Loading...
HomeMy WebLinkAboutP101-D - LEVEL 01 OVERHEAD SANITARY - AREA DUP UPB1 B3 B3 A1 A1 A1 A1 A1 A1 B1 B1 A6 A1 A1 A1 A1 A1A1A1 A1 UP UPA6 A2 A2A7 A7 UNIT B3 SEE DETAIL ON P202 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A7 SEE DETAIL ON P201 UNIT A6 SEE DETAIL ON P200 UNIT A2 SEE DETAIL ON P200 UNIT A2 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT B1 SEE DETAIL ON P202 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A1 SEE DETAIL ON P200 UNIT A6 SEE DETAIL ON P200 3 3 4 2 1 1 1 1 1 1 1 1 11 11 1 1 1 1 2 2 2 2 2 2 22 2 2 2 2 2 3 3 3 3 3 3 33 3 3 3 3 3 4 4 4 4 4 4 44 4 4 4 4 4 1 2 3 4 FD-2 FD-2 4"ø 4"ø 4"ø 8"ø 4"ø 4"ø MOORE ENGINEERING SERVICES, INC. 6340 LaPas Trail Indianapolis, IN 46268 Phone (317) 291-1052 FAX (317) 298-2729R I G EEIS PE60860351 No.REENIGNELANOISSEFORPDOUGLAS.RMOO RET R NNDIA A STATE OF DE NOTE OVER-HEAD PLUMBING SHOWN IN THIS VIEW SANITARY STACK NOTES 4 OSD STACK 2 WASHER STACK 3 KITCHEN ISLAND STACK 1 BATHROOM GROUP STACK ARCHITECT CLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20010THE SIGNATURECARMELCARMEL, INENGINEERE D C B A 5 KITCHEN WALL STACK P101-DLEVEL 01 OVERHEADSANITARY - AREA D PERMIT SET 04.23.2021 1/8" = 1'-0"1 Level 01 Overhead Sanitary - Area D 10/12/21