Loading...
HomeMy WebLinkAboutP105-D - LEVEL 05 - SANITARY - AREA DB3 B3 DNA6A6 A6 A6 A6A6 B1aB1aB1a B1a A2 A2A5 A5 B8B8 B11B11UNIT B3 SEE DETAIL ON P202 UNIT A6 SEE DETAIL ON P200 UNIT A6 SEE DETAIL ON P200 UNIT B1A SEE DETAIL ON P202 UNIT B11 SEE DETAIL ON P204 UNIT A2 SEE DETAIL ON P200 UNIT A2 SEE DETAIL ON P200 UNIT A5 SEE DETAIL ON P200 UNIT B1A SEE DETAIL ON P202 UNIT A6 SEE DETAIL ON P200 UNIT A6 SEE DETAIL ON P200 UNIT A6 SEE DETAIL ON P200 UNIT A6 SEE DETAIL ON P200 UNIT B8 SEE DETAIL ON P203 UNIT B8 SEE DETAIL ON P203 4"ø 4"ø 4"ø 4"ø 4"ø4"ø 3 4 2 1 1 1 1 1 1 1 1 11 11 1 1 1 1 2 2 2 2 2 2 22 2 2 2 2 3 3 3 3 3 33 3 3 3 3 4 4 4 4 4 444 4 4 4 4 1 1 1 2 3 3 4 4 1 MOORE ENGINEERING SERVICES, INC. 6340 LaPas Trail Indianapolis, IN 46268 Phone (317) 291-1052 FAX (317) 298-2729R I G EEIS PE60860351 No.REENIGNELANOISSEFORPDOUGLAS.RMOO RET R NNDIA A STATE OF DE NOTE OVER-HEAD PLUMBING SHOWN IN THIS VIEW SANITARY STACK NOTES 4 OSD STACK 2 WASHER STACK 3 KITCHEN ISLAND STACK 1 BATHROOM GROUP STACK ARCHITECT CLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20010THE SIGNATURECARMELCARMEL, INENGINEERE D C B A 5 KITCHEN WALL STACK P105-DLEVEL 05 - SANITARY -AREA DPERMIT SET 04.23.2021 1/8" = 1'-0"1 Level 05 - Sanitary - Area D 10/12/21