Loading...
HomeMy WebLinkAboutS102DUPB1 L1L1L2L2 L1 A1A1 A1 B1 A1 A1 A1A5A5A1L6L6 L1L1L1AREA C AREA D AREA C AREA D AREA D AREA E P15 P17 P19 P20 P23 P25 P28 P31 P21 P26 P30 P29 P27 P24 P22 P18 P16 PA PCPB PD PJ PM PN PR PT PW PX PZPY PV PUPQ PS PL PK PF PE PPPH PG C/S C/S C/S C/S C/S C/S4 3 5 52 1 3 4 3 5 5 5 2 1 2 3 4 3 5 5 5 2 1 2 1 1 1 1 1 2 3 5 5 2 1 1 5 2 1 1 5 2 1 5 2 1 5 2 1 3 2 1 1 1 4 3 4 3 4 C/S C/SC/S30LB36+16'-11"30LB36+16'-11"30LB36+16'-11"30LB36+16'-11"24RB36 +16'-11" 24RB36 +16'-11" 30LB36 +16'-11"30LB36+16'-11"24RB24+16'-11"32LB36 +16'-11" 30LB36+16'-11"24RB36 +16'-11" 24RB36 +16'-11"30LB36+16'-11"32LB36+16'-11"32LB36+16'-11"32LB36+16'-11"40IT36+16'-11"40IT36+16'-11"40IT36+16'-11"24RB36 +16'-11" 24RB36 +16'-11" 24RB24 +15'-11" 24RB24 +15'-11" 24RB24 +15'-11" 24RB24 +15'-11" 24RB24 +15'-11" 24RB24 +15'-11"24RB24+16'-11"24RB24+15'-11"24RB24 +15'-11" 24RB24+15'-11"24RB24 +15'-11" 24RB24 +15'-11" 24RB24 +15'-11" 24RB24 +15'-11" 24RB24 24RB36 +16'-11"24RB36+16'-11"24RB36+16'-11"24RB36+16'-11"24RB36+16'-11"24RB36+16'-11"30LB36+16'-11"PCC24x24PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 PCC24x24 #5 @ 12" o.c. EW FF=+17'-4"DT28 w/ 5" C.I.P. TOPPING w/#5 @ 12" o.c. EW FF=+17'-4"DT28 w/ 5" C.I.P. TOPPING w/#5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c.EW FF=+17'-4"HC12 w/ 5" C.I.P. TOPPING w/24RB36 +16'-11" 24RB36 +16'-11" 24RB36 +16'-11" 24RB36 +16'-11" 24RB36 +16'-11" 24RB36 +16'-11" #5 @ 12" o.c. EW FF=+17'-4" DT28 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/#5 @ 12" o.c. EW FF=+17'-4" HC12 w/ 5" C.I.P. TOPPING w/ #5 @ 12" o.c. EW FF=+17'-4"HC12 w/ 5" C.I.P. TOPPING w/#5 @ 12" o.c. EW FF=+17'-4"HC12 w/ 5" C.I.P. TOPPING w/CONT. HAUNCH ON PC WALLS FORPLANK BRG. T/HAUNCH = +15'-11"CONT. HAUNCH ON PC WALLS FORPLANK BRG. T/HAUNCH = +15'-11"CONT. HAUNCH ON PC WALLS FORPLANK BRG. T/HAUNCH = +14'-7"CONT. HAUNCH ON PC WALLS FORPLANK BRG. T/HAUNCH = +14'-7"CONT. HAUNCH ON PC WALLS FOR PLANK BRG. T/HAUNCH = +15'-11" CONT. HAUNCH ON PC WALLS FOR PLANK BRG. T/HAUNCH = +15'-11"CONT. HAUNCH ON PC WALLS FORPLANK BRG. T/HAUNCH = +15'-11"MECH. SHAFTPC STAIR LANDING +12'-0"ELEVATORSHAFT28" PC DOUBLE TEES28" PC DOUBLE TEES3" COMPOSITE TOPPING w/6x6 W4.0xW4.0 WWF 3" COMPOSITE TOPPING w/6x6 W4.0xW4.0 WWF WARP TOPPING/ WASH AT STAIR LANDING & DOOR TO MAINTAIN CROSS SLOPES & POSITVE DRAINAGE PCC24x24 PCC24x24WASH LINE WASH LINE WASH LINE WASH LINEWASH LINEWASH LINE WASH LINEWASH LINE WASH LINEWASH LINE WASH LINE9" PC BRG. WALL 9" PC BRG. WALL 9" PC BRG. WALL9" PC BRG. WALL 9" PC BRG. WALL 9" PC BRG. WALL12" PC BRG. WALL 12" PC BRG. WALLWASH LINEWASH LINETRAN'S RAMPRAMP UP XXXSW -1 SW -1SW -4SW -42 S551 AREA DAREA EDIAPHRAM CHORD REINFORCING PER PC SUPPLIER DIAPHRAM CHORD REINFORCING PER PC SUPPLIER DIAPHRAM CHORD REINFORCING PER PC SUPPLIER DIAPHRAM CHORD REINFORCING PER PC SUPPLIER 1/2" STEP IN TOPING SLAB SLOPE 1/4" PER FOOT TO OUTER EDGE. 1/2" STEP IN TOPING SLAB SLOPE 1/4" PER FOOT TO OUTER EDGE. 2 (2)2X12 PPT, SUPPORT ON (2) 2X6 COLUMN @ WALL EXTENDING DOWN TO FLOOR OR HEADER BELOW w/ SIMPSON HUC212-2 HANGERS. 3 WOOD FRAMING PLAN KEYNOTES (3)2X12 PPT, CONNECT TO SUPPORTING BEAM(s), 6X6 COLUMN, OR (3) 2X6 COLUMN @ WALL EXTENDING DOWN TO FLOOR OR HEADER BELOW w/ SIMPSON HUC212-3 HANGERS. 4 2X8 PPT @ 16" O.C. MAX. w/ TREX DECKING PER ARCH. DWGS./SPECS. CONNECT 2X8's w/ SIMPSON LUS28 HANGERS AT EACH END. 1 2X10 LEDGER SCREWED TO FACE OF EXTERIOR WALL STUDS w/ (3) 0.220 X 4 SIMPSON SDWS SCREWS INTO EACH STUD @ 16" O.C. MAX. 5 6X6 PPT COLUMN w/ ABU66 BASE AT PODIUM LEVEL WELDED TO THE EMBED OR ABU66 BASE AT FOOTING. USE BC6 CAP/BASE BETWEEN LEVELS. 6 (4)2X10 PPT X 16'-0" LONG, T/BEAM MIN. 1.5" BELOW T/FLOOR TRUSSES (FOR BALCONY BEAMS PERP. TO FLOOR TRUSSES). REFER TO ARCH. DRWGS. FOR BEAM ELEVATIONS AND DECKING. CONNECT TO FOURTH FLOOR TRUSS AT BACKSPAN AND SUPPORT ON (4) 2X6 COLUMN AT WALL. (NOTE: LAYOUT TRUSS WEBS AND VERTICALS TO ACCOMMODATE BACKSPAN.) 7 PROVIDE CONT. CMSTC16 STRAP ON TOP OF THE OSB FLOOR SHEATHING. AND LOCATED ABOVE THE BALCONY EXTERIOR WALL. STRAP MAY BE SPLICED EQUAL DISTANCE BETWEEN BALCONIES. WHERE FLOOR FRAMING IS PARALLEL, A FLOOR TRUSS IS TO BE LOCATED INLINE WITH BALCONY EXTERIOR WALL BELOW THE STRAP. WHERE FLOOR FRAMING IS PERPENDICULAR, 2X6 BLOCKING IS TO BE LOCATED INLINE WITH BALCONY EXTERIOR WALL BELOW THE STRAP AND FIT TIGHTLY BETWEEN FLOOR TRUSS TOP CHORDS. PRECAST FRAMING LEGEND 1. PLAN LEGEND: FF DENOTES FINISH FLOOR PC DENOTES PRECAST CONCRETE CIP DENOTES CAST - IN - PLACE AE DENOTES AIR - ENTRAINED T/PC DENOTES TOP OF PRECAST ELEMENT NOM. PCC24x24 DENOTES PRECAST COLUMN SIZE DENOTES NOMINAL THICKNESS OF TOPPING- ACTUAL THINCKNESS IS DEPENDEDNT ON THE AMOUNT OF CAMBER IN PRECAST MEMBER T/PC+12'-0" DENOTES T/PRECAST (NOT TOPPING SLAB), OR SLAB ON GRADE ELEVATION DEFINING SLOPE TO FLOOR DRAINS 2. PRECAST MEMBER IDENTIFICATION: 'PCC' DENOTES PRECAST COLUMN 'IT' DENOTES PRECAST INVERTED TEE BEAM 'LB' DENOTES PRECAST 'L-SHAPED' BEAM 'RB' DENOTES PRECAST RECTANGULAR BEAM 'DT' DENOTES PRECAST DOUBLE TEE 'HC' DENOTES HOLLOW CORE PLANK PRECAST FRAMING NOTES 1. REFFERENCE THE S000 - SERIES STRUCTURAL NOTES FOR THE BUILDING DESIGN LOADS AND CRITERIA, GENERAL STRUCTURAL NOTES, COORDINATION WITH OTHER TRADES, ETC. 2. REFERENCE THE LOADING PLANS FOR UNIFORM, CONCENTRATED LINE AND POINT LOADS TO BE USED IN THE DESIGN OF THE PRECAST CONCRETE FRAMING SYSTEM. 3. REFERENCE THE S400 - SERIES FOR TYPICAL FOUNDATION, FRAMING, AND MASONRY DETAILS. 4. REFERENCE THE S500 - SERIES SECTION DRAWINGS FOR FOUNDATION & STRUCTURAL SECTIONS. 5. THE DESIGN OF PRECAST COLUMNS, BEAMS, DOUBLE TEES, WALLS, EMBED, INSERTS, CONNECTIONS, DIAPHRAGM REINFORCING, ETC. TO BE BY THE PRECAST SUPPLIER'S QUALIFIED ENGINEER/SPECIALTY STRUCTURAL ENGINEER. THE PRECAST STRUCUTRE SHALL BE DESIGNED TO SUPPORT THE CONSTRUCTION SHOWN ON THE STRUCTURAL DRAWINGS AND TO SUPPORT THE LOADS INDICATED ON THE LOADING PLANS. 6. THE LAYOUT AND ARRANGEMENT OF ALL PRECAST FRAMING IS SCHEMATIC IN NATURE AND INTENDED TO CONVEY THE ANTICIPATED SCOPE OF PRECAST STRUCTURE. THE FINAL LAYOUT AND ARRANGEMENT, SPACING, SIZE AND DPTH OF ALL MEMBERS SHALL BE DETERMINED BY THE PRECAST SUPPLIER IN CONSULTATION WITH THEIR QUALIFIED PROFESSIONAL ENGINEER (SPECIALTY STRUCTURAL ENGINEER). THE FRAMING INFORMATION SHOWN IS NOT MEANT TO BE RESTRICTIVE, NOT TO PREVENT THE PRECAST SUPPLIER FROM SUGGESTING POTENTIAL COST SAVINGS OR VALUE ENGINEERING ALTERNATIVES. MAXIMUM DEPTHS LISTED ON THE PLANS SHALL NOT BE EXCEEDED, UNLESS DETERMINED INSUFFICIENT TO SUPPORT THE SPECIFIED LOADS AND/OR MEET THE SPECIFIED DEFLECTION LIMITATIONS. MINIMUM CLEARANCES IN PARKING GARAGE DRIVE AISLES AND PARKING MUST BE MAINTAINED. 7. ALL ELEVATIONS ARE REFERENCED FROM THE FIRST FLOOR FINISH FLOOR ELEVATION, +0'-0" (USGS 852.0). FINISH FLOOR ELEVATIONS STATED ON THE DRAWINGS ARE TO TOP OF THE TOPPING SLAB ON PRE PRECAST PODIUM SECTIONS. 8. DIAPHRAGM NOTES: A) PROVIDE DIAPHRAGM REINGORCING IN SIZE, NUMBER AND LOCATION SHOWN ON THE PRECAST ERECTION PLAN. B) FABRICATE DIAPHRAGM REINFORCING IN LONGEST LENGTHS PRACTICAL. C) LAP SPLICES IN DIAPHRAGM REINFORCING A MINIMUM OF 48 BAR DIAMETERS. D) FURNISH 90 DEGREE HOOKS AT ALL INSIDE CORNERS. E) EXTEND REINFORCING A MINIMUM OF 6'-0" PAST INTERSECTING PERPENDICULAR REINFORCING AT ALL OUTSIDE CORNERS. F) G) AT TOPPING SLAB REINFORED WITH REBAR, EXTEND PERPENDICULAR REINFORCING OVER DIAPHRAGM REINFORCING. SUPPORT DIAPHRAGM REINFORCING ON CHAIRS/BOLSTERS. MAINTAIN DIAPHRAGM REINGORCING AS CLOSE TO CENTERED IN THE TOPPING SLAB AS POSSIBLE WHILE MAINTAINING SPECIFIED MINIMUM COVERAGES. ADJUST HEIGHT OF CHAIRS/BOLSTERS AS REQUIRED TO ACCOUNT FOR CAMBER IN PRECAST MEMBERS. K) AT FIRST FLOOR LEVEL, EXTEND W.W.F. OVER TOP OF DIAPHRAGM REINFORCING. I) AT STEPS IN TOPPING SLABS, FABRCATE DIAPHRAGM REINFORCING WITH SLOPES/BENDS, OR PROVIDE ADDITIONAL DIAPHRAGM CONTINUITY REINFORCING AT STEPS IN TOPPING SLABS. J) PROVIDE #4 x 5'-0" LONG DIAGONAL BARS AT CORNERS OF OPENINGS IN TOPPING SLABS AND AT ALL COLUMNS THAT PENETRATE THE TOPPING.ARCHITECTCLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS ENGINEERTHE SIGNATURECARMELCARMEL, INSECOND FLOORFRAMING PLAN -AREA D20010 4/23/2021 PERMIT SET S102D 1/8" = 1'-0" 1 SECOND FLOOR FRAMING PLAN - AREA D NORTH10/12/21