1574 SQ FT CONSTRUCTION TYPE VB ALLOWABLE AREA FIRE PROTECTION - FULL MOP SINK WATER COOLER - BOTTLED WATER PROVIDED OCCUPANCY CLASSIFICATION LEVEL 1 - B - BUSINESS OCCUPANCY LEVEL 1 OFFICE - 12 PER TABLE 1004.1.2 EXITS REQUIRED LEVEL ONE 1 PER TABLE 1021.2 LESS THAN 49 PER PROPOSED SUITES EXITS REQUIRED LEVEL TWO 1 PER APARTMENT TABLE 1021.2 LESS THAN 29 DEAD END CORRIDORS NONE - BUILDINGS REQUIRING ONLY ONE EXIT EGRESS DOOR HARDWARE REQUIREMENTS EGRESS DOOR SWING NO REQUIREMENT PER 1008.1.10 NO REQUIREMENT PER 1008.1.2 MAX TRAVEL DISTANCE MEASURED 40' - ALLOWABLE 75' - B OCCUPANCY STAIRS NON-ENCLOSED PER 1009.3 EX 1 LEVEL 2 - R2 - APARTMENT LEVEL 1 - U - PRIVATE GARAGE B - 9000 SQ FT - 2 STORIES R2 - 7000 SQ FT - 2 STORIES U - 5500 SQ FT - 1 STORY LEVEL 1 GARAGE - 3 PER TABLE 1004.1.2 LEVEL 2 RESIDENTIAL - 8 PER TABLE 1004.1.2 (1) HR AREA SEPARATION AT LEVEL ONE CEILING EXIT LEVEL 1 - B (OFFICE) U (GARAGE) FULLY SPRINKLED LEVEL 2 - R2 - SPRINKLED REQUIRED SEPARATION (1) HR REQUIRED BETWEEN B AND U - U305 (1) HR REQUIRED BETWEEN R AND B, U TABLE 508.4 US GYP - RC-2601 / GA-FC 5406 PROPOSED (2) HR AREA SEPARATION PROPOSED (1) HR AREA SEPARATION EXIT B OCCUPANCY BUSINESS EXIT RESTROOMS PER INDIANA CODE 1 PROVIDED PER EACH COMMERCIAL SPACE DRINKING FOUNTAIN BUSINESS OFFICE - 1200 SQ FT GARAGE - 374 SQ FT TOTAL LEVEL 2 - 1396 SQ FT APPLICABLE CODES CODE DESCRIPTION COMPRISED OF GENERAL ADMINISTRATION RULES GENERAL ADMINISTRATION RULES (GAR) (UPDATED 8.1.2014) (AMENDED 12.1.2014) 675 IAC 12 BUILDING CODE (INDIANA AMENDMENTS) 2014 INDIANA BUILDING CODE (675 IAC 13-2.6) EFFECTIVE DECEMBER 1, 2014 2012 INTERNATIONAL BUILDING CODE 675 IAC 13-2.6 2014 INDIANA FIRE CODE (IFC) EFFECTIVE DECEMBER 1, 2014 2012 INDIANA PLUMBING CODE (IPC) EFFECTIVE DECEMBER 24, 2012 2009 INDIANA ELECTRICAL CODE (IEC) EFFECTIVE AUGUST 26, 2009 2014 INDIANA MECHANICAL CODE (675 IAC 18-1.6) EFFECTIVE DECEMBER 1, 2014 2014 INDIANA BUILDING CODE CHAPTER 11 - ACCESSIBILITY 2010 INDIANA ENERGY CONSERVATION CODE (IECC) EFFECTIVE MAY 6, 2010 INDIANA BUILDING REHABILITATION STANDARD (GAR) (UPDATED 12.22.06) (REPEALED 3.18.08 READOPTED 7.3.18 2012 INTERNATIONAL FIRE CODE 675 IAC 22-2.5 2006 INTERNATIONAL PLUMBING CODE 675 IAC 16-1.4 2008 NFPA 70 675 IAC 17-1.8 2012 INTERNATIONAL MECHANICAL CODE 675 IAC 18-1.6 675 IAC 13-2.6-12 CHAPTER 11 ASHRAE STANDARD 90.1, 2010 675 IAC 19-4 675 IAC 12-8 FIRE CODE (INDIANA AMENDMENTS) PLUMBING CODE (INDIANA AMENDMENTS) ELECTRICAL CODE (INDIANA AMENDMENTS) MECHANICAL CODE (INDIANA AMENDMENTS) HANDICAPPED ACCESSIBILITY CODE (INDIANA AMENDMENTS) ENERGY CODE (INDIANA AMENDMENTS) BUILDING REHABILITATION STANDARD (INDIANA AMENDMENTS) ELEVATOR SAFETY CODE 2011 INDIANA ELEVATOR SAFETY CODE (IESC) (UPDATED 9-28-11) 675 IAC 21 - ANSI / ASMEA17.1, 2007 ANSI / ASME A90.1, 2003 ANSI / A10.4, 2004 ASME / A18.1, 2005 2014 INDIANA FUEL GAS CODE IFGC - EFFECTIVE 12.1.14 A117.1 ACCESSABLE AND USABLE BUILDINGS AND FACILITIES, 2009 EDITION FUEL GAS CODE (INDIANA AMENDMENTS) 2012 INTERNATIONAL FUEL GAS CODE 675 IAC 25.3 BUILDING TOTAL AREA - 2970 SQ FT BUILDING DEMISING WALLS SHALL BE (2) HR WALLS R2 OCCUPANCY APARTMENT R2 OCCUPANCY APARTMENT U OCCUPANCY GARAGE (1) HR AREA SEPARATION AT LEVEL ONE CEILING PROPOSED DECK (2) HR SEPARATION WALL (2) HR SEPARATION WALL (2) HR SEPARATION WALL (2) HR SEPARATION WALL (1) HR SEPARATION WALL 01/11/22