Loading...
HomeMy WebLinkAboutS5132'-8" M 1'-8" PER PLAN & SCHEDULEPER SCHED. VARIES 8"EQUAL EQUAL FF +0'-0 1'-0" 2'-8" M 1'-8" PER PLAN & SCHEDULEPER SCHED. VARIES 8"EQUAL EQUAL FF +0'-0 1'-0" 2'-8" M 1'-8" 1'-0" Foundation Section Foundation Section Foundation Section 4" 2'-6" 11" 1'-2" 5" PER SCHED. 2'-0" UNO 8"8" FF +4'-0 Foundation Section 2'-6" 11"8" 11" PER SCHED. 2'-0" UNO 8"Foundation Section FF +4'-0 8" 2'-6" 11" 8" 11" PER SCHED. 2'-0" UNO 8"Foundation Section FF +4'-0 8" 2'-6" 11"8" 11" PER SCHED. 2'-0" UNO 8"Foundation Section FF +4'-0 PPT 6x6 WOOD POST W/ SIMPSON POST BASE 2'-6 12" UNO 1 2"SLOPE SLAB 1" AA 1'-0" 6" 8" AA 1'-0" 6" 8" 512" 2'-6" 11" 1'-0" 7" PER SCHED. 2'-0" UNO 8"6" FF +4'-0 Foundation Section 1112" 4" 8" 4"2'-0" UNO 8"8" FF +4'-0 Foundation Section AA 1'-0" 6" 8" PER PLAN & SCHEDULEPER SCHED. EQUAL EQUAL 2'-6" 11" 8" 11" PER SCHED. 11 2"CONCRETE PIER PER PLAN & SCHEDULE OVERSIZED PIER W/ #4@10" OC EW ON FACES W/O PIER MASONRY VENEER PER ARCH. DWGS. CMU BACKUP FOR MASONRY VENEER STEEL COLUMN PER PLAN COLUMN BASE PL & ANCHOR RODS PER DETAILS ON S412 BOLLARDS PER CIVIL DWGS. EXTER. PAVEMENT PER CIVIL DWGS. CONC. FDN. FOR BOLLARD PER CIVIL DWGS. COLUMN FTG. PER PLAN & SCHEDULE OVERSIZED PIER W/ #4@10" OC EW ON FACES W/O PIER EXTER. PAVEMENT PER CIVIL DWGS. CONC. FDN. FOR BOLLARD PER CIVIL DWGS. COLUMN FTG. PER PLAN & SCHEDULE T/FTG PER PLAN T/FTG PER PLAN BOLLARDS PER CIVIL DWGS. MASONRY VENEER PER ARCH. DWGS. 16"x16" CMU PIER W/ (4)#6 VERT. BACKUP FOR MASONRY VENEER LINE OF MASONRY COLUMN SURROUND BEYOND METAL SCREEN PER ARCH. DWGS. EXTER. WALK OR LAWN- PER CIVIL DWGS.FF +0'-0 EXTER. PAVEMENT PER CIVIL DWGS. MASONRY VENEER PER ARCH. DWGS. EXTER. WALK OR LAWN- PER CIVIL DWGS. BUMPOUT FOR MASONRY PIER. PROVIDE SUPPLML. #4 @ 10" OC EW INSULATION PER ARCH. DWGS. SLAB ON GRADE PER PLAN & SCHEDULE WALL FTG. PER PLAN & SCHEDULE T/FTG PER PLAN WOOD STUDS PER PLAN & SCHEDULE #4 @ 18" OC 2'-0 2'-0LINE OF MASONRY PIER BEYOND GLAZING PER ARCH. DWGS. EXTER. WALK OR LAWN- PER CIVIL DWGS. INSULATION PER ARCH. DWGS. SLAB ON GRADE PER PLAN & SCHEDULE WALL FTG. PER PLAN & SCHEDULE #4 @ 18" OC 2'-0 2'-0#4 HORIZ. @ 10" OC #4 DOWELS @ 18" OC CONCRETE PIER PER PLAN & SCHEDULE COLUMN FTG. PER PLAN & SCHEDULE STEEL COLUMN PER PLAN COLUMN BASE PL & ANCHOR RODS PER DETAILS ON S412 MASONRY VENEER PER ARCH. DWGS. EXTER. WALK OR LAWN- PER CIVIL DWGS. T/FTG PER PLAN T/FTG PER PLAN #4 HORIZ. @ 10" OC #4 DOWELS @ 18" OC T/FTG PER PLAN SLAB ON GRADE PER PLAN & SCHEDULE #4 @ 18" OC 2'-0 2'-0SHEATHING & EXTER. FIN. PER ARCH. DWGS. WOOD STUDS PER PLAN & SCHEDULE EXTER. WALK OR LAWN- PER CIVIL DWGS. INSULATION PER ARCH. DWGS. INSULATION PER ARCH. DWGS. SLAB ON GRADE PER PLAN & SCHEDULE #4 @ 18" OC 2'-0 2'-0BUMPOUT FOR MASONRY PIER. PROVIDE SUPPLML. #4 @ 10" OC EW T/FTG PER PLAN T/FTG PER PLAN EXTEND THICKENED SLAB AT PPT POSTS8" COMPACTED FILL SLAB ON GRADE PER PLAN & SCHEDULE SLAB ON GRADE PER PLAN & SCHEDULE #4 @ 18" OC 2'-0 2'-0SHEATHING & EXTER. FIN. PER ARCH. DWGS. WOOD STUDS PER PLAN & SCHEDULE INSULATION PER ARCH. DWGS. #4 HORIZ. @ 10" OC #4 DOWELS @ 18" OC COLUMN WRAP & TRIM PER ARCH. DWGS. 2'-8" 1'-4"1'-8" J 1'-8" 6 9" 9" 12'-614"2'-8"Foundation Section PER PLAN & SCHEDULE EQUAL EQUAL Foundation Section Foundation Section FF +0'-0 #4 STIRRUPS @ 10" OC 1-SET (4)#9 TOP & BOT. DIAGONAL BRACES PER BRACING ELEVATIONS ON S300 SERIES DWGS. DIAGONAL BRACE PER BRACING ELEVATIONS ON S300 SERIES DWGS. BRACE BASE PL1 x 24 x 2'-8 W/ (6) 114 " DIA. ANCHOR RODS PER DETAILS ON S412 GUSSET PL-REF. BRACING ELEVATIONS ON S300 SERIES DWGS. 1'-0" 1'-0" BRACE BASE PL1 x 24 x 2'-8 W/ (6) 114 " DIA. ANCHOR RODS PER DETAILS ON S412 EXTEND TIE BEAM REINF. TO FAR SIDE OF COLUMN FTG. COLUMN FTG. PER PLAN & SCHEDULE SLAB ON GRADE PER PLAN & SCHEDULE COLUMN BASE PL & ANCHOR RODS PER DETAILS ON S412 SLAB CONSTRUCTION JOINT PER 3/S411 FUTURE TENANT BUILDOUT SLAB ON GRADE. EXTEND VAPOR RETARDER FOR MIN. 18" LAP STEEL COLUMN PER PLAN GUSSET PL-REF. BRACING ELEVATIONS ON S300 SERIES DWGS. 18'-0" 3 3 FF +0'-0 1'-0" PER SCHED. PER PLAN & SCHEDULE EQUAL EQUAL Foundation Section2'-8" T/W +4'-8 5'-1178"COLUMN FTG. PER PLAN & SCHEDULE STEEL COLUMN PER PLAN NOTE: THE CIP RETAINING WALL MUST BE CAST AFTER THE STRUCTURAL STEEL HAS BEEN ERECTED AND BRACING CONNECTIONS COMPLETED #4 DOWELS @ 12" OC #4 HORIZ. @ 10" OC #4 VERT. @ 12" OC EXTEND TIE BEAM REINF. TO FAR SIDE OF PIER DAMP-PROOFING PER ARCH. DWGS. SURFACE FINISH - 3.0 CLASS 'A' CFS 'ZEE' FURRING NOT SHOWN FOR CLARITY SLAB ON GRADE PER PLAN & SCHEDULE COLUMN BASE PL & ANCHOR RODS PER DETAILS ON S412 18'-0" 6 ARCHITECT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20010 4/23/2021 PERMIT SET ENGINEERCLIENT THE SIGNATURECARMELCARMEL, INS513FOUNDATIONSECTIONS 10/12/21