Loading...
HomeMy WebLinkAboutS104CUP DN SA1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1A1A1 A1 A1 A1 A1 A1 A1 A1B4B3 B3A2A2 A1 A1 B1 B1 S3 S3 A12A12A12A12A12A12AREA CAREA BAREA CAREA BAREA C AREA D AREA C AREA D 18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS@ 24" O.C.18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C. 18" FLOOR TRUSS @ 24" O.C.C/S C/SSW -XC/S C/SSW -1C/S C/SSW -1C/S C/S C/S SW -5 P3 P7 PVPP PG 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C. 2x10 @ 16 O.C.2x10 @16 O.C.2x10 @16 O.C.2x10 @16 O.C.2x10 @16 O.C.2x10 @16 O.C.2x10 @16 O.C.2x10 @16 O.C.2x10 @16 O.C.3 4 3 5 5 5 2 1 2 3 4 5 5 1 2 4 3 5 2 1 4 3 5 2 1 4 3 5 2 5 2 1 3 4 35 55 2 2 1 3 4 35 55 22 1 11 1 1 1 1 111 1 1 3 1 1 1 4 3 5 5 2 1 2 1 3 2 1 3 5 1 1 4 1 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 1 36 6 3" COMPOSITE TOPPING w/6x6 W4.0xW4.0 WWF 3" COMPOSITE TOPPING w/6x6 W4.0xW4.0 WWF WARP TOPPING/ WASH AT STAIR LANDING & DOOR TO MAINTAIN CROSS SLOPES & POSITVE DRAINAGE PCC24x24 PCC24x24 PCC24x24 WASH LINE WASH LINE WASH LINEWASH LINEWASH LINEWASH LINE WASH LINEWASH LINEWASH LINE9" PC BRG. WALL9" PC BRG. WALL 9" PC BRG. WALL 9" PC BRG. WALL9" PC BRG. WALL9" PC BRG. WALL 9" PC BRG. WALL 9" PC BRG. WALL12" PC BRG. WALL 12" PC BRG. WALL 12" PC BRG. WALLRAMP DOWN XXXPCC24x24 2 S551 15 S551 15 S551 5 S552 5 S552 4 S551 1 S551 2 S551 2 S551 2 S551 4 S551 4 S551 4 S551 4 S551 4 S551 4 S551 1 S551 2 S551 2 S551 2 S551 2 S551 2 S551 2 S551 6 S551 4 S551 5 S552 4 S551 4 S551 4 S551 4 S551 4 S551 4 S551 4 S551 2 S551 6 S551 8 S551 8 S551 8 S551 8 S551 8 S551 4 S551 15 S551 15 S551 15 S551 15 S551 14 S551 15 S551 15 S551 15 S551 15 S551 15 S551 15 S551 15 S551 15 S551 15 S551 15 S551 15 S551 15 S551 2 S551 8 S551 8 S551 GIRDER FLOOR FRAMING AROUND CHASE. 4 S553 4 S553 3 S553 4 S553 4 S553 4 S553 4 S553 4 S553 4 S553 4 S553 4 S553 4 S553 4 S553 3 S553 28" PC DOUBLE TEES28" PC DOUBLE TEESTRAN'S RAMP28" PC DOUBLE TEESTRAN'S RAMP28" PC DOUBLE TEESELEVATOR SHAFT MECH. SHAFTPC STAIR LANDING 2 (2)2X12 PPT, SUPPORT ON (2) 2X6 COLUMN @ WALL EXTENDING DOWN TO FLOOR OR HEADER BELOW w/ SIMPSON HUC212-2 HANGERS. 3 WOOD FRAMING PLAN KEYNOTES (3)2X12 PPT, CONNECT TO SUPPORTING BEAM(s), 6X6 COLUMN, OR (3) 2X6 COLUMN @ WALL EXTENDING DOWN TO FLOOR OR HEADER BELOW w/ SIMPSON HUC212-3 HANGERS. 4 2X8 PPT @ 16" O.C. MAX. w/ TREX DECKING PER ARCH. DWGS./SPECS. CONNECT 2X8's w/ SIMPSON LUS28 HANGERS AT EACH END. 1 2X10 LEDGER SCREWED TO FACE OF EXTERIOR WALL STUDS w/ (3) 0.220 X 4 SIMPSON SDWS SCREWS INTO EACH STUD @ 16" O.C. MAX. 5 6X6 PPT COLUMN w/ ABU66 BASE AT PODIUM LEVEL WELDED TO THE EMBED OR ABU66 BASE AT FOOTING. USE BC6 CAP/BASE BETWEEN LEVELS. 6 (4)2X10 PPT X 16'-0" LONG, T/BEAM MIN. 1.5" BELOW T/FLOOR TRUSSES (FOR BALCONY BEAMS PERP. TO FLOOR TRUSSES). REFER TO ARCH. DRWGS. FOR BEAM ELEVATIONS AND DECKING. CONNECT TO FOURTH FLOOR TRUSS AT BACKSPAN AND SUPPORT ON (4) 2X6 COLUMN AT WALL. (NOTE: LAYOUT TRUSS WEBS AND VERTICALS TO ACCOMMODATE BACKSPAN.) 7 PROVIDE CONT. CMSTC16 STRAP ON TOP OF THE OSB FLOOR SHEATHING. AND LOCATED ABOVE THE BALCONY EXTERIOR WALL. STRAP MAY BE SPLICED EQUAL DISTANCE BETWEEN BALCONIES. WHERE FLOOR FRAMING IS PARALLEL, A FLOOR TRUSS IS TO BE LOCATED INLINE WITH BALCONY EXTERIOR WALL BELOW THE STRAP. WHERE FLOOR FRAMING IS PERPENDICULAR, 2X6 BLOCKING IS TO BE LOCATED INLINE WITH BALCONY EXTERIOR WALL BELOW THE STRAP AND FIT TIGHTLY BETWEEN FLOOR TRUSS TOP CHORDS. SW-X DENOTES OSB SHEATHED SHEAR WALLS. REFERENCE "SHEAR WALL SCHEDULE" ON SHEET S003. DENOTES LOCATION OF SHEAR WALL CHORD STUDS AT THE END OF THE SHEAR WALL & THE LOCATION OF THE HOLDOWN OR STRAP HARDWARE ON THOSE CHORD STUDS. REFERENCE "SHEAR WALL SCHEDULE" ON SHEET S003. DENOTES WOOD WALL OPENING HEADER. REFERENCE "HEADER SCHEDULE" ON SHEET S003. SEE STUD SPACING AND HEADER PLANS FOR ALL HEADERS NOT LABELED ON PLAN. DENOTES WOOD ROOF TRUSS DENOTES WOOD BEAM 6 -(2) 8/12/16/16 STUD SPACING ON 1ST/2ND/3RD/4TH WOOD LEVELS REF. STUD SPACING PLAN AND HEADER PLANS. DOUBLE STUDS AT INDICATED SPACING WALL STUD SIZE H-X FRAMING PLAN LEGEND: C/S C/S C/S WOOD FLOOR FRAMING PLAN NOTES 1. REF. S000 SHEETS FOR STRUCTURAL NOTES, DESIGN DATA AND SCHEDULES. 2. REFERENCE THE ARCH. PLANS FOR LAYOUT OF ALL WALLS, OPENINGS, WALL TYPES, ETC. VERIFY ALL DIMENSIONS PRIOR TO DESIGN OF WALL PANELS & IMMEDIATELY NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES. 3. REFER TO THE HEADER SCHEDULE FOR HEADERS CALLED OUT ON FRAMING PLANS. REFER TO THE FRAMING PLANS FOR STUD SIZE & SPACING OF BEARING WALLS. IF NOT SHOWN OTHERWISE, STUDS ARE TO BE #2 SPF WITH STUD SPACING 16" O/C MAXIMUM. WALL PLATES ARE TO BE #2 SPF. IF NOT SHOWN OTHERWISE, BEARING WALL HEADERS ARE TO BE #2 SOUTHERN PINE (SP). SPF(S) IS NOT SPF AND MAY NOT BE USED. 4. THE GENERAL WOOD WALL DETAILS SHOW THE HEADERS AT THE TOP OF THE WALL. WHERE THERE ARE TALL WALLS SUCH AS WALLS THAT INCORPORATE A ROOF PARAPET ABOVE, OR 2 STORY WALLS, OR CEILING HEIGHTS OVER 11', THE HEADER WILL BE AT THE TOP OF THE OPENING. SUCH TALL WALLS WILL GENERALLY REQUIRE EXTRA KING STUDS AS INDICATED IN PLAN, SCHEDULE, OR DETAIL. 5. UNLESS OTHERWISE NOTED ON PLAN OR DETAIL, ANCHOR WOOD WALL PLATES TO THE CONCRETE FOUNDATION USING SIMPSON STRONG TIE TITEN HD HEAVY DUTY SCREW ANCHORS. SPACE ANCHORS AT 48" O/C FOR LOAD-BEARING AND NON-LOAD-BEARING WALLS. FOR SHEAR WALLS SEE THE SHEAR WALL SCHEDULE. FOR NON-STRUCTURAL WALLS W/ ONLY A SLAB BELOW USE THE MIN. REQUIREMENT OF THE CODE. 6. SHEAR WALL HARDWARE (CTS SYSTEM) IS CONTINUOUS VERTICALLY. CHORD STUDS AT THE HARDWARE LOCATION MUST STACK DIRECTLY IN LINE FOR THE FULL HEIGHT OF THE BUILDING. SEE DETAIL 10/S451. THIS MAY CAUSE SOME CHORD STUD AND HARDWARE LOCATIONS TO BE DICTATED BY THE LOCATION OF A WALL OPENING IN A WALL ABOVE OR BELOW THE LEVEL WHERE THE CHORD STUD AND HARDWARE OCCURS. PAY CAREFUL ATTENTION TO OPENING LOCATIONS ON ALL LEVELS IN LOCATING CHORD STUD AND HARDWARE. KEEP FLOOR TRUSSES OUT OF THE HARDWARE PATH. 7. SHEAR WALLS WITH ELECTRICAL PANELS OR RECESSED MEDICINE CABINETS MUST HAVE THE STRUCTURAL WOOD SHEATHING ON THE OPPOSITE SIDE FROM THE FACE OF THE ELECTRICAL PANEL OR RECESSED MEDICINE CABINET SO THAT NO WOOD SHEATHING IS REMOVED DURING THE INSTALLATION OF THE ELECTRICAL PANEL OR RECESSED MEDICINE CABINET. THE CONTINUITY OF THE SHEAR WALL SHEATHING IS ESSENTIAL. ANYTHING THAT CREATES A HOLE IN THE SHEAR WALL SHEATHING LARGER THAN A TYPICAL ELECTRICAL BOX OR WATER LINE IS NOT ACCEPTABLE & MUST BE REPAIRED. 8. IN BEARING WALLS WITH A NARROW STUD SPACING, THE SPACE BETWEEN STUDS MAY BE LESS THAN THE REQUIRED WIDTH FOR THE INSTALLATION OF AN ELECTRICAL PANEL, PASSAGE OF A DUCT, ETC. WHERE THIS OCCURS, A DOUBLE STUD MAY BE ADDED EACH SIDE TO CREATE A SPACE UP TO 14.5" BETWEEN STUDS IN 8" o/c WALLS, OR A SPACE UP TO 17" WIDE BETWEEN STUDS IN 12" o/c WALLS. IF A WIDER SPACE IS REQUIRED, A HEADER WILL BE NEEDED. SEE HEADER SCHEDULE & ITS FOOTNOTES. 9. 2X_ STUD BEARING WALLS SHALL HAVE STUD SPACING AS INDICATED ON THE PLANS. IF NOT SHOWN 16" O/C SHALL BE USED. WHERE A BEARING WALL IS A STAGGERED STUD WALL, STUD SPACING WILL BE 16" O/C ON EACH FACE OF THE WALL. 10. THE BALLOON FRAMING OF EXTERIOR WALLS PARALLEL TO THE FLOOR TRUSSES TO THE BOTTOM OF THE FLOOR DECK ABOVE IS REQUIRED. 11. AT BEARING OF ALL GIRDER TRUSSES, TRUSS MANUFACTURER SHALL PROVIDE THE WALL PANEL MANUFACTURER THE LOADS/REACTIONS OF ALL GIRDER TRUSSES. THE WALL PANEL MANUFACTURER SHALL INSTALL SUFFICIENT COLUMNS/STUDS TO SUPPORT ALL SUCH LOADS FROM THE GIRDER TRUSS BEARING DOWN TO A BEAM OR SLAB/FOUNDATION BELOW. THE CONTRACTOR SHALL ENSURE THE PRESENCE OF SUCH COLUMNS/STUDS. SIMILARLY, WHERE WALLS ARE FIELD-FRAMED, THE FRAMING CONTRACTOR SHALL INSTALL THE COLUMNS/STUDS FOR SUPPORT OF GIRDER TRUSSES. AS A MINIMUM THE NUMBER OF JACK STUDS SHOWN SHALL BE USED OR IF NOT SHOWN USE ONE STUD MORE THAN THE NUMBER OF GIRDER PLIES. 12. SUBFLOOR TO BE 3/4" APA-RATED SUBFLOOR WITH TONGUE & GROOVE EDGES. GLUE & NAIL TO FLOOR MEMBERS. ALL FLOORS TO RECEIVE 1.5"+/- SELF-LEVELING, CEMENT- BASED UNDERLAYMENT, REF. SPECIFICATIONS. 13. ALL FLOOR TRUSSES SHALL BE SINGLE PLY, SINGLE CHORD, & 24" o/c U.N.O. THE TRUSS SUPPLIER SHALL NOT USE MULTIPLE PLIES, MULTIPLE CHORDS, OR A TRUSS SPACING OTHER THAN THOSE SHOWN UNLESS THE TRUSS SUPPLIER COORDINATES WITH, AND RECEIVES THE APPROVAL OF THE MECHANICAL, ELECTRICAL, AND PLUMBING CONTRACTORS. 14. ALL FLOOR TRUSSES THAT CAN BE WILL BE SYMMETRICAL. CENTER CHASES NOT FOR THE PASSAGE OF BALCONY CANTILEVER BEAMS NEED NOT BE SYMMETRICAL. 15. THE USE OF A FLOOR TRUSS TOP CHORD STANDARD PANEL LENGTH OF LESS THAN THE INDUSTRY TYPICAL 30" SHALL NOT BE ALLOWED UNLESS THE TRUSS SUPPLIER COORDINATES WITH, AND RECEIVES THE APPROVAL OF THE MECHANICAL, ELECTRICAL, AND PLUMBING CONTRACTORS. 16. TO THE EXTENT POSSIBLE, GIRDER FLOOR TRUSSES SHALL HAVE MATCHING WEBS WITH THE ADJACENT FLOOR TRUSSES ALLOWING FOR EASE IN MEP INSTALLATION. 17. SEE THE ARCHITECTURAL DETAILS FOR ROOF TRUSS PROFILES (HEEL HEIGHTS, PITCHES, PARAPET DETAILS, ETC.). 18. WHEN SHOWN ON BUILDING OVERALL FRAMING PLANS, UNIT LABELS ARE FOR UNIT BELOW FLOOR & ROOF FRAMING SHOWN. 19. ALL SHEAR WALLS SHALL BE USED AS BEARING FOR FLOOR & ROOF TRUSSES WHEN NOT PARALLEL TO THE TRUSSES. 20. WHILE MOST ROOF AND FLOOR DIAPHRAGMS ARE NOT FULLY BLOCKED (SEE FRAMING PLAN FOR ANY FULLY BLOCKED AREAS), ANY CHANGES IN FRAMING DIRECTION OR CONTINUOUS CUTS IN THE SHEATHING (SUCH AS AT ROOF VALLEY LINES) MUST BE BLOCKED WITH THE SHEATHING EDGES FASTENED TO THE SAME MEMBER/BLOCKING USING EDGE NAILING. 21. THE TRUSS SUPPLIER MUST COORDINATE WITH M.E.P. AND SPRINKLER CONTRACTORS IN REGARD TO THE LOCATION AND WEIGHT OF ALL WATER SUPPLY MAINS AND SPRINKLER MAINS. THE TRUSSES WILL BE DESIGNED TO SUPPORT THE WEIGHT OF THESE POINT LOADS IN ADDITION TO OTHER LOADS AS SPECIFIED ON THESE PLANS. THE SPACING OF SUPPORTS FOR THESE LINES WILL BE AN IMPORTANT CONSIDERATION IN THE DESIGN OF THE TRUSSES FOR THE MAIN SUPPORT. SEE THE "SUPPLY MAIN SUPPORT DETAIL". 22. WHERE HOLDOWNS ARE USED, THE FRAMER OR WALL PANEL SUPPLIER MUST CONSIDER THE LOCATIONS OF ALL SHEAR WALL HOLDOWNS AND CREATE A FULL STUD SPACE ADJACENT TO THE SHEAR WALL CHORD STUDS FOR THE INSTALLATION OF THE OLDOWN. 23. ALL CONTRACTORS ARE REQUIRED TO COORDINATE THEIR WORK WITH ALL DISCIPLINES TO AVOID CONFLICTS. THE MECHANICAL, ELECTRICAL, AND PLUMBING ASPECTS ARE NOT IN THE SCOPE OF THESE DRAWINGS. THEREFORE, ALL REQUIRED MATERIALS AND WORK MAY NOT BE INDICATED. 24. BEAMS INDICATED TO BE LVL MATERIAL, WILL BE TRUSJOIST "2.0E MICROLAM LVL" OR BETTER, UNLESS NOTED OTHERWISE. PRECAST FRAMING LEGEND 1. PLAN LEGEND: FF DENOTES FINISH FLOOR PC DENOTES PRECAST CONCRETE CIP DENOTES CAST - IN - PLACE AE DENOTES AIR - ENTRAINED T/PC DENOTES TOP OF PRECAST ELEMENT NOM. PCC24x24 DENOTES PRECAST COLUMN SIZE DENOTES NOMINAL THICKNESS OF TOPPING- ACTUAL THINCKNESS IS DEPENDEDNT ON THE AMOUNT OF CAMBER IN PRECAST MEMBER T/PC+12'-0" DENOTES T/PRECAST (NOT TOPPING SLAB), OR SLAB ON GRADE ELEVATION DEFINING SLOPE TO FLOOR DRAINS 2. PRECAST MEMBER IDENTIFICATION: 'PCC' DENOTES PRECAST COLUMN 'IT' DENOTES PRECAST INVERTED TEE BEAM 'LB' DENOTES PRECAST 'L-SHAPED' BEAM 'RB' DENOTES PRECAST RECTANGULAR BEAM 'DT' DENOTES PRECAST DOUBLE TEE 'HC' DENOTES HOLLOW CORE PLANK PRECAST FRAMING NOTES 1. REFFERENCE THE S000 - SERIES STRUCTURAL NOTES FOR THE BUILDING DESIGN LOADS AND CRITERIA, GENERAL STRUCTURAL NOTES, COORDINATION WITH OTHER TRADES, ETC. 2. REFERENCE THE LOADING PLANS FOR UNIFORM, CONCENTRATED LINE AND POINT LOADS TO BE USED IN THE DESIGN OF THE PRECAST CONCRETE FRAMING SYSTEM. 3. REFERENCE THE S400 - SERIES FOR TYPICAL FOUNDATION, FRAMING, AND MASONRY DETAILS. 4. REFERENCE THE S500 - SERIES SECTION DRAWINGS FOR FOUNDATION & STRUCTURAL SECTIONS. 5. THE DESIGN OF PRECAST COLUMNS, BEAMS, DOUBLE TEES, WALLS, EMBED, INSERTS, CONNECTIONS, DIAPHRAGM REINFORCING, ETC. TO BE BY THE PRECAST SUPPLIER'S QUALIFIED ENGINEER/SPECIALTY STRUCTURAL ENGINEER. THE PRECAST STRUCUTRE SHALL BE DESIGNED TO SUPPORT THE CONSTRUCTION SHOWN ON THE STRUCTURAL DRAWINGS AND TO SUPPORT THE LOADS INDICATED ON THE LOADING PLANS. 6. THE LAYOUT AND ARRANGEMENT OF ALL PRECAST FRAMING IS SCHEMATIC IN NATURE AND INTENDED TO CONVEY THE ANTICIPATED SCOPE OF PRECAST STRUCTURE. THE FINAL LAYOUT AND ARRANGEMENT, SPACING, SIZE AND DPTH OF ALL MEMBERS SHALL BE DETERMINED BY THE PRECAST SUPPLIER IN CONSULTATION WITH THEIR QUALIFIED PROFESSIONAL ENGINEER (SPECIALTY STRUCTURAL ENGINEER). THE FRAMING INFORMATION SHOWN IS NOT MEANT TO BE RESTRICTIVE, NOT TO PREVENT THE PRECAST SUPPLIER FROM SUGGESTING POTENTIAL COST SAVINGS OR VALUE ENGINEERING ALTERNATIVES. MAXIMUM DEPTHS LISTED ON THE PLANS SHALL NOT BE EXCEEDED, UNLESS DETERMINED INSUFFICIENT TO SUPPORT THE SPECIFIED LOADS AND/OR MEET THE SPECIFIED DEFLECTION LIMITATIONS. MINIMUM CLEARANCES IN PARKING GARAGE DRIVE AISLES AND PARKING MUST BE MAINTAINED. 7. ALL ELEVATIONS ARE REFERENCED FROM THE FIRST FLOOR FINISH FLOOR ELEVATION, +0'-0" (USGS 852.0). FINISH FLOOR ELEVATIONS STATED ON THE DRAWINGS ARE TO TOP OF THE TOPPING SLAB ON PRE PRECAST PODIUM SECTIONS. 8. DIAPHRAGM NOTES: A) PROVIDE DIAPHRAGM REINGORCING IN SIZE, NUMBER AND LOCATION SHOWN ON THE PRECAST ERECTION PLAN. B) FABRICATE DIAPHRAGM REINFORCING IN LONGEST LENGTHS PRACTICAL. C) LAP SPLICES IN DIAPHRAGM REINFORCING A MINIMUM OF 48 BAR DIAMETERS. D) FURNISH 90 DEGREE HOOKS AT ALL INSIDE CORNERS. E) EXTEND REINFORCING A MINIMUM OF 6'-0" PAST INTERSECTING PERPENDICULAR REINFORCING AT ALL OUTSIDE CORNERS. F) G) AT TOPPING SLAB REINFORED WITH REBAR, EXTEND PERPENDICULAR REINFORCING OVER DIAPHRAGM REINFORCING. SUPPORT DIAPHRAGM REINFORCING ON CHAIRS/BOLSTERS. MAINTAIN DIAPHRAGM REINGORCING AS CLOSE TO CENTERED IN THE TOPPING SLAB AS POSSIBLE WHILE MAINTAINING SPECIFIED MINIMUM COVERAGES. ADJUST HEIGHT OF CHAIRS/BOLSTERS AS REQUIRED TO ACCOUNT FOR CAMBER IN PRECAST MEMBERS. K) AT FIRST FLOOR LEVEL, EXTEND W.W.F. OVER TOP OF DIAPHRAGM REINFORCING. I) AT STEPS IN TOPPING SLABS, FABRCATE DIAPHRAGM REINFORCING WITH SLOPES/BENDS, OR PROVIDE ADDITIONAL DIAPHRAGM CONTINUITY REINFORCING AT STEPS IN TOPPING SLABS. J) PROVIDE #4 x 5'-0" LONG DIAGONAL BARS AT CORNERS OF OPENINGS IN TOPPING SLABS AND AT ALL COLUMNS THAT PENETRATE THE TOPPING.ARCHITECTCLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS ENGINEERTHE SIGNATURECARMELCARMEL, INFOURTH FLOORFRAMING PLAN -AREA C20010 4/23/2021 PERMIT SET S104C 1/8" = 1'-0" 1 FOURTH FLOOR FRAMING PLAN - AREA C NORTH 10/12/21