Loading...
HomeMy WebLinkAboutSubdivider 03-16-22CUY OF CARME L SUBDIVISION CONTROL ORDINANCE 9.06 Subdivider Agreement Forms. 9906,01 The following agreement shall be included as a submittal with the final plat approval application: AGREEMENT The developer shall be responsible for any drainage problems, including standing water, flooding and erosion control, which arise or become evident at any time during the 3 year maintenance period after the release of the subdivision bond, and which is attributable to a deficiency in subdivision drainage design or construction of drainage improvements. This shall Include all pipes, structures, swaa le ditches and ponds which are pertinent features to the proper drainage of the subdivision. This responsibility of the developer shall not, however, include problems which are created subsequent to the completion of the subdivision improvements by the improper grading by individual builders or structures and improper grading installed or accomplished by individual homeowners. It is the Intent of this agreement that the developer shall specifically provide such subsurface drains, or storm sewers or ditches, as are requited to properly rectify any drainage problem or sub -surface water problem which was not contemplated in the original approved subdivision design, including, but not restricted to, disposal of subsurface water from footing drains of individual lots. ROAD IMPROVEMENTS: The typical agreement for existing contiguous Hamilton County Roads which are substandard, with Hamilton County Is: The developer will put in 12-inch stone base to the required width of the road, and grade the shoulders to a minimum of 6 feet width and construct proper side -ditches, or, provide storm sewer and curbs. This will be the black top grade during construction of subdivision. Then the county will come in and cut our 3 inches and put in 3 inches binder asphalt after which the developer will be responsible for 1 inch of asphalt topping. This is being done asjoint projects between county and developer. An agreement shall be executed, in writing, betweenthe developer and Hamilton county specifically detailing the exact work to be accomplished by the developer and that to be accomplished by the County, and shall also state the road or roads or portions thereof which are included. If the subdivision is contemplated to be annexed to the City of Carmel, then the agreement shall include the City of Carmel Board of Public Works as a signatory, which shall be for the purpose of the City of Carmel agreeing to accept the mainte n a and operation, the improved road facility upon completion of said improvements and co eti n of annexation. Se,/q/G,A�� March 16, 2022 B. Wagner — Date Audrey Richards Chapter 9: Plat Certificates, Deed of Dedication 9-6 as adopted per Z160; as amended per Z486-06 Spring 2006 A