HomeMy WebLinkAboutSW Management Permit 03-16-22City of Carmel
STORMWATER MANAGEMENT PERMIT APPLICATION
/NNIPNP
Perm t #:
Submission of this application constitutes notice that the project site owner is applying for coverage under the Carmel City Code §6480
through §6-209 for stormwater discharges associated with construction activity disturbing'/a acre or more of land. Permitted project site
owners are required to comply with all terms and conditions of the Carmel City Code.
Project Name: Jackson's Grant Village, Section 2
Project Location: Northwest corner 116th Street and
Spring Mill Road,
Quarter: SE Section:34 Township:18N
Range:3E
Project Site Owner Name: Douglas B. Wagner
9 9
Title/Position:
Senior Vice President
Company: Jackson's Grant Real Estate Company,
LLC
Add"':13578 East 131 st Street, Suite 200
City: Fishers state`
Indiana zip:
46037
Phone: 317-770- I ftb Fax.
E-mail Address:
dwag ner@ republicdev.com
swPPPContact Person: Douglas B. Wagner
Company NameJackson's Grant Real Estate, Co., LLC
Affiliation to Project Site Owner:
Same
Address (If differentfrom above):
City: State:
7ip;
Phone: Fax:
E-mail Address:
Estimated Project Duration: June 2022 thru June 2027
By signing this application, I certify the following:
A. The storm water quality measures included in the Storm Water Pollution Prevention Plan (SWPPP) comply with the requirements of
§6-180 through §6-209 of the Carmel City Code, the City of Carmel Stormwater Technical Standards Manual, and all applicable
federal, state, and local stormwater requirements;
B. The measures required by the Stormwater Pollution Prevention Plan (SWPPP) shall be implemented;
C. Stormwater quality measures beyond those specified in the Stormwater Pollution Prevention Plan (SWPPP) will be implemented
during the life of the permit if necessary to comply with the Carmel City Code; and
D. Implementation of stormwater quality measures will be inspected by trained individuals;
E. Pursuant to Carmel City Code § 6-205, the City reserves the right to inspect and/or implement the stormwater quality measures
outlined in the Stormwater Pollution Prevention Plan (SWPPP) or provide maintenance thereto, at my expense, if not performed.
-9 3 Douglas B. Wagner Qt y P March 16, 201
Signatm of Project Owner Printed Name Date
Permit Approved: Engineering Department
Date
Approval of this applicafion cous6tutes acceptance of the Storm Water Pollution Prevenfion Plan (SWPPP) by the City of Carmel.