HomeMy WebLinkAboutEngineer Plan Certification CheckList 03-16-22Specifications and Guidelines for Plan Design 7
By affixing my seal below, I, the applicant and duly appointed representative of the owner, hereafter referred to as the
petitioner, indicate that all the above requirements listed on the preceding six pages have been met, or, in the case of a
non-applicable response or in the case of answering "no" to any of the above statements, have attached a letter and
proper documentation stating the reason for not complying with the above said requirements. Submitting plans along
with this stamped and signed document obligates me, the petitioner, to agree to the following requests by the
Department of Engineering hereafter referred to as the reviewer. The petitioner will notify the reviewer in the event of
any changes to the submitted plans and is required to submit revised drawings for approval that highlight those
changes from the petitioner's previously submitted plans. The reviewer reserves the right to request that changes be
made to the plans at any point in the petitioner's design process. In the event that any of the requirements are not
found fulfilled by the petitioner as guaranteed by this agreement, the reviewer reserves the right to return the plans
and delay reviewing and approval until all requirements are met, or are eliminated by the reviewer depending on their
applicability to the project. The reviewer also stipulates that the petitioner wait to submit revised drawings and
responses to the reviewer's comments until they have included revisions based on comments from Crossroad
Engineers' review of the drainage report and calculations. It is also understood with the submittal, that upon approval
by the reviewer, the Board of Public Works and Safety and the other approval entities that exist will not in turn
automatically approve the petitioner's plans.
Fix Date
City of Carmel Departm nt of Engineering