HomeMy WebLinkAboutS520P18 COLUMN FTG. PER PLAN & SCHEDULE T/FTG PER PLAN PER SCHEDULEPRECAST COLUMN BASE PL & ANCHOR RODS PER PC SUPPLIER PRECAST COLUMN SLAB ON GRADE PER PLAN & SCHEDULE PER PLAN & SCHEDULE EQUAL EQUAL OUTLINE OF FDN. WALL IN FOREGROUND & BEYOND REF. +0'-0 (852.00) FF +4'-0 PER SCHED. 1'-4" 8"1'-4"FF +2'-0 #4 DOWELS @ 18" OC #4 HORIZ. @ 10" OC #4 @ 18" OC 2'-0 2'-0T/FTG PER PLAN FF +2'-0 P18 SLAB ON GRADE PER PLAN & SCHEDULE WALL FTG. PER PLAN & SCHEDULE FF +4'-0 COMPACTED FILL Foundation Section 2'-6" 11" 8" 11" Foundation Section FF +5-0 1'-0"FF +4'-0 P22 SLAB ON GRADE PER PLAN & SCHEDULE Foundation Section (2)#5 8" 8" 1'-012" 12" SLAB ON GRADE PER PLAN & SCHEDULE SLAB ON GRADE PER PLAN & SCHEDULE 20010 4/23/2021 PERMIT SETTHE SIGNATURECARMELCARMEL, INS520FOUNDATIONSECTIONS 10/12/21